846 resultados para Job vacancies
Resumo:
A Batch Processing Machine (BPM) is one which processes a number of jobs simultaneously as a batch with common beginning and ending times. Also, a BPM, once started cannot be interrupted in between (Pre-emption not allowed). This research is motivated by a BPM in steel casting industry. There are three main stages in any steel casting industry viz., pre-casting stage, casting stage and post-casting stage. A quick overview of the entire process, is shown in Figure 1. There are two BPMs : (1) Melting furnace in the pre-casting stage and (2) Heat Treatment Furnace (HTF) in the post casting stage of steel casting manufacturing process. This study focuses on scheduling the latter, namely HTF. Heat-treatment operation is one of the most important stages of steel casting industries. It determines the final properties that enable components to perform under demanding service conditions such as large mechanical load, high temperature and anti-corrosive processing. In general, different types of castings have to undergo more than one type of heat-treatment operations, where the total heat-treatment processing times change. To have a better control, castings are primarily classified into a number of job-families based on the alloy type such as low-alloy castings and high alloy castings. For technical reasons such as type of alloy, temperature level and the expected combination of heat-treatment operations, the castings from different families can not be processed together in the same batch.
Resumo:
We determine the electronic properties and dielectric response of zirconia (ZrO2) with oxygen vacancies (O vacancies) and Ti doping using first-principles density functional theory calculations based on pseudopotentials and a plane wave basis. We find significantly enhanced static dielectric response in zirconia with Ti doping and introduction of oxygen vacancies. Softening of phonon modes are responsible for the enhanced dielectric response of doped samples compared to pure zirconia.
Resumo:
This thesis analyzes how matching takes place at the Finnish labor market from three different angles. The Finnish labor market has undergone severe structural changes following the economic crisis in the early 1990s. The labor market has had problems adjusting from these changes and hence a high and persistent unemployment has followed. In this thesis I analyze if matching problems, and in particular if changes in matching, can explain some of this persistence. The thesis consists of three essays. In the first essay Finnish Evidence of Changes in the Labor Market Matching Process the matching process at the Finnish labor market is analyzed. The key finding is that the matching process has changed thoroughly between the booming 1980s and the post-crisis period. The importance of the number of unemployed, and in particular long-term unemployed, for the matching process has vanished. More unemployed do not increase matching as theory predicts but rather the opposite. In the second essay, The Aggregate Matching Function and Directed Search -Finnish Evidence, stock-flow matching as a potential micro foundation of the aggregate matching function is studied. In the essay I show that newly unemployed match mainly with the stock of vacancies while longer term unemployed match with the inflow of vacancies. When aggregating I still find evidence of the traditional aggregate matching function. This could explain the huge support the aggregate matching function has received despite its odd randomness assumption. The third essay, How do Registered Job Seekers really match? -Finnish occupational level Evidence, studies matching for nine occupational groups and finds that very different matching problems exist for different occupations. In this essay also misspecification stemming from non-corresponding variables is dealt with through the introduction of a completely new set of variables. The new outflow measure used is vacancies filled with registered job seekers and it is matched by the supply side measure registered job seekers.
Resumo:
The present work concerns with the static scheduling of jobs to parallel identical batch processors with incompatible job families for minimizing the total weighted tardiness. This scheduling problem is applicable in burn-in operations and wafer fabrication in semiconductor manufacturing. We decompose the problem into two stages: batch formation and batch scheduling, as in the literature. The Ant Colony Optimization (ACO) based algorithm called ATC-BACO algorithm is developed in which ACO is used to solve the batch scheduling problems. Our computational experimentation shows that the proposed ATC-BACO algorithm performs better than the available best traditional dispatching rule called ATC-BATC rule.
Resumo:
We consider the problem of matching people to jobs, where each person ranks a subset of jobs in an order of preference, possibly involving ties. There are several notions of optimality about how to best match each person to a job; in particular, popularity is a natural and appealing notion of optimality. However, popular matchings do not always provide an answer to the problem of determining an optimal matching since there are simple instances that do not adroit popular matchings. This motivates the following extension of the popular rnatchings problem:Given a graph G; = (A boolean OR J, E) where A is the set of people and J is the set of jobs, and a list < c(1), c(vertical bar J vertical bar)) denoting upper bounds on the capacities of each job, does there exist (x(1), ... , x(vertical bar J vertical bar)) such that setting the capacity of i-th, job to x(i) where 1 <= x(i) <= c(i), for each i, enables the resulting graph to admit a popular matching. In this paper we show that the above problem is NP-hard. We show that the problem is NP-hard even when each c is 1 or 2.
Resumo:
A model comprising several servers, each equipped with its own queue and with possibly different service speeds, is considered. Each server receives a dedicated arrival stream of jobs; there is also a stream of generic jobs that arrive to a job scheduler and can be individually allocated to any of the servers. It is shown that if the arrival streams are all Poisson and all jobs have the same exponentially distributed service requirements, the probabilistic splitting of the generic stream that minimizes the average job response time is such that it balances the server idle times in a weighted least-squares sense, where the weighting coefficients are related to the service speeds of the servers. The corresponding result holds for nonexponentially distributed service times if the service speeds are all equal. This result is used to develop adaptive quasi-static algorithms for allocating jobs in the generic arrival stream when the load parameters are unknown. The algorithms utilize server idle-time measurements which are sent periodically to the central job scheduler. A model is developed for these measurements, and the result mentioned is used to cast the problem into one of finding a projection of the root of an affine function, when only noisy values of the function can be observed
Resumo:
The purpose of this study was to examine whether trust in supervisor and trust in senior management enhance employees' job satisfaction and organizational commitment, and whether trust mediates the relationship between perceived justice and these outcomes. Trust in supervisor was expected to mediate the effects of distributive justice and interactional justice, and trust in senior management was expected to mediate the effects of procedural justice. Theoretical background of the study is based on the framework for trust in leadership developed by Dirks and Ferrin (2002). According to the framework, perceived fairness of leaders' actions helps employees to draw inferences about the basis of the relationship and about leaders' characters. This allows trust formation. Reciprocation of care and concern in the relationship and confidence in leaders' characters are likely to enhance employees' job satisfaction and organizational commitment. This study was conducted with cross-sectional data (A/ = 960) of employees from social and health care sector. Hypotheses were studied using correlation analysis and several hierarchical regression analyses. Significances of the mediations were assessed using the Sobel test. Results partially supported the hypotheses. Trust in leadership was positively related to job satisfaction and organizational commitment. Trust in senior management mediated the relationship between procedural justice and the outcomes. Some support was also found for the mediating effect of trust in supervisor in the relationship between distributive justice and organizational commitment. Due to high correlation between trust in supervisor anil interactional justice, it wasn't possible to study the mediating e fleet of trust in supervisor in the relationship between interactional justice and the outcomes. Against expectations, results indicated that trust in senior management had a mediating effect in the relationship between distributive justice and organizational commitment, and in the relationship between interactional justice and organizational commitment. Results also indicated that trust in supervisor had a mediating effect in the relationship between procedural justice and organizational commitment.
Resumo:
We consider the problem of minimizing the total completion time on a single batch processing machine. The set of jobs to be scheduled can be partitioned into a number of families, where all jobs in the same family have the same processing time. The machine can process at most B jobs simultaneously as a batch, and the processing time of a batch is equal to the processing time of the longest job in the batch. We analyze that properties of an optimal schedule and develop a dynamic programming algorithm of polynomial time complexity when the number of job families is fixed. The research is motivated by the problem of scheduling burn-in ovens in the semiconductor industry
Resumo:
We perform first-principles calculations of the quasiparticle defect states, charge transition levels, and formation energies of oxygen vacancies in rutile titanium dioxide. The calculations are done within the recently developed combined DFT + GW formalism, including the necessary electrostatic corrections for the supercells with charged defects. We find the oxygen vacancy to be a negative U defect, where U is the defect electron addition energy. For Fermi level values below similar to 2.8 eV (relative to the valence-band maximum), we find the +2 charge state of the vacancy to be the most stable, while above 2.8 eV we find that the neutral charge state is the most stable.
Minimizing total weighted tardiness on heterogeneous batch processors with incompatible job families
Resumo:
In this paper, we address a scheduling problem for minimizing total weighted tardiness. The background for the paper is derived from the automobile gear manufacturing process. We consider the bottleneck operation of heat treatment stage of gear manufacturing. Real-life scenarios like unequal release times, incompatible job families, nonidentical job sizes, heterogeneous batch processors, and allowance for job splitting have been considered. We have developed a mathematical model which takes into account dynamic starting conditions. The problem considered in this study is NP-hard in nature, and hence heuristic algorithms have been proposed to address it. For real-life large-size problems, the performance of the proposed heuristic algorithms is evaluated using the method of estimated optimal solution available in literature. Extensive computational analyses reveal that the proposed heuristic algorithms are capable of consistently obtaining near-optimal statistically estimated solutions in very reasonable computational time.