978 resultados para Operational planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – Virtual prototyping technologies linked to building information models are commonplace within the aeronautical and automotive industries. Their use within the construction industry is now emerging. The purpose of this paper is to show how these technologies have been adopted on the pre-tender planning for a typical construction project. Design/methodology/approach – The research methodology taken was an “action research” approach where the researchers and developers were actively involved in the production of the virtual prototypes on behalf of the contractor thereby gaining consistent access to the decisions of the planning staff. The experiences from the case study were considered together with similar research on other construction projects. Findings – The findings from the case studies identify the role of virtual prototyping in components modelling, site modelling, construction equipment modelling, temporary works modelling, construction method visualization and method verification processes. Originality/value – The paper presents a state-of-the-art review and discusses the implications for the tendering process as these technologies are adopted. The adoption of the technologies will lead to new protocols and changes in the procurement of buildings and infrastructure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Organisations are increasingly investing in complex technological innovations such as enterprise information systems with the aim of improving the operations of the business, and in this way gaining competitive advantage. However, the implementation of technological innovations tends to have an excessive focus on either technology innovation effectiveness (also known as system effectiveness), or the resulting operational effectiveness; focusing on either one of them is detrimental to the long-term enterprise benefits through failure to achieve the real value of technological innovations. The lack of research on the dimensions and performance objectives that organisations must be focusing on is the main reason for this misalignment. This research uses a combination of qualitative and quantitative, three-stage methodological approach. Initial findings suggest that factors such as quality of information from technology innovation effectiveness, and quality and speed from operational effectiveness are important and significantly well correlated factors that promote the alignment between technology innovation effectiveness and operational effectiveness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports the initial steps of research on planning of rural networks for MV and LV. In this paper, two different cases are studied. In the first case, 100 loads are distributed uniformly on a 100 km transmission line in a distribution network and in the second case, the load structure become closer to the rural situation. In case 2, 21 loads are located in a distribution system so that their distance is increasing, distance between load 1 and 2 is 3 km, between 2 and 3 is 6 km, etc). These two models to some extent represent the distribution system in urban and rural areas, respectively. The objective function for the design of the optimal system consists of three main parts: cost of transformers, and MV and LV conductors. The bus voltage is expressed as a constraint and should be maintained within a standard level, rising or falling by no more than 5%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is an attempt to present the current state of product and process modelling in the building industry in general, and in construction planning and scheduling in particular. This report endeavours to describe what has been achieved by the Construction Planning Workbench (CPW) project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on a study of students choosing the International Baccalaureate Diploma (IBD) over state-based curricula in Australian schools. The IBD was initially designed as a matriculation certificate to facilitate international mobility. While first envisaged as a lifestyle agenda for cultural elites, such mobility is now widespread with more people living ‘beyond the nation’ through choice or circumstance. Beck (2007) and others highlight how the capacity to cross national borders offers a competitive edge with which to strategically pursue economic and cultural capital. Beck’s ‘border artistes’ are those who use national borders to their individual advantage through reflexive strategy. The study explored the rationales and strategy behind the choice of the IBD curriculum expressed by students in a focus group interview and an online survey. This paper reports on their imagined transnational routes and mobile orientations, and how a localised curriculum limits their imagined mobile futures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Simulation is widely used as a tool for analyzing business processes but is mostly focused on examining abstract steady-state situations. Such analyses are helpful for the initial design of a business process but are less suitable for operational decision making and continuous improvement. Here we describe a simulation system for operational decision support in the context of workflow management. To do this we exploit not only the workflow’s design, but also use logged data describing the system’s observed historic behavior, and incorporate information extracted about the current state of the workflow. Making use of actual data capturing the current state and historic information allows our simulations to accurately predict potential near-future behaviors for different scenarios. The approach is supported by a practical toolset which combines and extends the workflow management system YAWL and the process mining framework ProM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PROJECT BRIEF Information provided by the Built Environment Industry Innovation Council as background to this project includes the following information on construction and innovation within the industry. • The construction industry contributes around $67 billion to GDP and employs around 970,000 and generates exports of nearly $150 million. • The industry has one of the lowest innovation rates of any industry in Australia, ranking third last across all Australian industries in terms of its proportion of business expenditure on innovation, and second last in terms of the proportion of income generated from innovation (ABS, 2006). • Key innovation challenges include addressing energy and water use efficiency, and housing costs in preparing for the implementation of the Carbon Pollution Reduction Scheme. The sector will need to build its capability and capacity to deliver the technical and operational expertise required.The broader Built Environment Innovation Project aims to address the following two objectives: 1. Identify current innovative practice across the Built Environment industry. 2. Develop a knowledge exchange strategy for this information to be disseminated to all industry stakeholders. Industry practice issues are critical to the built environment industry’s ability to innovate, and the BRITE project from the CRC for Construction Innovation has previously undertaken work to identify the key factors that drive innovation. Part 1 of the current project aims to extend this work by conducting a stocktake of current and emerging innovative practices within the built environment industry. Part 2 of the project addresses the second of these objectives, that is, to recommend a knowledge exchange strategy for promoting the wider uptake of innovative practices that makes the information identified in Part 1 of the study (on emerging innovative practices) accessible to Australian built environment industry stakeholders. The project brief was for the strategy to include a mechanism to enable this information resource to be updated as new initiatives/practices are developed. A better understanding of the built environment industry’s own knowledge infrastructure also has the potential to enhance innovation outcomes for the industry. This project will develop a coordinated knowledge exchange strategy, informed by the best available information on current innovation practices within the industry and suggest directions for gaining a better understanding of: the industry contexts that lead to innovative practices; the industry (including enterprise and individual) drivers for innovation; and appropriate knowledge exchange pathways for delivering future industry innovation. A deliverable of Part 2 will be a recommendation for a knowledge exchange strategy to accelerate adoption of innovative practices in the built environment industry, including resource implications and how such a recommendation could be taken forward as an ongoing resource.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Decision Support System (DSS) has played a significant role in construction project management. This has been proven that a lot of DSS systems have been implemented throughout the whole construction project life cycle. However, most research only concentrated in model development and left few fundamental aspects in Information System development. As a result, the output of researches are complicated to be adopted by lay person particularly those whom come from a non-technical background. Hence, a DSS should hide the abstraction and complexity of DSS models by providing a more useful system which incorporated user oriented system. To demonstrate a desirable architecture of DSS particularly in public sector planning, we aim to propose a generic DSS framework for consultant selection. It will focus on the engagement of engineering consultant for irrigation and drainage infrastructure. The DSS framework comprise from operational decision to strategic decision level. The expected result of the research will provide a robust framework of DSS for consultant selection. In addition, the paper also discussed other issues that related to the existing DSS framework by integrating enabling technologies from computing. This paper is based on the preliminary case study conducted via literature review and archival documents at Department of Irrigation and Drainage (DID) Malaysia. The paper will directly affect to the enhancement of consultant pre-qualification assessment and selection tools. By the introduction of DSS in this area, the selection process will be more efficient in time, intuitively aided qualitative judgment, and transparent decision through aggregation of decision among stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background - This study examined demographic profile, continuation rates and reasons for removal among Implanon® users accessing two family planning clinics in Queensland, Australia. Study Design - A retrospective chart audit of 976 women who attended for implant insertion over a 3-year period between May 2001 and May 2004. Results - Continuation rates showed that at 6 months after insertion, 94% of women continued, 74% continued at 1 year and 50% continued at 2 years. Metropolitan women were more likely than rural women to discontinue use because of dissatisfaction with bleeding patterns. Cox regression analysis showed that those attending the regional clinic experienced significantly shorter time to removal. Conclusions - Implanon® continuation rates and reasons for removal differ between clinics in metropolitan and rural locations. A cooling-off period did not affect the likelihood of continuation with Implanon®. Preinsertion counselling should emphasize potential changes in bleeding patterns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most infrastructure projects share the same characteristics in term of management aspects and shortcomings. Human factor is believed to be the major drawbacks due to the nature of unstructured problems which can further contribute to management conflicts. This growing complexity in infrastructure projects has shift the paradigm of policy makers to adopt Information Communication Technology (ICT) as a driving force. For this reason, it is vital to fully maximise and utilise the recent technologies to accelerate management process particularly in planning phase. Therefore, a lot of tools have been developed to assist decision making in construction project management. The variety of uncertainties and alternatives in decision making can be entertained by using useful tool such as Decision Support System (DSS). However, the recent trend shows that most DSS in this area only concentrated in model development and left few fundamentals of computing. Thus, most of them were found complicated and less efficient to support decision making within project team members. Due to the current incapability of many software aspects, it is desirable for DSS to provide more simplicity, better collaborative platform, efficient data manipulation and reflection to user needs. By considering these factors, the paper illustrates four challenges for future DSS development i.e. requirement engineering, communication framework, data management and interoperability, and software usability

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Joint ventures can take many forms and can be formed for different reasons, from sharing resources to creating future business opportunities. At the same time, there is increasing interest and discussion of alternative procurement methods, moving away from traditional procurement systems to relational approaches. Business systems and strategies need to be redefined and move from a short-term project to project culture to a more strategic, long-term perspective. Joint ventures of construction organisations, global and local, have become increasingly popular to deliver large-scale infrastructure construction projects. However, successful strategic collaborations require project organisations to formulate a fit between contractual and operational arrangements for each situation. This study reviews the movement from traditional procurement methods towards relational contracting approaches in Queensland, Australia. The study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. This paper reports on initial findings captured from a survey undertaken with construction contracting organisations in Australia, focusing on the supply chain relationships. Contractors’ perceptions of the relationship management process and the engagement of the supply chain are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The paper aims to describe a workforce-planning model developed in-house in an Australian university library that is based on rigorous environmental scanning of an institution, the profession and the sector. Design/methodology/approach – The paper uses a case study that describes the stages of the planning process undertaken to develop the Library’s Workforce Plan and the documentation produced. Findings – While it has been found that the process has had successful and productive outcomes, workforce planning is an ongoing process. To remain effective, the workforce plan needs to be reviewed annually in the context of the library’s overall planning program. This is imperative if the plan is to remain current and to be regarded as a living document that will continue to guide library practice. Research limitations/implications – Although a single case study, the work has been contextualized within the wider research into workforce planning. Practical implications – The paper provides a model that can easily be deployed within a library without external or specialist consultant skills, and due to its scalability can be applied at department or wider level. Originality/value – The paper identifies the trends impacting on, and the emerging opportunities for, university libraries and provides a model for workforce planning that recognizes the context and culture of the organization as key drivers in determining workforce planning. Keywords - Australia, University libraries, Academic libraries, Change management, Manpower planning Paper type - Case study

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Virtual world platforms such as Second Life have been successfully used in educational contexts to motivate and engage learners. This article reports on an exploratory workshop involving a group of high school students using Second Life for an urban planning project. Young people are traditionally an under-represented demographic when it comes to participating in urban planning and decision making processes. The research team developed activities that combined technology with a constructivist approach to learning. Real world experiences and purposes ensured that the workshop enabled students to see the relevance of their learning. Our design also ensured that play remained an important part of the learning. By conceiving of the workshop as a ‘serious playground’ we investigated the ludic potential of learning in a virtual world.