918 resultados para Border Plan of Prosperity


Relevância:

100.00% 100.00%

Publicador:

Resumo:

To evaluate these factors, the scale of perceived influences on the election of a specialized plan of studies, IPEP, was built and in this study its factorial structure and reliability were evaluated. The instrument was applied to 115 students, chosen by quote sampling. They were students of a subsidized private secondary school from the city of Chillan, Chile. An exploratory factorial analysis identified eight factors in the scale IPEP: Academic projection, Personal development, Maintenance of the social environment, Academic requirements, Satisfaction of others' expectations, Vocational information, Image of the plan and Family pressure. The results present an initial factorial structure, that empirically and theoretically adequate, whose factors were reliable and conceptually useful. These factors distinguish psychogenic and sociogenic aspects of the vocational process, and allow to initiate diagnostic and investigative actions in relation to this early vocational election that is established in secondary schools of the Chilean educational system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To evaluate these factors, the scale of perceived influences on the election of a specialized plan of studies, IPEP, was built and in this study its factorial structure and reliability were evaluated. The instrument was applied to 115 students, chosen by quote sampling. They were students of a subsidized private secondary school from the city of Chillan, Chile. An exploratory factorial analysis identified eight factors in the scale IPEP: Academic projection, Personal development, Maintenance of the social environment, Academic requirements, Satisfaction of others' expectations, Vocational information, Image of the plan and Family pressure. The results present an initial factorial structure, that empirically and theoretically adequate, whose factors were reliable and conceptually useful. These factors distinguish psychogenic and sociogenic aspects of the vocational process, and allow to initiate diagnostic and investigative actions in relation to this early vocational election that is established in secondary schools of the Chilean educational system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estampada en la misma hoja con el grabado de "Vista de Almenara, tomada de Murviedro" y con huella de plancha común (53'5 x 31'5 cm)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estampado en la misma hoja con: "Vista interior de la Lonja de Valencia"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Estampado en la misma hoja con: "Vista de dos Templos antiguos en la plaza del Eco de Sagunto"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Resumen: Descripción: lámina que recoge dos cortes transversales del interior y dos planos generales del teatro de Sagunto

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In response to 9/11, the U.S. launched airstrikes in Afghanistan against al Qaeda to diminish its ability to conduct future attacks. Next, the U.S. turned its attention to Iraq. A series of problems and missteps there subsequently created an opportunity for al Qaeda to evolve, aligning itself with active insurgencies and other terrorist groups around the world. This paper identifies the largely preemptive strategies employed by the U.S. and analyzes how those efforts positively and negatively impacted the War on Terror. While some significant gains were made, the results show that al Qaeda remains a threat to the international community and demands more effective U.S. and international counter-radicalization strategies, including diplomacy and aid, to curb its global appeal.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The floor plan details the proposed interior of the New Meeting House of the First Parish in Cambridge to be built near the College, in the present area of Lehman Hall. This land became Harvard property in 1833. The drawing includes space allotted for the pulpit, pews, and center aisle. The document is fragile.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Original pen and ink drawn plan for Massachusetts Hall drawn circa 1718. Includes floor plan and measurements for second and third floors. Detailed notes describe measurements for each room, entryway, and chimney on verso.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Detailed drawing of stairways to be built in University Hall. Includes dimensions for height, length, and width of stairs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This drawing includes the intricate stonework designed by Charles Bulfinch for University Hall. Each stone is numbered or lettered to indicate the exact stones needed for the project.