989 resultados para Mining engineering


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The device we study is the excavation arm of a large hydraulic mining shovel having a multi-loop kinematic form. We describe an iterative algorithm that allows the position of the bucket to be tracked from measurements of the linear actuator extensions. The important characteristic of this algorithm is that it is numerically well-behaved when the linkage is close to singular configurations. While we focus on a specific device, the algorithm is easy to adapt to other multi-loop linkages. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A concept has been developed where characteristic load cycles of longwall shields can describe most of the interaction between a longwall support and the roof. A characteristic load cycle is the change in support pressure with time from setting the support against the roof to the next release and movement of the support. The concept has been validated through the back-analysis of more than 500 000 individual load cycles in five longwall panels at four mines and seven geotechnical domains. The validation process depended upon the development of new software capable of both handling the large quantity of data emanating from a modern longwall and accurately delineating load cycles. Existing software was found not to be capable of delineating load cycles to a sufficient accuracy. Load-cycle analysis can now be used quantitatively to assess the adequacy of support capacity and the appropriateness of set pressure for the conditions under which a longwall is being operated. When linked to a description of geotechnical conditions, this has allowed the development of a database for support selection for greenfield sites. For existing sites, the load-cycle characteristic concept allows for a diagnosis of strata-support problem areas, enabling changes to be made to set pressure and mining strategies to manage better, or avoid, strata control problems. With further development of the software, there is the prospect of developing a system that is able to respond to changes in strata-support interaction in real time.

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper outlines the methodology of blast fragmentation modeling undertaken for a green field feasibility study at the Riska gold deposit in Indonesia. The favoured milling process for the feasibility study was dump leaching,with no crushing of the ore material extracted from the pit. For this reason,blast fragmentation was a critical issue to be addressed by the study. A range of blast designs were considered with bench heights and blasthole diameters ranging from 4 m to 7 m and 76 mm to 102 mm respectively. Rock mass data was obtained from 19 diamond drill cores across the deposit (total drill length approximately 2200 m). Intact rock strength was estimated from qualitative strength descriptors,while the in situ block size distribution of the rock mass was estimated from the Rock Quality Designation (RQD) of the core.