992 resultados para Arpini, Adriana
Resumo:
This report summarises the findings of a case study on Queensland’s New Generation Rollingstock (NGR) Project carried out as part of SBEnrc Project 2.34 Driving Whole-of-life Efficiencies through BIM and Procurement. This case study is one of three exemplar projects studied in order to leverage academic research in defining indicators for measuring tangible and intangible benefits of Building Information Modelling (BIM) across a project’s life-cycle in infrastructure and buildings. The NGR is an AUD 4.4 billion project carried out under an Availability Payment Public-Private Partnership (PPP) between the Queensland Government and the Bomabardier-led QTECTIC consortium comprising Bombardier Transportation, John Laing, ITOCHU Corporation and Aberdeen Infrastructure Investments. BIM has been deployed on the project from conceptual stages to drive both design and the currently ongoing construction at the Wulkuraka Project Site. This case study sourced information from a series of semi-structured interviews covering a cross-section of key stakeholders on the project. The present research identified 25 benefits gained from implementing BIM processes and tools. Some of the most prominent benefits were those leading to improved outcomes and higher customer satisfaction such as improved communications, data and information management, and coordination. There were also a number of expected benefits for future phases such as: • Improved decision making through the use of BIM for managing assets • Improved models through BIM maturity • Better utilisation of BIM for procurement on similar future projects • New capacity to specify the content of BIM models within contracts There were also three benefits that were expected to have been achieved but were not realised on the NGR project. These were higher construction information quality levels, better alignment in design teams as well as project teams, and capability improvements in measuring the impact of BIM on construction safety. This report includes individual profiles describing each benefit as well as the tools and processes that enabled them. Four key BIM metrics were found to be currently in use and six more were identified as potential metrics for the future. This case study also provides insights into challenges associated with implementing BIM on a project of the size and complexity of the NGR. Procurement aspects and lessons learned for managers are also highlighted, including a list of recommendations for developing a framework to assess the benefits of BIM across the project life-cycle.
Resumo:
This paper discusses the influences of labor regulations on unionization rates through the comparative analysis of Argentina, Chile and Mexico, expecting to contribute to the understanding of the determinants of unionization in Latin America. These regulations, though only one of the factors determining unionization levels, have a crucial role, their influence being at least threefold: they define entitlements to and exclusions from the right to unionize, affect union recruitment strategies and, by generating incentives and disincentives, contribute to shape individual membership decisions. After discussing historical aspects of unionization in the three countries, the analysis centers successively in two periods in which the countries compared showed both similarities and contrasts relevant to the analysis of unionization trends. In the first, the comparison is between Argentina (1976-83) and Chile (1973-89), both under military regimes that had much in common, but with contrasting unionization trends. In the second, the focus is in Argentina (1991-2001) and Mexico (1984-2000), where the reforms implemented to liberalize the economy and ensuing social-economic and labor market transformations were similar, but unionization trends differed. It is argued that, in each case, the divergent behavior of unionization, in spite of the similar economic and sociopolitical contexts, may at least partly be attributed to differences in key labor institutions.
Resumo:
Building Information Modelling (BIM) is a digital process that encompasses all aspects, disciplines and systems of built assets within a single virtual model. This allows stakeholders to collaborate more accurately and efficiently than with traditional processes. Case study 1 Design: New Generation Rollingstock Maintenance Centre, Queensland. Case Study 2 Construction: Perth Children's Hospital, Western Australia. Case Study 3 Asset Management: Sydney Opera House, New South Wales. This project sought to provide the built environment industry with a framework to measure and maximize benefits from implementing BIM across the life-cycle phases of a built asset.
Resumo:
Hermansky-Pudlak syndrome (HPS) is a group of disorders characterized by the malformation of lysosome-related organelles, such as pigment cell melanosomes. Three of nine characterized HPS subtypes result from mutations in subunits of BLOC-2, a protein complex with no known molecular function. In this paper, we exploit melanocytes from mouse HPS models to place BLOC-2 within a cargo transport pathway from recycling endosomal domains to maturing melanosomes. In BLOC-2-deficient melanocytes, the melanosomal protein TYRP1 was largely depleted from pigment granules and underwent accelerated recycling from endosomes to the plasma membrane and to the Golgi. By live-cell imaging, recycling endosomal tubules of wild-type melanocytes made frequent and prolonged contacts with maturing melanosomes; in contrast, tubules from BLOC-2-deficient cells were shorter in length and made fewer, more transient contacts with melanosomes. These results support a model in which BLOC-2 functions to direct recycling endosomal tubular transport intermediates to maturing melanosomes and thereby promote cargo delivery and optimal pigmentation.