926 resultados para Efficient Market Hypothesis
Resumo:
We apply the efficient unit-roots tests of Elliott, Rothenberg, and Stock (1996), and Elliott (1998) to twenty-one real exchange rates using monthly data of the G-7 countries from the post-Bretton Woods floating exchange rate period. Our results indicate that, for eighteen out of the twenty-one real exchange rates, the null hypothesis of a unit root can be rejected at the 10% significance level or better using the Elliot et al (1996) DF-GLS test. The unit-root null hypothesis is also rejected for one additional real exchange rate when we allow for one endogenously determined break in the time series of the real exchange rate as in Perron (1997). In all, we find favorable evidence to support long-run purchasing power parity in nineteen out of twenty-one real exchange rates. Second, we find no strong evidence to suggest that the use of non-U.S. dollar-based real exchange rates tend to produce more favorable result for long-run PPP than the use of U.S. dollar-based real exchange rates as Lothian (1998) has concluded.
Resumo:
We utilize Thailand's the financial crisis in 1997 as a natural experiment which exogenously shifts labor demand. Convincing evidence from the Thailand Labor Force Survey support the hypothesis that both employment opportunities and wages shrunk for new entrants after the crisis. We find that workers who entered before the crisis experienced job losses and wage losses. But these losses were smaller than those of new entrants after the crisis. We also find that new entrants after the crisis experienced a 10% reduction in the overtime wages compared to new entrants before the crisis.
Resumo:
This paper investigates the impact of land rental market development on the efficiency of labor allocation and land utilization in rural China. To test the hypothesis that the shadow wage of a rent-in household with limited off-farm opportunities will increase with the development of a land rental market for households, a statistical comparison between the shadow wage and the estimated market wage was conducted. The results showed that the shadow wage for both rent-in households and non-rent-in households was significantly lower than the market wage, but that the wage for the rent-in households was statistically higher than that for non-rent-in households in Fenghua and Deqing, the two counties surveyed in this study. In addition, the estimated marginal product of farmland for rent-in households was statistically higher than the actual land rent that those households paid, while a null hypothesis that the actual rental fee accepted by rent-out households is equivalent to the marginal product of farmland for those households was not rejected in Fenghua county where land transactions by mutual agreement were more prevalent. These results indicate that the development of the land rental market facilitates the efficiency of labor allocation and farmland utilization in rural China.
Resumo:
This paper aims to examine the market efficiency of the commodity futures market in India, which has been growing phenomenally for the last few years. We estimate the long-run equilibrium relationship between the multi-commodity futures and spot prices and then test for market efficiency in a weak form sense by applying both the DOLS and the FMOLS methods. The entire sample period is from 2 January 2006 to 31 March 2011. The results indicate that a cointegrating relationship is found between these indices and that the commodity futures market seems to be efficient only during the more recent sub-sample period since July 2009.
Resumo:
The informal economy is a very important sector of the Indian economy. The National Council of Applied Economic Research estimates that the informal sector - "unorganised sector" - generates about 62% of GDP and provides for about 55% of total employment (ILO 2002, p. 14). This paper studies the characteristics of the workers in the informal economy and whether internal migrants treat this sector as a temporary location before moving on to the organised or formal sector to improve their lifetime income and living conditions. We limit our study to the Indian urban (non-agricultural) sector and study the characteristics of the household heads that belong to the informal sector (self-employed and informal wage workers) and the formal sector. We find that household heads that are less educated, come from poorer households, and/or are in lower social groups (castes and religions) are more likely to be in the informal sector. In addition, our results show strong evidence that the longer a rural migrant household head has been working in the urban sector, ceteris paribus, the more likely that individual has moved out of the informal wage sector. These results support the hypothesis that, for internal migrants, the informal wage labour market is a stepping stone to a better and more certain life in the formal sector.
Resumo:
This paper examines if consumers pay a premium for unobservable quality in the absence of quality standards and/or quality grading systems and, if so, how they assess that unobservable quality, using a rice retail market in Madagascar as an example. In Madagascar, the lack of quality standards and/or grading systems for rice makes is considered to be one of the causes of the rice market's spatial disintegration. Thus, quality standards and grading systems will be necessary to increase the market's efficiency. We hypothesize that consumers and retailers use product origin and rice name as observable indictors of unobservable quality and test the hypothesis using hedonic price regressions. We find that the interaction terms of product origin and rice name significantly affect the price after controlling for both observable quality and spatial and temporal price variation, but that the contribution of product origin and rice name to rice price variation is smaller than spatial and temporal factors. We thus conclude that consumers pay a premium for unobservable quality throughout Madagascar. This finding implies that quality standards and/or grading systems will work in the Malagasy market and that improving market infrastructure such as roads and storage will make them even more effective.
Resumo:
Improving energy efficiency is an unarguable emergent issue in developing economies and an energy efficiency standard and labeling program is an ideal mechanism to achieve this target. However, there is concern regarding whether the consumers will choose the highly energy efficient appliances because of its high price in consequence of the high cost. This paper estimates how the consumer responds to introduction of the energy efficiency standard and labeling program in China. To quantify evaluation by consumers, we estimated their consumer surplus and the benefits of products based on the estimated parameters of demand function. We found the following points. First, evaluation of energy efficiency labeling by the consumer is not monotonically correlated with the number of grades. The highest efficiency label (Label 1) is not evaluated to be no less higher than labels 2 and 3, and is sometimes lower than the least energy efficient label (Label UI). This goes against the design of policy intervention. Second, several governmental policies affects in mixed directions: the subsidies for energy saving policies to the highest degree of the labels contribute to expanding consumer welfare as the program was designed. However, the replacement for new appliances policies decreased the welfare.
Resumo:
The author participated in the 6 th EU Framework Project ―Q-pork Chains (FP6-036245-2)‖ from 2007 to 2009. With understanding of work reports from China and other countries, it is found that compared with other countries, China has great problems in pork quality and safety. By comparing the pork chain management between China and Spain, It is found that the difference in governance structure is one of the main differences in pork chain management between Spain and China. In China, spot-market relationship still dominates governance structure of pork chain, especially between the numerous house-hold pig holders and the great number of small slaughters. While in Spain, chain agents commonly apply cooperatives or integrations to cooperate. It also has been proven by recent studies, that in quality management at the chain level that supply chain integration has a direct effect on quality management practices (Han, 2010). Therefore, the author started to investigate the governance structure choices in supply chain management. And it has been set as the first research objective, which is to explain the governance structure choices process and the influencing factors in supply chain management, analyzing the pork chains cases in Spain and in China. During the further investigation, the author noticed the international trade of pork between Spain and China is not smooth since the signature of bi-lateral agreement on pork trade in 2007. Thus, another objective of the research is to find and solve the problems exist in the international pork chain between Spain and China. For the first objective, to explain the governance structure choices in supply chain management, the thesis conducts research in three main sections. 10 First of all, the thesis gives a literature overview in chapter two on Supply Chain Management (SCM), agri-food chain management and pork chain management. It concludes that SCM is a systems approach to view the supply chains as a whole, and to manage the total flow of goods inventory from the supplier to the ultimate customer. It includes the bi-directional flow of products (materials and services) and information, and the associated managerial and operational activities. And it also is a customer focus to create unique and individual source of customer value with an appropriate use of resources, leading to customer satisfaction and building competitive chain advantages. Agri-food chain management and pork chain management are applications of SCM in agri-food sector and pork sector respectively. Then, the research gives a comparative study in chapter three in the pork chain and pork chain management between Spain and China. Many differences are found, while the main difference is governance structure in pork chain management. Furthermore, the author gives an empirical study on governance structure choice in chapter five. It is concluded that governance structure of supply chain consists of a collection of rules/institutions/constraints structuring the transactions between the various stakeholders. Based on the overview on literatures closely related with governance structure, such as transaction cost economics, transaction value analysis and resource-based view theories, seven hypotheses are proposed, which are: Hypothesis 1: Transaction cost has positive relationship with governance structure choice Hypothesis 2: Uncertainty has positive relationship with transaction cost; higher uncertainty exerts high transaction cost Hypothesis 3: The relationship between asset specificity and transaction cost is positive Hypothesis 4: Collaboration advantages and governance structure choice have positive relationship11 Hypothesis 5: Willingness to collaborate has positive relationship with collaboration advantages Hypothesis 6: Capability to collaborate has positive relationship with collaboration advantages Hypothesis 7: Uncertainty has negative effect on collaboration advantages It is noted that as transaction cost value is negative, the transaction cost mentioned in the hypotheses is its absolute value. To test the seven hypotheses, Structural Equation Model (SEM) is applied and data collected from 350 pork slaughtering and processing companies in Jiangsu, Shandong and Henan Provinces in China is used. Based on the empirical SEM model and its results, the seven hypotheses are proved. The author generates several conclusions accordingly. It is found that the governance structure choice of the chain not only depends on transaction cost, it also depends on collaboration advantages. Exchange partners establish more stable and more intense relationship to reduce transaction cost and to maximize collaboration advantages. ―Collaboration advantages‖ in this thesis is defined as the joint value achieved through transaction (mutual activities) of agents in supply chains. This value forms as improvements, mainly in mutual logistics systems, cash response, information exchange, technological improvements and innovative improvements and quality management improvements, etc. Governance structure choice is jointly decided by transaction cost and collaboration advantages. Chain agents take different governance structures to coordinate in order to decrease their transaction cost and to increase their collaboration advantages. In China´s pork chain case, spot market relationship dominates the governance structure among the numerous backyard pig farmer and small family slaughterhouse 12 as they are connected by acquaintance relationship and the transaction cost in turn is low. Their relationship is reliable as they know each other in the neighborhood; as a result, spot market relationship is suitable for their exchange. However, the transaction between large-scale slaughtering and processing industries and small-scale pig producers is becoming difficult. The information hold back behavior and hold-up behavior of small-scale pig producers increase transaction cost between them and large-scale slaughtering and processing industries. Thus, through the more intense and stable relationship between processing industries and pig producers, processing industries reduce the transaction cost and improve the collaboration advantages with their chain partners, in which quality and safety collaboration advantages be increased, meaning that processing industries are able to provide consumers products with better quality and higher safety. It is also drawn that transaction cost is influenced mainly by uncertainty and asset specificity, which is in line with new institutional economics theories developed by Williamson O. E. In China´s pork chain case, behavioral uncertainty is created by the hold-up behaviors of great numbers of small pig producers, while big slaughtering and processing industries having strong asset specificity. On the other hand, ―collaboration advantages‖ is influenced by chain agents´ willingness to collaborate and chain agents´ capabilities to cooperate. With the fast growth of big scale slaughtering and processing industries, they are more willing to know and make effort to cooperate with their chain members, and they are more capable to create joint value together with other chain agents. Therefore, they are now the main chain agents who drive more intense and stable governance structure in China‘s pork chain. For the other objective, to find and solve the problems in the international pork chain between Spain and China, the research gives an analysis in chapter four on the 13 international pork chain. This study gives explanations why the international trade of pork between Spain and China is not sufficient from the chain perspective. It is found that the first obstacle is the high quality and safety requirement set by Chinese government. It makes the Spanish companies difficult to get authorities to export. Other aspects, such as Spanish pork is not competitive in price compared with other countries such as Denmark, United States, Canada, etc., Chinese consumers do not have sufficient information on Spanish pork products, are also important reasons that Spain does not export great quantity of pork products to China. It is concluded that China´s government has too much concern on the quality and safety requirements to Spanish pork products, which makes trade difficult to complete. The two countries need to establish a more stable and intense trade relationship. They also should make the information exchange sufficient and efficient and try to break trade barriers. Spanish companies should consider proper price strategies to win the Chinese pork market
Resumo:
The evolution of the television market is led by 3DTV technology, and this tendency can accelerate during the next years according to expert forecasts. However, 3DTV delivery by broadcast networks is not currently developed enough, and acts as a bottleneck for the complete deployment of the technology. Thus, increasing interest is dedicated to ste-reo 3DTV formats compatible with current HDTV video equipment and infrastructure, as they may greatly encourage 3D acceptance. In this paper, different subsampling schemes for HDTV compatible transmission of both progressive and interlaced stereo 3DTV are studied and compared. The frequency characteristics and preserved frequency content of each scheme are analyzed, and a simple interpolation filter is specially designed. Finally, the advantages and disadvantages of the different schemes and filters are evaluated through quality testing on several progressive and interlaced video sequences.
Resumo:
Carbon management has gradually gained attention within the overall environmental management and corporate social responsibility agendas. The clean development mechanism, from Kyoto Protocol, was envisioned as connecting carbon market and sustainable development objectives in developing countries. Previous research has shown that this potential is rarely being achieved. The paper explores how the incorporation of the human side into carbon management reinforces its contribution to generate human development in local communities and to improve the company's image. A case study of a Brazilian company is presented, with the results of the application of an analytical model that incorporates the human side and human development. The selected project is an "efficient stoves" programme. "Efficient stoves" are recognised in Brazil as social technologies. Results suggest that the fact that social technologies value the human side of the technology plays a key role when it comes to analysing the co-benefits of the project implementation.
Resumo:
A description of the first renewable forward market mechanisms in the Iberian Electricity Market is provided. A contract for difference mechanism is available in Spain since March 2011between the last resort suppliers and the special regime (renewables and cogeneration) settling the price differences between the equilibrium price of the forward regulated auctions for the last resort supply and the spot price of the corresponding delivery period. Regulated auctions of baseload futures of the Portuguese zone in which the Portuguese last resort supplier sells the special regime production exist since December 2011. The experience gained from renewables auctions in Latin America could be used in the Iberian Electricity market, complementing these first market mechanisms. Introduction of renewable auctions at least for the most mature technologies (i.e. wind) in Spain and Portugal providing a fair price for the renewable generation will be of utmost importance in the short term to diminish the tariff deficit caused by the massive deployment of the feed-in-tariff scheme. Liquidity in the forward markets will also increase as a result of the entry of renewable generation companies intending to maximize their profits due to gradual suppression of feed in tariff schemes.
Resumo:
A comprehensive assessment of the liquidity development in the Iberian power futures market managed by OMIP (“Operador do Mercado Ibérico de Energia, Pólo Português”) in its first 4 years of existence is performed. This market started on July 2006. A regression model tracking the evolution of the traded volumes in the continuous market is built as a function of 12 potential liquidity drivers. The only significant drivers are the traded volumes in OMIP compulsory auctions, the traded volumes in the “Over The Counter” (OTC) market, and the OTC cleared volumes in OMIP clearing house (OMIClear). Furthermore, the enrollment of financial members shows strong correlation with the traded volumes in the continuous market. OMIP liquidity is still far from the levels reached by the most mature European markets (Nord Pool and EEX). The market operator and its clearing house could develop efficient marketing actions to attract new entrants active in the spot market (energy intensive industries, suppliers, and small producers) as well as volumes from the opaque OTC market, and to improve the performance of existing illiquid products. An active dialogue with all the stakeholders (market participants, spot market operator, and supervisory authorities) will help to implement such actions.
Resumo:
Short-run forecasting of electricity prices has become necessary for power generation unit schedule, since it is the basis of every profit maximization strategy. In this article a new and very easy method to compute accurate forecasts for electricity prices using mixed models is proposed. The main idea is to develop an efficient tool for one-step-ahead forecasting in the future, combining several prediction methods for which forecasting performance has been checked and compared for a span of several years. Also as a novelty, the 24 hourly time series has been modelled separately, instead of the complete time series of the prices. This allows one to take advantage of the homogeneity of these 24 time series. The purpose of this paper is to select the model that leads to smaller prediction errors and to obtain the appropriate length of time to use for forecasting. These results have been obtained by means of a computational experiment. A mixed model which combines the advantages of the two new models discussed is proposed. Some numerical results for the Spanish market are shown, but this new methodology can be applied to other electricity markets as well
Resumo:
El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.
Resumo:
Current EU Directives force the Member States to assure by 2020 that 70% of the Construction and Demolition (C&D) waste is recovered instead of landfilled. While some countries have largely achieved this target, others still have a long way to go. For better understanding the differences arising from local disparities, six factors related to technical, economic, legislative and environmental aspects have been identified as crucial influences in the market share of C&D waste recycling solutions. These factors are able to identify the causes that limit the recycling rate of a certain region. Moreover, progress towards an efficient waste management can vary through the improvement of a single factor. This study provides the background for further fine-tuning the factors and their combination into a mathematical model for assessing the market share of C&D recycling solutions.