759 resultados para Designers


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The use of precast, prestressed concrete piles in the foundation of bridge piers has long been recognized as a valuable option for bridge owners and designers. However, the use of these precast, prestressed concrete piles in integral abutment bridges has not been widespread because of concerns over pile flexibility and the potential for concrete cracking and deterioration of the prestressing strands due to long-term exposure to moisture. This report presents the details of the first integral abutment bridge in the state of Iowa that utilized precast, prestressed concrete piles in the abutment. The bridge, which was constructed in Tama County in 2000, consists of a 110 ft. long, 30 ft. wide, single-span PC girder superstructure with a left-side-ahead 20º skew angle. The bridge was instrumented with a variety of strain gages, displacement sensors, and thermocouples to monitor and help in the assessment of structural behavior. The results of this monitoring are presented, and recommendations are made for future application of precast, prestressed concrete piles in integral abutment bridges. In addition to the structural monitoring data, this report presents the results of a survey questionnaire that had been mailed to each of the 50 state DOT chief bridge engineers to ascertain their current practices for precast, prestressed concrete piles and especially the application of these piles in integral abutment bridges.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Desde a última década do séc. XX, o turismo em Cabo Verde tem sido um dos sectores que mais cresce, atraindo maior investimento directo estrangeiro. Contudo, este crescimento gerou também maior pressão sobre os recursos existentes, com impactes negativos a vários níveis. Tem-se reflectido e discutido a sustentabilidade do turismo em território nacional, com objectivos claros de valorização do destino turístico cabo-verdiano, através da conservação e melhoria do ambiente natural, social e cultural. A aposta das autoridades cabo-verdianas no incremento do turismo para o séc. XXI levou a eleição do ecoturismo como a actividade de futuro, com o objectivo de melhorar a competitividade da oferta turística, ser uma alternativa no sector. Uma actividade que pode ser implementada em qualquer ilha, desde que bem aproveitada a vasta oferta de produtos existentes, envolva e forme a população da importância da conservação da biodiversidade e contribua para a erradicação da pobreza ao gerar recursos económicos para as comunidades locais. Deste modo, se requer pensar que arquitectura para o planeamento e realização de infra- estruturas físicas para o adequado desenvolvimento do ecoturismo em Cabo Verde. Os actores directos como os arquitectos, engenheiros civis e planeadores têm uma enorme responsabilidade ao desenhar e executar obras para o turismo, sobre tudo em ecossistemas de grande fragilidade como os que caracterizam as áreas naturais. Sendo um assunto relativamente recente no país, ainda não se criaram normas, regras, directivas claras para o desenvolvimento deste tipo de infra-estruturas turísticas. Em muitos casos, são os próprios desenhadores e construtores, bem como aos seus clientes, quando demonstram alguma sensibilidade na conservação e preservação de áreas de significação ecológica, estabelecem os seus próprios critérios de desenho e códigos éticos que garantam o mínimo de impacte ambiental e uma interacção harmoniosa e sustentável entre a obra física e os espaços circundantes. O presente trabalho tem como objectivo discutir e analisar qual a importância do ecoturismo no panorama arquitectónico cabo-verdiano e se este turismo sustentável será apenas uma ideia teórica, um modelo ideal de actividade ou passível de ser aplicável, de se observar na prática.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Reducing a test administration to standardised procedures reflects the test designers' standpoint. However, from the practitioners' standpoint, each client is unique. How do psychologists deal with both standardised test administration and clients' diversity? To answer this question, we interviewed 17 psychologists working in three public services for children and adolescents about their assessment practices. We analysed the numerous "client categorisations" they produced in their accounts. We found that they had shared perceptions about their clients' diversity, and reported various non-standard practices that complemented standardised test administration, but also differed from them or were even forbidden. They seem to experience a dilemma between: (a) prescribed and situated practices; (b) scientific and situated reliability; (c) commutative and distributive justice. For practitioners, dealing with clients' diversity this is a practical problem, halfway between a problem-solving task and a moral dilemma.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Actualment un típic embedded system (ex. telèfon mòbil) requereix alta qualitat per portar a terme tasques com codificar/descodificar a temps real; han de consumir poc energia per funcionar hores o dies utilitzant bateries lleugeres; han de ser el suficientment flexibles per integrar múltiples aplicacions i estàndards en un sol aparell; han de ser dissenyats i verificats en un període de temps curt tot i l’augment de la complexitat. Els dissenyadors lluiten contra aquestes adversitats, que demanen noves innovacions en arquitectures i metodologies de disseny. Coarse-grained reconfigurable architectures (CGRAs) estan emergent com a candidats potencials per superar totes aquestes dificultats. Diferents tipus d’arquitectures han estat presentades en els últims anys. L’alta granularitat redueix molt el retard, l’àrea, el consum i el temps de configuració comparant amb les FPGAs. D’altra banda, en comparació amb els tradicionals processadors coarse-grained programables, els alts recursos computacionals els permet d’assolir un alt nivell de paral•lelisme i eficiència. No obstant, els CGRAs existents no estant sent aplicats principalment per les grans dificultats en la programació per arquitectures complexes. ADRES és una nova CGRA dissenyada per I’Interuniversity Micro-Electronics Center (IMEC). Combina un processador very-long instruction word (VLIW) i un coarse-grained array per tenir dues opcions diferents en un mateix dispositiu físic. Entre els seus avantatges destaquen l’alta qualitat, poca redundància en les comunicacions i la facilitat de programació. Finalment ADRES és un patró enlloc d’una arquitectura concreta. Amb l’ajuda del compilador DRESC (Dynamically Reconfigurable Embedded System Compile), és possible trobar millors arquitectures o arquitectures específiques segons l’aplicació. Aquest treball presenta la implementació d’un codificador MPEG-4 per l’ADRES. Mostra l’evolució del codi per obtenir una bona implementació per una arquitectura donada. També es presenten les característiques principals d’ADRES i el seu compilador (DRESC). Els objectius són de reduir al màxim el nombre de cicles (temps) per implementar el codificador de MPEG-4 i veure les diferents dificultats de treballar en l’entorn ADRES. Els resultats mostren que els cícles es redueixen en un 67% comparant el codi inicial i final en el mode VLIW i un 84% comparant el codi inicial en VLIW i el final en mode CGA.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report presents the results of the largest and most comprehensive study to date on portland cement pervious concrete (PCPC). It is designed to be widely accessible and easily applied by designers, producers, contractors, and owners. The project was designed to begin with pervious concrete best practices and then to address the unanswered questions in a systematic fashion to allow a successful overlay project. Consequently, the first portion of the integrated project involved a combination of fundamental material property investigations, test method development, and addressing constructability issues before actual construction could take place. The second portion of the project involved actual construction and long-term testing before reporting successes, failures, and lessons learned. The results of the studies conducted show that a pervious concrete overlay can be designed, constructed, operated, and maintained. A pervious concrete overlay has several inherent advantages, including reduced splash and spray and reduced hydroplaning potential, as well as being a very quiet pavement. The good performance of this overlay in a particularly harsh freeze-thaw climate, Minnesota, shows pervious concrete is durable and can be successfully used in freeze-thaw climates with truck traffic and heavy snow plowing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In urban communities, there are often limited amounts of right-of-way available for establishing a large setback distance from the curb for fixed objects. Urban communities must constantly weigh the cost of purchasing additional right-of-way for clear zones against the risk of fixed object crashes. From 2004 to 2006, this type of crash on curbed roads represented 15% of all fatal crashes and 3% of all crashes in the state of Iowa. Many states have kept the current minimum AASHTO recommendations as their minimum clear zone standards; however, other states have decided that these recommendations are insufficient and have increased the required minimum clear zone distance to better suit the judgment of local designers. This report presents research on the effects of the clear zone on urban curbed streets. The research was conducted in two phases. The first phase involved a synthesis of practice that included a literature review and a survey of practices in jurisdictions that have developmental and historical patterns similar to those of Iowa. The second phase involved investigating the benefits of a 10 ft clear zone, which included examining urban corridors in Iowa that meet or do not meet the 10 ft clear zone goal. The results of this study indicate that a consistent fixed object offset results in a reduction in the number of fixed object crashes, a 5 ft clear zone is most effective when the goal is to minimize the number of fixed object c ashes, and a 3 ft clear zone is most effective when the goal is to minimize the cost of fixed object crashes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Roadside cross-drainage culverts have been found to impact vehicle accident injury levels. Designers have commonly used three safety treatments to protect errant drivers from culvert accidents. These treatments have included: culvert extension, guardrail installation and grating. In order to define which safety treatment is the most appropriate, benefit-cost analysis has used accident cost reduction to estimate societal gains earned by using any safety treatment. The purpose of this study was to estimate accident costs for a wide range of roadway and roadside characteristics so that designers can calculate benefit/cost ratios for culvert safety treatment options under any particular scenario. This study began with conducting a parametric study in order to find variables which have significant impact on accident cost changes. The study proceeded with highway scenario modeling which included scenarios with different values for combinations of roadway and roadside variables. These variables were chosen based upon findings from the parametric study and their values were assigned based upon highway classification. This study shows that the use of different culvert safety treatments should be flexible to roadway and roadside characteristics. It also shows that culvert extension and grating were the safety treatments found to produce the lowest accident costs for all highway scenarios modeled. Therefore, it is believed that the expanded adoption of culvert extension and culvert grates can improve overall highway safety.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The creation of three-dimensional (3D) drawings for proposed designs for construction, re-construction and rehabilitation activities are becoming increasingly common for highway designers, whether by department of transportation (DOT) employees or consulting engineers. However, technical challenges exist that prevent the use of these 3D drawings/models from being used as the basis of interactive simulation. Use of driving simulation to service the needs of the transportation industry in the US lags behind Europe due to several factors, including lack of technical infrastructure at DOTs, cost of maintaining and supporting simulation infrastructure—traditionally done by simulation domain experts—and cost and effort to translate DOT domain data into the simulation domain.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The creation of three-dimensional (3D) drawings for proposed designs for construction, re-construction and rehabilitation activities are becoming increasingly common for highway designers, whether by department of transportation (DOT) employees or consulting engineers. However, technical challenges exist that prevent the use of these 3D drawings/models from being used as the basis of interactive simulation. Use of driving simulation to service the needs of the transportation industry in the US lags behind Europe due to several factors, including lack of technical infrastructure at DOTs, cost of maintaining and supporting simulation infrastructure—traditionally done by simulation domain experts—and cost and effort to translate DOT domain data into the simulation domain.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construction work zone can be. An integrated approach was taken to research work-zone safety issues and mobility, including input from many personnel, ranging from roadway designers to construction laborers and equipment operators. The research team analyzed crash data from Iowa work-zone incident reports and Occupational Safety and Health Administration data for the industry in conjunction with the results of personal interviews, a targeted work-zone ingress and egress survey, and a work-zone pilot project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the United States many bridge structures have been designed without consideration for their unique construction problems. Many problems could have been avoided if construction knowledge and experience was utilized in the design process. A systematic process is needed to create and capture construction knowledge for use in the design process. This study was conducted to develop a system to capture construction considerations from field people and incorporate it into a knowledge-base for use by the bridge designers. This report presents the results of this study. As a part of this study a microcomputer-based constructability system has been developed. The system is a user-friendly microcomputer database which codifies construction knowledge, provides easy access to specifications, and provides simple design computation checks for the designer. A structure for the final database was developed and used in the prototype system. A process for collecting, developing and maintaining the database is presented and explained. The study involved a constructability survey, interviews with designers and constructors, and visits to construction sites to collect constuctability concepts. The report describes the development of the constructability system and addresses the future needs for the Iowa Department of Transportation to make the system operational. A user's manual for the system is included along with the report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since integral abutment bridges decrease the initial and maintenance costs of bridges, they provide an attractive alternative for bridge designers. The objective of this project is to develop rational and experimentally verified design recommendations for these bridges. Field testing consisted of instrumenting two bridges in Iowa to monitor air and bridge temperatures, bridge displacements, and pile strains. Core samples were also collected to determine coefficients of thermal expansion for the two bridges. Design values for the coefficient of thermal expansion of concrete are recommended, as well as revised temperature ranges for the deck and girders of steel and concrete bridges. A girder extension model is developed to predict the longitudinal bridge displacements caused by changing bridge temperatures. Abutment rotations and passive soil pressures behind the abutment were neglected. The model is subdivided into segments that have uniform temperatures, coefficients of expansion, and moduli of elasticity. Weak axis pile strains were predicted using a fixed-head model. The pile is idealized as an equivalent cantilever with a length determined by the surrounding soil conditions and pile properties. Both the girder extension model and the fixed-head model are conservative for design purposes. A longitudinal frame model is developed to account for abutment rotations. The frame model better predicts both the longitudinal displacement and weak axis pile strains than do the simpler models. A lateral frame model is presented to predict the lateral motion of skewed bridges and the associated strong axis pile strains. Full passive soil pressure is assumed on the abutment face. Two alternatives for the pile design are presented. Alternative One is the more conservative and includes thermally induced stresses. Alternative Two neglects thermally induced stresses but allows for the partial formation of plastic hinges (inelastic redistribution of forces). Ductility criteria are presented for this alternative. Both alternatives are illustrated in a design example.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Minimizing infiltration of water in pavement structures has long been a priority of pavement designers. Incorporation of subsurface edgedrains is frequently an integral part of an pavement drainage system. In order for such a system to be effective however, it must be properly installed and maintained. With advances in video technology, inspection of edgedrain systems can now be conducted quite efficiently. This report documents the results of 287 video inspections of highway edgedrain systems in 29 states. These inspections were conducted to both demonstrate the capabilities of the technology as well as demonstrating some of the common problems associated with the performance of edgedrain systems. Findings indicated not only that the equipment was quite effective in identifying edgedrain performance concerns, but also how widespread the concerns of edgedrain performance are. Almost one third of the systems inspected had nonfunctional outlets, another third were either found to have non-functional mainlines or the mainlines could not be inspected due to physical obstructions. Only one third of the systems inspected were found to be performing as intended. Recommendations are provided for edgedrain design improvements to facilitate performance of the system and their inspections as well as recommendations to improve quality control during construction. Suggestions are also provided for maintenance procedures to address concerns identified in the inspection process. A Draft Guide Specification For Video Edgedrain Inspection and Acceptance is also provided as an Appendix.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Our work is focused on alleviating the workload for designers of adaptive courses on the complexity task of authoring adaptive learning designs adjusted to specific user characteristics and the user context. We propose an adaptation platform that consists in a set of intelligent agents where each agent carries out an independent adaptation task. The agents apply machine learning techniques to support the user modelling for the adaptation process

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In jointed portland cement concrete pavements, dowel bars are typically used to transfer loads between adjacent slabs. A common practice is for designers to place dowel bars at a certain, consistent spacing such that a sufficient number of dowels are available to effectively transfer anticipated loads. In many cases, however, the standards developed today for new highway construction simply do not reflect the design needs of low traffic volume, rural roads. The objective of this research was to evaluate the impact of the number of dowel bars and dowel location on joint performance and ultimately on pavement performance. For this research, test sections were designed, constructed, and tested in actual field service pavement. Test sections were developed to include areas with load transfer assemblies having three and four dowels in the outer wheel path only, areas with no joint reinforcement whatsoever, and full lane dowel basket assemblies as the control. Two adjacent paving projects provided both rural and urban settings and differing base materials. This report documents the approach to implementing the study and provides discussion and suggestions based on the results of the research. The research results indicate that the use of single three or four dowel basket assemblies in the outer wheel path is acceptable for use in low truck volume roads. In the case of roadways with relatively stiff bases such as asphalt treated or stabilized bases, the use of the three dowel bar pattern in the outside wheel path is expected to provide adequate performance over the design life of the pavement. In the case of untreated or granular bases, the results indicate that the use of the three or four dowel bar basket in both wheel paths provides the best long-term solution to load transfer and faulting measurements.