933 resultados para Construction work


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption barriers peculiar to the nature of construction. This paper examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of barriers (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this paper. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major barriers were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 barriers were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that barriers to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction organisations comprise geographically dispersed virtually-linked suborganisations that work together to realise projects. They increasingly do so using information and communication technology (ICT) to communicate, coordinate their activities and to solve complex problems. One salient problem they face is how to effectively use requisite ICT tools. One important tool at their disposal is the self-help group, a body of people that organically spring up to solve shared problems. The more recognised term for this organisational form is a community of practice (COP). COPs generate knowledge networks that enhance and sustain competitive advantage and they are also used to help COP members actually use ICT tools. Etienne Wenger defines communities of practice as “groups of people informally bound together by shared expertise and passion for a joint enterprise” (Wenger and Snyder 2000, p139). This ‘chicken-or-egg’ issue about needing a COP to use the tools that are needed to effective broaden COPs (beyond co-located these groups) led us to explore how best to improve the process of ICT diffusion through construction organisations— primarily using people supported by technology that improves knowledge sharing. We present insights gained from recent PhD research results in this area. A semistructured interview approach was used to collect data from ICT strategists and users in the three large Australian construction organisations that are among the 10 or so first tier companies by annual dollar turnover in Australia. The interviewees were categorised into five organisational levels: IT strategist, implementer, project or engineering manager, site engineer and foreman. The focus of the study was on the organisation and the way that it implements ICT diffusion of a groupware ICT diffusion initiative. Several types of COP networks from the three Australian cases are identified: withinorganisation COP; institutional, implementer or technical support; project manager/engineer focussed; and collegial support. Also, there are cross-organisational COPs that organically emerge as a result of people sharing an interest or experience in something significant. Firstly, an institutional network is defined as a strategic group, interested in development of technology innovation within an organisation. This COP principally links business process domain experts with an ICT strategist.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Our survey findings confirm that 11 factors influence information and communication technology (ICT) diffusion for experienced ICT users. We offer a model that consists of 4 groups of categories: management (M); individual (I); technology (T); and environment (E). Our conclusions reinforce the importance of a coherent ICT diffusion strategy and supportive environment. This requires substantial investment in training and collegial learning support mechanisms. This paper provides an overview of the work undertaken and an analysis of its implications for the construction industry and we provide useful insights that a wide range of construction industry professionals and contractors may find useful.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The impact of relations between an organization and its workers and the relations among workers on individual knowledge generation and sharing practices has not, to date, been addressed in an integrated way. This paper discusses the findings of a study analyzing issues at macro, locally-constructed and micro levels in a public sector organization, to identify and integrate the complex sets of mediators. Key factors were found to include (a) the contested nature of the process of knowledge construction, (b) the worker’s experience of the organization’s internal environment, (c) how the organization is understood to value knowledge sharing, (d) relations with colleagues, and (e) the perceived outcomes of knowledge sharing behaviors. Implications for practice are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since the early 1980s, researchers and practitioners in the organisational and management fields have presumed a link between organisational, or corporate, culture and organisational performance. Whilst many believe this exists, other authors have been critical of the validity of such studies. Part of this doubt stems from a reliance on measures of organisational performance that are based purely on financial measures of business growth. Using the construction industry as the subject of his research, Vaughan Coffey traces the development of the literature on organisational culture and business effectiveness and investigates the culture–performance link using a new and highly objective measure of company performance and an evaluation of organisational culture, which is largely behaviourally-based. Providing a theoretical contribution to the field, this work shows that various cultural traits appear to be closely linked to objectively measured organisational effectiveness. This book will be valuable to professionals and researchers in the fields of management and public policy. It indicates directions for construction companies to develop and change, and in doing so strengthen their chances of remaining strong when opportunities for work might deplete and only the most successful companies will be able to survive.---- Selected Contents: 1. An Introduction to Organizations, Culture, Performance and Construction 2. Organizations, Culture and Climate 3. Organizational Culture Studies 4. Measuring Organizational Performance and Effectiveness 5. Organizational Culture and Effectiveness – The Link Between Them 6. Research on the Relationship between Organizational Culture and Performance in Hong Kong Construction Companies 7. The Hong Kong Experiment – Presentation of Demographic Data, Overall Results and some Descriptive and Qualitative Analysis 8. Detailed Statistical Analysis of the Docs and Pass Data in Relation to the Major Research Questions 9. Four Hong Kong Construction Mini-Case Studies 10. Conclusions and Future Research Directions

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The tourism, construction, and education plans and skills strategies (embedded in project reports) were developed as part of a nation-wide comprehensive research project covering current, emerging and future skills deficiencies and requirements in Bahrain’s labour market. The research covered the majority of economic sectors and activities in the Kingdom and will serve as a basis for formulating industry and occupational outlooks as well as career guidance and awareness activities by academic and training institutions across Bahrain. It will provides foundation work for industry skills councils in order to conduct and achieve a uniform system of occupational standards across industries, occupations and job levels.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this paper is to summarize the outcomes of a detailed research study carried out as part of the fulfilment of a doctoral programme which examined the relationships between, and impacts of organisational culture on construction performance within a Hong Kong context. The research used a mixed methodology approach consisting of an organisational culture survey using an adapted validated and reliable measurement instrument (the Denison Organisational Culture Survey), mini-case studies in four Hong Kong construction companies and correlated the derived culture scores against performance scores measured by the Hong Kong Housing Department Performance Assessment Scoring System (PASS). The significance of the research was to advance knowledge of the importance of organisational culture strength as a performance driver in the construction industry and the further proof of the culture performance links using a set of measures of the latter which were not financially-based. The findings of the research make a contribution to theory by further validating the work by Denison (1990) and others, not only in that a successful link between organisational culture and performance was demonstrated, but it also identifies particular cultural factors in organisations that appear to be significantly responsible for achieving successful outcomes and reveals opportunities for further research into the organisational culture of construction companies Keywords: organisational culture, construction performance, business success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Anecdotal evidence from the infrastructure and building sectors highlights issues of drugs and alcohol and its association with safety risk on construction sites. Operating machinery and mobile equipment, proximity to live traffic together with congested sites, electrical equipment and operating at heights conspire to accentuate the potential adverse impact of drugs and alcohol in the workplace. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgement from drugs and alcohol. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients; unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. This study has four key objectives. Firstly, using the standard World Health Organisation AUDIT, a national qualitative and quantitative assessment of the use of drugs and alcohol will be carried out. This will build upon similar studies carried out in the Australian energy and mining sectors. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Thirdly, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. Finally, an implementation plan will be developed from data gathered from both managers and construction employees. Such an approach stands to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This paper will provide an overview of the background and significance of the study as well as outlining the proposed methodology that will be used to evaluate the safety impacts of alcohol and other drugs in the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research investigated students' construction of knowledge about the topics of magnetism and electricity emergent from a visit to an interactive science centre and subsequent classroom-based activities linked to the science centre exhibits. The significance of this study is that it analyses critically an aspect of school visits to informal learning centres that has been neglected by researchers in the past, namely the influence of post-visit activities in the classroom on subsequent learning and knowledge construction. Employing an interpretive methodology, the study focused on three areas of endeavour. Firstly, the establishment of a set of principles for the development of post-visit activities, from a constructivist framework, to facilitate students' learning of science. Secondly, to describe and interpret students' scientific understandings : prior t o a visit t o a science museum; following a visit t o a science museum; and following post-visit activities that were related to their museum experiences. Finally, to describe and interpret the ways in which students constructed their understandings: prior to a visit to a science museum; following a visit to a science museum; and following post-visit activities directly related to their museum experiences. The study was designed and implemented in three stages: 1) identification and establishment of the principles for design and evaluation of post-visit activities; 2) a pilot study of specific post-visit activities and data gathering strategies related to student construction of knowledge; and 3) interpretation of students' construction of knowledge from a visit to a science museum and subsequent completion of post-visit activities, which constituted the main study. Twelve students were selected from a year 7 class to participate in the study. This study provides evidence that the series of post-visit activities, related to the museum experiences, resulted in students constructing and reconstructing their personal knowledge of science concepts and principles represented in the science museum exhibits, sometimes towards the accepted scientific understanding and sometimes in different and surprising ways. Findings demonstrate the interrelationships between learning that occurs at school, at home and in informal learning settings. The study also underscores for teachers and staff of science museums and similar centres the importance of planning pre- and post-visit activities, not only to support the development of scientific conceptions, but also to detect and respond to alternative conceptions that may be produced or strengthened during a visit to an informal learning centre. Consistent with contemporary views of constructivism, the study strongly supports the views that : 1) knowledge is uniquely structured by the individual; 2) the processes of knowledge construction are gradual, incremental, and assimilative in nature; 3) changes in conceptual understanding are can be interpreted in the light of prior knowledge and understanding; and 4) knowledge and understanding develop idiosyncratically, progressing and sometimes appearing to regress when compared with contemporary science. This study has implications for teachers, students, museum educators, and the science education community given the lack of research into the processes of knowledge construction in informal contexts and the roles that post-visit activities play in the overall process of learning.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Estimated 640,700 persons suffered a work-related injury or illness in 2009-2010 and 444 lost their lives as a result in 2008-2009, in Australia Very little is known about what proportion of accidents are directly attributable to the effects of AOD Anecdotal evidence highlights issues of AOD and its association with safety risk on construction sites

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.