983 resultados para Integration projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Currently, well-established clinical therapeutic approaches for bone reconstruction are restricted to the transplantation of autografts and allografts, and the implantation of metal devices or ceramic-based implants to assist bone regeneration. Bone grafts possess osteoconductive and osteoinductive properties, however they are limited in access and availability and associated with donor site morbidity, haemorrhage, risk of infection, insufficient transplant integration, graft devitalisation, and subsequent resorption resulting in decreased mechanical stability. As a result, recent research focuses on the development of alternative therapeutic concepts. The field of tissue engineering has emerged as an important approach to bone regeneration. However, bench to bedside translations are still infrequent as the process towards approval by regulatory bodies is protracted and costly, requiring both comprehensive in vitro and in vivo studies. The subsequent gap between research and clinical translation, hence commercialization, is referred to as the ‘Valley of Death’ and describes a large number of projects and/or ventures that are ceased due to a lack of funding during the transition from product/technology development to regulatory approval and subsequently commercialization. One of the greatest difficulties in bridging the Valley of Death is to develop good manufacturing processes (GMP) and scalable designs and to apply these in pre-clinical studies. In this article, we describe part of the rationale and road map of how our multidisciplinary research team has approached the first steps to translate orthopaedic bone engineering from bench to bedside byestablishing a pre-clinical ovine critical-sized tibial segmental bone defect model and discuss our preliminary data relating to this decisive step.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of Information and Communication Technologies (ICT) in education is often a topic of much discussion within all sectors of education with educators and educational researchers continually looking for innovative ways of using these technologies to support and enhance student outcomes in education. Consequently, Malaysia is no exception to this and as the Ministry of Education (MOE), Malaysia strives to meet its government’s Vision 2020, educational reform across all educational sectors has become imperative. ICT will play an integral role in the educational reform process and teacher education programs are no exception to this. ICT and capacity building will play an important role in the re-conceptualisation of teacher education programs. This paper reports on how a collaborative capacity building project between two Malaysian teacher education Institutes and an Australian University has given lecturers and pre-service teachers an opportunity to redefine their use of ICT in their prospective teaching areas of science, mathematics and design and technology. It also highlights the positive capacity building programs that occurred between both Australian university lecturers and Malaysian Institute lecturers and how this contributed to the effective integration and use of ICT.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When complex projects go wrong they can go horribly wrong with severe financial consequences. We are undertaking research to develop leading performance indicators for complex projects, metrics to provide early warning of potential difficulties. The assessment of success of complex projects can be made by a range of stakeholders over different time scales, against different levels of project results: the project’s outputs at the end of the project; the project’s outcomes in the months following project completion; and the project’s impact in the years following completion. We aim to identify leading performance indicators, which may include both success criteria and success factors, and which can be measured by the project team during project delivery to forecast success as assessed by key stakeholders in the days, months and years following the project. The hope is the leading performance indicators will act as alarm bells to show if a project is diverting from plan so early corrective action can be taken. It may be that different combinations of the leading performance indicators will be appropriate depending on the nature of project complexity. In this paper we develop a new model of project success, whereby success is assessed by different stakeholders over different time frames against different levels of project results. We then relate this to measurements that can be taken during project delivery. A methodology is described to evaluate the early parts of this model. Its implications and limitations are described. This paper describes work in progress.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses two different approaches to teaching design and their modes of delivery and reflects upon their successes and failures. Two small groups of third year design students have been given projects focussing on incorporation of daylighting to architectural design in studios having different design themes. In association with the curriculum, the themes were Digital Tools and Sustainability. Although both studios had the topic of daylighting, the aim and methodology used were different. Digital Tool studio’s aim was to teach how to design daylighting by using a digital tool, where as, Sustainability studio aimed at using scale modelling as a tool to learn about daylighting and integrating it into design. Positive results for providing student learning success within the University context were the students’ chance to learn and practice some new skills –using a new tool for designing; integration of the tutors’ extensive research expertise to their teaching practice; and the students’ construction of their own understanding of knowledge in a student-centred educational environment. This environment created a very positive attitude in the form of exchanging ideas and collaboration among the students of Digital Tools students at the discussion forum. Sustainability group students were enthusiastic about designing and testing various proposals. Problems that both studios experienced were mainly related to timing. Synchronizing with other groups of their studios and learning of a new skill on top of an already complicated process of design learning were the setbacks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this chapter we review studies of the engagement of students in design projects that emphasise integration of technology practice and the enabling sciences, which include physics and mathematics. We give special attention to affective and conceptual outcomes from innovative interventions of design projects. This is important work because of growing international concern that demand for professionals with technological expertise is increasing rapidly, while the supply of students willing to undertake the rigors of study in the enabling sciences is proportionally reducing (e.g., Barringtion, 2006; Hannover & Kessels, 2004; Yurtseven, 2002). The net effect is that the shortage in qualified workers is having a detrimental effect upon economic and social potential in Westernised countries (e.g., Department of Education, Science and Training [DEST], 2003; National Numeracy Review Panel and National Numeracy Review Secretarial, 2007; Yurtseven, 2002). Interestingly, this trend is reversed in developing economies including China and India (Anderson & Gilbride, 2003).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Examined the social adaptation of 32 children in grades 3–6 with mild intellectual disability: 13 Ss were partially integrated into regular primary school classes and 19 Ss were full-time in separate classes. Sociometric status was assessed using best friend and play rating measures. Consistent with previous research, children with intellectual disability were less socially accepted than were a matched group of 32 children with no learning disabilities. Children in partially integrated classes received more play nominations than those in separate classes, but had no greater acceptance as a best friend. On teachers' reports, disabled children had higher levels of inappropriate social behaviours, but there was no significant difference in appropriate behaviours. Self-assessments by integrated children were more negative than those by children in separate classes, and their peer-relationship satisfaction was lower. Ratings by disabled children of their satisfaction with peer relationships were associated with ratings of appropriate social skills by themselves and their teachers, and with self-ratings of negative behaviour. The study confirmed that partial integration can have negative consequences for children with an intellectual disability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The role of the evaluation for Official Development Assistance (ODA) enterprises including educational development has become critical after increasing “aid fatigue” experienced by the international community in the 1990s. To date, however, monitoring and evaluating outcomes of the projects has been limited to the project life. Consequently these have been mainly through the international aid agencies. Furthermore, the monitoring and evaluation led by international aid agencies have paid little attention to aspects of the sustainability of technical cooperation in educational development. To sustain the impact of technical cooperation, the reinforcement of evaluation has drawn increasing attention in light of the emerging modalities in international development. Therefore this research was inspired to investigate alternative evaluation frameworks for an educational reform project for teacher quality improvement that may increase possibilities for long term sustainability. Importantly, the new modalities in international development and educational issues provide new options. In addition, the research reviewed theoretical and practical issues surrounding evaluation in general, and highlighted the evaluation of education reform projects. The research reported explored via case studies, the evaluation processes employed by the Egyptian education reform projects implemented by the Japan International Cooperation Agency (JICA) and the United Nations Children’s Fund (UNICEF). The case studies used three data sources (archival and relevant documents, a survey questionnaire and interviews) to illuminate the contextually-embedded evaluation processes. The research found that process evaluation is a potential alternative method since it is likely to be locally institutionalised, which may yield long-term sustainability of the projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public private partnerships (PPP) have been widely used as a method for public infrastructure project delivery not only locally and internationally, however the adoption of PPPs in social infrastructure procurement has still been very limited. The objective of this paper is to investigate the potential of implementation of current PPP framework in social affordable housing projects in South East Queensland. Data were collected from 22 interviewees with rich experiences in the industry. The findings of this study show that affordable housing investment have been considered by the industry practitioners as a risky business in comparison to other private rental housing investment. The main determents of the adoption of PPPs in social infrastructure project are the tenant-related factors, such as the inability of paying rent and the inability of caring the property. The study also suggests the importance of seeking strategic partnership with community-based organisation that has experiences in managing similar tenants’ profiles. Current PPP guideline is also viewed as inappropriate for the affordable housing projects, but the principle of VFM framework and risk allocation in PPPs still be applied to the affordable housing projects. This study helps to understand the viability of PPP in social housing procurement projects, and point out the importance of developing guideline for multi-stakeholder partnership and the expansion of the current VFM and PPPs guidelines.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes algorithms based on Elliptic Cryptography (ECC) for use within the Secure Shell (SSH) transport protocol. In particular, it specifies Elliptic Curve Diffie-Hellman (ECDH) key agreement, Elliptic Curve Menezes-Qu-Vanstone (ECMQV) key agreement, and Elliptic Curve Digital Signature Algorithm (ECDSA) for use in the SSH Transport Layer protocol.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road and highway infrastructure provides the backbone for a nation's economic growth. The versatile dispersion of population in Australia, from sparsely settled communities in remote areas to regenerated inner city suburbs with high density living in metropolitans, calls for continuing development and improvement on roads infrastructure under the current federal government policies and state governments' strategic plans. As road infrastructure projects involve large resources and mechanism, achieving sustainability not only in economic scales but also through environmental and social responsibility becomes a crucial issue. Current efforts are often impeded by different interpretation on sustainability agenda by stakeholders involved in these types of projects. As a result, sustainability deliverables at the project level is not often as transparent and measurable, compared to promises in project briefs and designs. This paper reviews the past studies on sustainable infrastructure construction, focusing on roads and highway projects. Through literature study and consultation with the industry, key sustainability indicators specific to road infrastructure projects have been identified. Based on these findings, this paper introduces an on-going research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, and issues that impact on the gap between sustainability foci and its actual realization at project end level. The exploration helps generate an integrated decision-making model for sustainable road infrastructure projects. The research will promote to the industry more systematic and integrated approaches to decision-making on the implementation of sustainability strategies to achieve deliverable goals throughout the development and delivery process of road infrastructure projects in Australia.