995 resultados para Carrier type
Resumo:
Studies have examined the associations between cancers and circulating 25-hydroxyvitamin D [25(OH)D], but little is known about the impact of different laboratory practices on 25(OH)D concentrations. We examined the potential impact of delayed blood centrifuging, choice of collection tube, and type of assay on 25(OH)D concentrations. Blood samples from 20 healthy volunteers underwent alternative laboratory procedures: four centrifuging times (2, 24, 72, and 96 h after blood draw); three types of collection tubes (red top serum tube, two different plasma anticoagulant tubes containing heparin or EDTA); and two types of assays (DiaSorin radioimmunoassay [RIA] and chemiluminescence immunoassay [CLIA/LIAISON®]). Log-transformed 25(OH)D concentrations were analyzed using the generalized estimating equations (GEE) linear regression models. We found no difference in 25(OH)D concentrations by centrifuging times or type of assay. There was some indication of a difference in 25(OH)D concentrations by tube type in CLIA/LIAISON®-assayed samples, with concentrations in heparinized plasma (geometric mean, 16.1 ng ml−1) higher than those in serum (geometric mean, 15.3 ng ml−1) (p = 0.01), but the difference was significant only after substantial centrifuging delays (96 h). Our study suggests no necessity for requiring immediate processing of blood samples after collection or for the choice of a tube type or assay.
Resumo:
Purpose: To investigate whether wearing different presbyopic vision corrections alters the pattern of eye and head movements when viewing dynamic driving-related traffic scenes. Methods: Participants included 20 presbyopes (mean age: 56±5.7 years) who had no experience of wearing presbyopic vision corrections (i.e. all were single vision wearers). Eye and head movements were recorded while wearing five different vision corrections: single vision lenses (SV), progressive addition spectacle lenses (PALs), bifocal spectacle lenses (BIF), monovision (MV) and multifocal contact lenses (MTF CL) in random order. Videotape recordings of traffic scenes of suburban roads and expressways (with edited targets) were presented as dynamic driving-related stimuli and digital numeric display panels included as near visual stimuli (simulating speedometer and radio). Eye and head movements were recorded using the faceLAB™ system and the accuracy of target identification was also recorded. Results: The magnitude of eye movements while viewing the driving-related traffic scenes was greater when wearing BIF and PALs than MV and MTF CL (p≤0.013). The magnitude of head movements was greater when wearing SV, BIF and PALs than MV and MTF CL (p<0.0001) and the number of saccades was significantly higher for BIF and PALs than MV (p≤0.043). Target recognition accuracy was poorer for all vision corrections when the near stimulus was located at eccentricities inferiorly and to the left, rather than directly below the primary position of gaze (p=0.008), and PALs gave better performance than MTF CL (p=0.043). Conclusions: Different presbyopic vision corrections alter eye and head movement patterns. In particular, the larger magnitude of eye and head movements and greater number of saccades associated with the spectacle presbyopic corrections, may impact on driving performance.
Resumo:
In this paper, the problems of three carrier phase ambiguity resolution (TCAR) and position estimation (PE) are generalized as real time GNSS data processing problems for a continuously observing network on large scale. In order to describe these problems, a general linear equation system is presented to uniform various geometry-free, geometry-based and geometry-constrained TCAR models, along with state transition questions between observation times. With this general formulation, generalized TCAR solutions are given to cover different real time GNSS data processing scenarios, and various simplified integer solutions, such as geometry-free rounding and geometry-based LAMBDA solutions with single and multiple-epoch measurements. In fact, various ambiguity resolution (AR) solutions differ in the floating ambiguity estimation and integer ambiguity search processes, but their theoretical equivalence remains under the same observational systems models and statistical assumptions. TCAR performance benefits as outlined from the data analyses in some recent literatures are reviewed, showing profound implications for the future GNSS development from both technology and application perspectives.
Resumo:
Research examining post-trauma pathology indicates negative outcomes can differ as a function of the type of trauma experienced. Such research has yet to be published when looking at positive post-trauma changes. Ninety-Four survivors of trauma, forming three groups, completed the Posttraumatic Growth Inventory (PTGI) and Impact of Events Scale-Revised (IES-R). Groups comprised survivors of i) sexual abuse ii) motor vehicle accidents iii) bereavement. Results indicted differences in growth between the groups with the bereaved reporting higher levels of growth than other survivors and sexual abuse survivors demonstrated higher levels of PTSD symptoms than the other groups. However, this did not preclude sexual abuse survivors from also reporting moderate levels of growth. Results are discussed with relation to fostering growth through clinical practice.
Resumo:
Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.
Resumo:
The broad objective of the study was to better understand anxiety among adolescents in Kolkata city, India. Specifically, the study compared anxiety across gender, school type, socio-economic background and mothers’ employment status. The study also examined adolescents’ perceptions of quality time with their parents. A group of 460 adolescents (220 boys and 240 girls), aged 13-17 years were recruited to participate in the study via a multi-stage sampling technique. The data were collected using a self-report semi-structured questionnaire and a standardized psychological test, the State-Trait Anxiety Inventory. Results show that anxiety was prevalent in the sample with 20.1% of boys and 17.9% of girls found to be suffering from high anxiety. More boys were anxious than girls (p<0.01). Adolescents from Bengali medium schools were more anxious than adolescents from English medium schools (p<0.01). Adolescents belonging to the middle class (middle socio-economic group) suffered more anxiety than those from both high and low socio-economic groups (p<0.01). Adolescents with working mothers were found to be more anxious (p<0.01). Results also show that a substantial proportion of the adolescents perceived they did not receive quality time from fathers (32.1%) and mothers (21.3%). A large number of them also did not feel comfortable to share their personal issues with their parents (60.0% for fathers and 40.0% for mothers).
Self-efficacy, outcome expectations and self-care behaviour in people with type 2 diabetes in Taiwan
Resumo:
Aims. To explore differences in self-care behaviour according to demographic and illness characteristics; and relationships among self-care behaviour and demographic and illness characteristics, efficacy expectations and outcome expectations of people with type 2 diabetes in Taiwan. Background. Most people with diabetes do not control their disease appropriately in Taiwan. Enhanced self-efficacy towards managing diseases can be an effective way of improving disease control as proposed by the self-efficacy model which provides a useful framework for understanding adherence to self-care behaviours. Design and methods. The sample comprised 145 patients with type 2 diabetes aged 30 years or more from diabetes outpatient clinics in Taipei. Data were collected using a self-administered questionnaire for this study. One-way anova, t-tests, Pearson product moment correlation and hierarchical regression were analysed for the study. Results. Significant differences were found: between self-care behaviour and complications (t = −2·52, p < 0·01) and patient education (t = −1·96, p < 0·05). Self-care behaviour was significantly and positively correlated with duration of diabetes (r = 0·36, p < 0·01), efficacy expectations (r = 0·54, p < 0·01) and outcome expectations (r = 0·44, p < 0·01). A total of 39·1% of variance in self-care behaviour can be explained by duration of diabetes, efficacy expectations and outcome expectations. Conclusions. Findings support the use of the self-efficacy model as a framework for understanding adherence to self-care behaviour. Relevance to clinical practice. Using self-efficacy theory when designing patient education interventions for people with type 2 diabetes will enhance self-management routines and assist in reducing major complications in the future.
Resumo:
This article reports the details of a research on novel design in the field of semitrailer sector and discuss design by hazard prevention techniques. The novel design made addresses occupational health and safety (OHS)concerns of fall from heights. The research includes a detailed survey of national data sources to examine the fatalities caused due to fall from heights in car carriers. The study investigates OHS recommendations in Australia for semitrailer sector. Often injuries are caused due to drivers working above the 1.5 meter height for loading, unloading of the cars, moving the decks up, down, strapping the cars, and slipperly. The new design is developed using latest computer aided design and engineeing (CAD, CAE), product data management (PDM), virtual design process (VDP). The new car carrier design excels in reducing the risks of injuries to drivers and new bench mark for OHS standards. The new design has all the decks operated with hydraulics and uses unique ratchet lock mechanism (fool proof design) and loading happens at a safe working height (below 1.5 meter). All the cars are strapped on the safe working height, and then car desks operated hydraulically to transfer them to the required position. This also includes the car on the prime mover, which shuttles across from one deck to other using hydraulic and rack-pinion mechanisms. The novel design car carrier solves the problem of falls from height: next step would be to transfer this technology across other similar effected sectors.
Resumo:
This paper presents an overview of technical solutions for regional area precise GNSS positioning services such as in Queensland. The research focuses on the technical and business issues that currently constrain GPS-based local area Real Time Kinematic (RTK) precise positioning services so as to operate in future across larger regional areas, and therefore support services in agriculture, mining, utilities, surveying, construction, and others. The paper first outlines an overall technical framework that has been proposed to transition the current RTK services to future larger scale coverage. The framework enables mixed use of different reference GNSS receiver types, dual- or triple-frequency, single or multiple systems, to provide RTK correction services to users equipped with any type of GNSS receivers. Next, data processing algorithms appropriate for triple-frequency GNSS signals are reviewed and some key performance benefits of using triple carrier signals for reliable RTK positioning over long distances are demonstrated. A server-based RTK software platform is being developed to allow for user positioning computations at server nodes instead of on the user's device. An optimal deployment scheme for reference stations across a larger-scale network has been suggested, given restrictions such as inter-station distances, candidates for reference locations, and operational modes. For instance, inter-station distances between triple-frequency receivers can be extended to 150km, which doubles the distance between dual-frequency receivers in the existing RTK network designs.