930 resultados para Design management
Resumo:
Intelligent buildings should provide a multi-sensory experience so that visual, aural, tactile, olfactory and gustatory senses are stimulated appropriately. A lack of environmental stimuli produces a boring and unsatisfying environment. It is now known that the environment affects people at deeper levels than, say, health and safety, and consequently it can modify moods and work performance. A holistic approach is proposed which recognizes that the physical environment together with social, organizational and personal factors can enhance the productivity of occupants. This approach provides a footprint for the design of healthier and more sustainable workplaces.
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
The ISO has issued a Draft International Standard on construction procurement and the British Standards Institute is drafting a standard based upon this for use in the UK. Three questions arise from these observations. First, what kind of consultation processes would be adequate to ensure that such a standard meets the requirements of an industry as diverse as construction? Second, why would an international standard be inappropriate for use in a country like UK? Third, what sort of issues should such a standard seek to cover? There are strong precedents for process standards, such as quality assurance, design management and workmanship on building sites. So the idea of a standard on procurement is not unusual. Moreover, there are many differences in tendering and procurement practice that are wasteful and even collusive or illegal. These issues are explored with a view to offering insights and suggestions for guidance based on the experiences in UK. The research method is first-hand observation of the drafting committee who are dealing with the British Standard. As an example to test and inform the standardization concept, six different standard guidance documents on tendering procedures are compared. This reveals a significant degree of diversity, and based on this, nine stages for implementing a tendering procedure are derived.
Resumo:
The idea of a community of practice (CoP) has been offered as the engine to unlock the potential of organizational resources, mainly knowledge and people, to achieve the strategic goal of sustained competitiveness. The relevance and application of CoPs in large UK contracting companies was investigated using two case studies. Contrasting variations in the understanding of the concept between the two contracting companies were observed. While a CoP was applied in one company with strategic intent, the concept was not fully understood in the other. In one company, only a third of CoP members surveyed agreed that CoPs were a vehicle for driving best practice and innovation throughout the business; this compared with more than 60% in agreement in the other contracting firm. The higher agreement and satisfaction of CoP members in the latter case study was the result of the management's understanding and commitment. CoPs require time and organizational support to mature. The strategic inception and management support of CoP application is vital for their maturation and progress. Although the construction industry change discourses portray CoPs as fostering an environment of trust, and hence serving as innovation and competiveness enablers, their potential contribution to contracting firms does not provide a compelling case and hence merits further research studies.
Resumo:
This thesis is about new digital moving image recording technologies and how they augment the distribution of creativity and the flexibility in moving image production systems, but also impose constraints on how images flow through the production system. The central concept developed in this thesis is ‘creative space’ which links quality and efficiency in moving image production to time for creative work, capacity of digital tools, user skills and the constitution of digital moving image material. The empirical evidence of this thesis is primarily based on semi-structured interviews conducted with Swedish film and TV production representatives.This thesis highlights the importance of pre-production technical planning and proposes a design management support tool (MI-FLOW) as a way to leverage functional workflows that is a prerequisite for efficient and cost effective moving image production.
Resumo:
O artigo apresenta uma reflexão sobre a gestão do processo de projeto paramétrico, com superfícies complexas, baseado em duas experiências realizadas no Instituto de Arquitetura e Urbanismo, da USP de São Carlos, pelo grupo de pesquisa Nomads.usp. SLICE é o resultado parcial de um pavilhão temporário, com superfícies complexas, desenvolvido por meio de projeto paramétrico e técnicas de fabricação digital. Utilizou-se o procedimento de uma pesquisa-ação2 com alunos de graduação e recém-formados em arquitetura, arquitetos do Nomads.usp e a indústria. Os experimentos apontaram para reflexões sobre algumas mudanças na gestão destes processos, para facilitar a viabilidade técnico-construtiva e gerar conhecimento nas áreas de projeto paramétrico, fabricação digital e gestão. O artigo tem caráter exploratório e o desafio é entender e avaliar a gestão do projeto paramétrico em relação a restrição de material, custo de execução e tempo de produção.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
El presente trabajo recoge los resultados de una investigación sobre la «vivienda productiva», es decir, de la casa como lugar de trabajo. Dicha investigación se ha ocupado de explorar cómo influyen las cotidianeidades doméstico-laborales actuales —junto con sus arquitecturas y los urbanismos que estas generan— en la sociedad, en especial en temas sociales centrales como la construcción de las subjetividades, y de una vida en comunidad. Asimismo, explora cómo podrían influir en un futuro. La hipótesis sobre la que se trabaja, y que finalmente se intenta demostrar, consiste en que, en la territorialidad múltiple de lo laboral, la vivienda, como plataforma doméstica multiusos, productiva y reproductiva de la que muchas personas disponen, desempeña un papel nodal, y es posible que en el futuro su papel sea aún más importante y más visible. La vivienda productiva funciona como una infraestructura urbana desde la cual se construyen diferentes tipos de bienes materiales e inmateriales, pero sobre todo formas de relación, sociales y productivas con otros, además de imaginarios y afectos. La vivienda como infraestructura productiva y reproductiva es tanto «fábrica fundamental de lo social», como nos enseña Silvia Federici, como «fábrica de lo urbano». El trabajo en casa, como parte de diferentes dinámicas «dispersas» del trabajo que se dan en la actualidad, presenta tanto problemáticas y desafíos importantes, como capitales y posibilidades sociales. Por un lado, puede facilitar una absorción de tipo «24/7» vinculada a las lógicas de producción dispersa y consumo dominantes además de la que se da por las dinámicas patriarcales tradicionales, y en múltiples casos situaciones de evidente asimetría y de explotación laboral. También puede propiciar situaciones socialmente extendidas o impuestas de soledad y aislamiento. Sin embargo, está asimismo vinculado al surgimiento de espacios de experimentación tanto en soledad como en compañía, de cooperación y de intercambio, además de a la evidente posibilidad de construir rutinas propias y, por tanto, una subjetividad laboral propia. Por otro lado, frente a la idea general y homogénea del trabajador casero como un sujeto mayoritariamente aislado de su entorno, las jornadas de trabajo de los trabajadores caseros estudiados presentan una gran diversidad. Estas pueden conllevar aislamiento y exclusión, así como acompañar diferentes formas de construcción de una ciudadanía activa, tanto en solitario, como mediante formas de participación activa en la construcción de una vida en comunidad. En esta investigación se analizan, pues, desafíos y oportunidades de estas espacialidades del trabajo y, a través de este análisis, se indaga en el papel de los marcos físicos, organizativos y simbólicos actuales para la vivienda y para la ciudad pensada desde los trabajadores caseros. Al mismo tiempo se exploran nuevos tipos de vivienda y urbanismos que puedan quizás acompañar procesos sociales de inclusión, así como de emancipación, cooperación e intercambio y, en general, nuevas formas de vecindad y bienestar compartido en los ámbitos doméstico-productivos. Metodológicamente, las singularidades presentes en las realidades estudiadas invitan además a explorar protocolos de análisis, métodos de diseño, de gestión y gobierno que, desde lo micro, puedan dialogar con lo cotidiano y sus singularidades. Diego Barajas, autor de la tesis, es arquitecto dedicado a la práctica, a la investigación y la docencia. Su trabajo se focaliza en explorar el carácter mediador de la arquitectura frente a lo cotidiano y sus microrrealidades. Es profesor de proyectos de urbanismo en la IE School of Architecture y es miembro de Husos, una plataforma de investigación y diseño orientada a la innovación en arquitectura y urbanismo, con sede en Madrid. Es el autor del libro Dispersion, A Study of Global Mobility and the Dynamics of a Fictional Urbanism (Episode Publishers, Róterdam, 2003). Sus trabajos teóricos y de investigación han aparecido en libros y revistas internacionales tales como The Domestic and The Foreign in Architecture (010 Publishers, 2008), Public Spheres, a Europan Discussion (Europan9, 2007), Photoespaña 05 (La Fábrica, Madrid, 2005), Domus, Volume, Abitare, Architese, Plot, y Summa+. Su trabajo se ha expuesto en la Bienal de Venecia (selección principal), la Bienal de Róterdam, la Fundación Tapies, Photoespaña, entre otros y es parte de la colección permanente del FRAC Centre en Orleans y del Historisch Museum de Róterdam entre otros. Antes de estudiar en Róterdam, se gradúa con Honores en la Universidad de los Andes en 1999 y su tesis de grado de arquitectura recibe la máxima distinción como proyecto de Grado Meritorio. ABSTRACT The present study records an investigation into the «productive house», or the home as a workplace. This investigation looks at how working from home, its architectures, and the urban dynamics generated around it influence daily life and the construction of society. It also explores what influences home-based work might have in the future, particularly in central themes such as the biopolitical construction of subjectivities and community life. The central hypothesis revolves around the idea that the home, as a multi-use infrastructure that most of us have access to, plays a fundamental role in the contemporary work sphere, due to —or even in spite of— the omnipresence of work in practically every moment and area of our daily lives, and might play a main role in the future. The home functions as a kind of hub from which we create different kinds of material and immaterial goods, but above all relationships with others, both social and productive, as well as imaginaries and affections. The home, as a machine for production and reproduction, is as much a main «factory of the social» as Silvia Federici describes it, as a «factory of the urban». Working from home, as one of several «dispersed» work dynamics that are part of the contemporary world of work, presents as many important problematics and challenges as it does possibilities and social capital. On the one hand, it can contribute to kind of «24/7» absorption linked both to the logistics of the current dispersed production and consumption, and to that of traditional patriarchal dynamics, and in some cases even clearly asymmetrical situations that exploit the workforce. It can also lead to the socially widespread phenomena of isolation and loneliness, at times imposed upon home-based workers. However, by the same token, it is also linked to the growth of experimental spaces of cooperation and exchange, both solitary and in company, as well as the clear possibility of constructing individualised routines and, therefore, a personal laboural subjectivity. On the other hand, contrary to the generalised, homogenous idea of a home-based worker who is mostly isolated from his or her environment, the working days of those we studied went hand in hand with different ways of building subjectivities. This could be as much in exclusion and isolation as through building an active citizenship, at times in solitary and at times actively participating in the construction of communal life. In this investigation, therefore, the challenges and opportunities of the home as workplace have been analysed, and through this analysis we have inquired into the role of current physical, organisational and symbolic frameworks for the home and for the city from the perspective of home workers. At the same time we have explored new types of homes and of town planning that could perhaps accompany social processes of diversity and inclusion as well as emancipation, cooperation and exchange and, in general, new forms of shared welfare in productive domestic environments. Methodologically, the singularities present in the cases studied also invite us to explore protocols of analysis, methods of design, management and government that, from the micro level, could dialogue with the peculiarities of day-to-day life. The author of this thesis, Diego Barajas, is an architect dedicated to practice, investigation and teaching. His work is focussed on exploring the mediating nature of architecture and the built environment in terms of daily life and its microrealities. He is professor of urban projects at the IE School of Architecture and member of Husos, a platform for investigation and town planning based in Madrid. He is the author of the book Dispersion, A Study of Global Mobility and the Dynamics of a Fictional Urbanism (Episode Publishers, Rotterdam, 2003) and his theoretical works and investigations have appeared in books such as The Domestic and The Foreign in Architecture (010 Publishers, 2008), Public Spheres, a Europan Discussion (Europan9, 2007), Photoespaña 05 (La Fábrica, Madrid, 2005), and in international magazines such as Domus, Volume, Abitare, Architese, Plot and Summa+. His work has been exhibited in places such as the Venice Biennial (main selection), the Rotterdam Biennial, the Tapies Foundation and Photoespaña, among others, and forms part of the permanent collection of the FRAC Centre in Orleans and the Historisch Museum of Rotterdam. Before studying in Rotterdam, he graduated with Honours from the University of the Andes in 1999, and his architecture degree thesis received the maximum distinction of Meritorious Graduation Project.
Resumo:
Nos últimos anos, a discussão sobre a implementação do conceito de modelagem da informação da construção tem permanecido nas pautas das empresas do setor da construção civil em todo o mundo; no entanto, no cenário brasileiro, o descompasso entre a estratégia setorial e as iniciativas individuais de algumas empresas tem chamado a atenção. Partindo do princípio de que o conceito de modelagem da informação da construção, em função do seu caráter de inovação tecnológica, carrega consigo a necessidade de mudanças, a reflexão e adaptações sobre os diversos processos que permeiam a produção dos empreendimentos de construção torna-se fundamental. Nesse contexto, o objetivo desta tese é propor um conjunto de Diretrizes para Gestão do Processo de Projeto em Empresas Incorporadoras e Construtoras. As Diretrizes estão pautadas na necessidade de definir o projeto como um processo estratégico, inserindo a sua gestão como elemento fundamental para a facilitação e integração do fluxo de informações no âmbito do empreendimento. Para a concretização do objetivo da tese, realizaram-se Estudos de Caso em empresas Incorporadoras e Construtoras brasileiras com o objetivo de diagnosticar as práticas vigentes de gestão do processo de projeto. Em paralelo, conduziu-se a reflexão sobre as responsabilidades do gestor do processo de projeto no âmbito da modelagem por meio de Grupos de Foco envolvendo gestores do processo de projeto e especialistas em tecnologia da informação aplicada à construção. Além disso, a metodologia de pesquisa contempla um Estudo de Caso com foco para a implementação do Conceito de Modelagem da Informação no contexto setorial do Reino Unido. Como resultado das Diretrizes, apresenta-se o Modelo para Gestão do Processo de Projeto no Contexto da Modelagem, seguido pelo Plano de Reestruração para o Departamento de Projetos, o qual visa à proposição de um modelo estruturado para condução das mudanças necessárias nas áreas responsáveis pelo processo de projeto das empresas Incorporadoras e Construtoras.
Resumo:
Abstract Resistance in insect pests against the endotoxin of Bacillus thuringiensis (Berliner) (Bt) is a major threat to the usefulness of this biopesticide, both used as traditional formulations and in transgenic crops. A crucial requirement for the development of successful resistance management strategies is a molecular understanding of the nature and inheritance of resistance mechanisms. This information can be used to design management strategies that will delay or counteract Bt resistance. The best known Bt resistance mechanism is inactivation of brush border membrane receptors. This type of resistance has a largely recessive mode of inheritance, which has enabled the design of resistance management approaches involving high dose and refuge strategies. Recent observations suggest that other resistance mechanisms are possible, including a mechanism that sequesters the toxin in the gut lumen through inducible immune reactions. The elevated immune status associated with tolerance to the toxin can be transmitted to subsequent generations by a maternal effect, which has implications for resistance management in the field. The high dose/refuge strategy may not be appropriate for the management of these alternative resistance mechanisms and other strategies have to be developed if inducible dominant resistance or tolerance mechanisms occur frequently in the field.
Resumo:
The International Long-Term Ecological Research (ILTER) network comprises > 600 scientific groups conducting site-based research within 40 countries. Its mission includes improving the understanding of global ecosystems and informs solutions to current and future environmental problems at the global scales. The ILTER network covers a wide range of social-ecological conditions and is aligned with the Programme on Ecosystem Change and Society (PECS) goals and approach. Our aim is to examine and develop the conceptual basis for proposed collaboration between ILTER and PECS. We describe how a coordinated effort of several contrasting LTER site-based research groups contributes to the understanding of how policies and technologies drive either toward or away from the sustainable delivery of ecosystem services. This effort is based on three tenets: transdisciplinary research; cross-scale interactions and subsequent dynamics; and an ecological stewardship orientation. The overarching goal is to design management practices taking into account trade-offs between using and conserving ecosystems toward more sustainable solutions. To that end, we propose a conceptual approach linking ecosystem integrity, ecosystem services, and stakeholder well-being, and as a way to analyze trade-offs among ecosystem services inherent in diverse management options. We also outline our methodological approach that includes: (i) monitoring and synthesis activities following spatial and temporal trends and changes on each site and by documenting cross-scale interactions; (ii) developing analytical tools for integration; (iii) promoting trans-site comparison; and (iv) developing conceptual tools to design adequate policies and management interventions to deal with trade-offs. Finally, we highlight the heterogeneity in the social-ecological setting encountered in a subset of 15 ILTER sites. These study cases are diverse enough to provide a broad cross-section of contrasting ecosystems with different policy and management drivers of ecosystem conversion; distinct trends of biodiversity change; different stakeholders’ preferences for ecosystem services; and diverse components of well-being issues.
Resumo:
Marine ecosystems are facing a diverse range of threats, including climate change, prompting international efforts to safeguard marine biodiversity through the use of spatial management measures. Marine Protected Areas (MPAs) have been implemented as a conservation tool throughout the world, but their usefulness and effectiveness is strongly related to climate change. However, few MPA programmes have directly considered climate change in the design, management or monitoring of an MPA network. Under international obligations, EU, UK and national targets, Scotland has developed an MPA network that aims to protect marine biodiversity and contribute to the vision of a clean, healthy and productive marine environment. This is the first study to critically analyse the Scottish MPA process and highlight areas which may be improved upon in further iterations of the network in the context of climate change. Initially, a critical review of the Scottish MPA process considered how ecological principles for MPA network design were incorporated into the process, how stakeholder perceptions were considered and crucially what consideration was given to the influence of climate change on the eventual effectiveness of the network. The results indicated that to make a meaningful contribution to marine biodiversity protection for Europe the Scottish MPA network should: i) fully adopt best practice ecological principles ii) ensure effective protection and iii) explicitly consider climate change in the management, monitoring and future iterations of the network. However, this review also highlighted the difficulties of incorporating considerations of climate change into an already complex process. A series of international case studies from British Columbia, Canada; central California, USA; the Great Barrier Reef, Australia and the Hauraki Gulf, New Zealand, were then conducted to investigate perceptions of how climate change has been considered in the design, implementation, management and monitoring of MPAs. The key lessons from this study included: i) strictly protected marine reserves are considered essential for climate change resilience and will be necessary as scientific reference sites to understand climate change effects ii) adaptive management of MPA networks is important but hard to implement iii) strictly protected reserves managed as ecosystems are the best option for an uncertain future. This work provides new insights into the policy and practical challenges MPA managers face under climate change scenarios. Based on the Scottish and international studies, the need to facilitate clear communication between academics, policy makers and stakeholders was recognised in order to progress MPA policy delivery and to ensure decisions were jointly formed and acceptable. A Delphi technique was used to develop a series of recommendations for considering climate change in Scotland’s MPA process. The Delphi participant panel was selected for their knowledge of the Scottish MPA process and included stakeholders, policy makers and academics with expertise in MPA research. The results from the first round of the Delphi technique suggested that differing views of success would likely influence opinions regarding required management of MPAs, and in turn, the data requirements to support management action decisions. The second round of the Delphi technique explored this further and indicated that there was a fundamental dichotomy in panellists’ views of a successful MPA network depending upon whether they believed the MPAs should be strictly protected or allow for sustainable use. A third, focus group round of the Delphi Technique developed a feature-based management scenario matrix to aid in deciding upon management actions in light of changes occurring in the MPA network. This thesis highlights that if the Scottish MPA network is to fulfil objectives of conservation and restoration, the implications of climate change for the design, management and monitoring of the network must be considered. In particular, there needs to be a greater focus on: i) incorporating ecological principles that directly address climate change ii) effective protection that builds resilience of the marine and linked social environment iii) developing a focused, strong and adaptable monitoring framework iv) ensuring mechanisms for adaptive management.