941 resultados para 350210 Quality Management
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Natural Resources is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Natural Resources is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Natural Resources is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
This monthly report from the Iowa Department of Natural Resources is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
[eng] ISO standard 9001 is one of a set of management tools that libraries have adopted in recent years. This article focuses on libraries in higher education institutions that have received ISO certification of their quality management systems (ISO standard 9001:2000). We examine their reasons for seeking certification and the advantages and difficulties they have encountered in applying this ISO standard. Finally, we consider the future prospects of ISO standard 9001 in university libraries.
Resumo:
Interest groups advocate centre-specific outcome data as a useful tool for patients in choosing a hospital for their treatment and for decision-making by politicians and the insurance industry. Haematopoietic stem cell transplantation (HSCT) requires significant infrastructure and represents a cost-intensive procedure. It therefore qualifies as a prime target for such a policy. We made use of the comprehensive database of the Swiss Blood Stem Cells Transplant Group (SBST) to evaluate potential use of mortality rates. Nine institutions reported a total of 4717 HSCT - 1427 allogeneic (30.3%), 3290 autologous (69.7%) - in 3808 patients between the years 1997 and 2008. Data were analysed for survival- and transplantation-related mortality (TRM) at day 100 and at 5 years. The data showed marked and significant differences between centres in unadjusted analyses. These differences were absent or marginal when the results were adjusted for disease, year of transplant and the EBMT risk score (a score incorporating patient age, disease stage, time interval between diagnosis and transplantation, and, for allogeneic transplants, donor type and donor-recipient gender combination) in a multivariable analysis. These data indicate comparable quality among centres in Switzerland. They show that comparison of crude centre-specific outcome data without adjustment for the patient mix may be misleading. Mandatory data collection and systematic review of all cases within a comprehensive quality management system might, in contrast, serve as a model to ascertain the quality of other cost-intensive therapies in Switzerland.
Resumo:
The Quality Management Earthwork (QM-E) special provision was implemented on a pilot project to evaluate quality control (QC) and quality assurance (QA) testing in predominately unsuitable soils. Control limits implemented on this pilot project included the following: 95% relative compaction, moisture content not exceeding +/- 2% of optimum moisture content, soil strength not exceeding a dynamic cone penetrometer (DCP) index of 70 mm/blow, vertical uniformity not exceeding a variation in DCP index of 40 mm/blow, and lift thickness not exceeding depth determined through construction of control strips. Four-point moving averages were used to allow for some variability in the measured parameter values. Management of the QC/QA data proved to be one of the most challenging aspects of the pilot project. Implementing use of the G-RAD data collection system has considerable potential to reduce the time required to develop and maintain QC/QA records for projects using the QM-E special provision. In many cases, results of a single Proctor test were used to establish control limits that were used for several months without retesting. While the data collected for the pilot project indicated that the DCP index control limits could be set more tightly, there is not enough evidence to support making a change. In situ borings, sampling, and testing in natural unsuitable cut material and compacted fill material revealed that the compacted fill had similar strength characteristics to that of the natural cut material after less than three months from the start of construction.
Resumo:
This report describes test results from a full-scale embankment pilot study conducted in Iowa. The intent of the pilot project was to field test and refine the proposed soil classification system and construction specifications developed in Phase II of this research and to evaluate the feasibility of implementing a contractor quality control (QC) and Iowa DOT quality assurance (QA) program for earthwork grading in the future. One of the primary questions for Phase III is “Was embankment quality improved?” The project involved a “quality conscious” contractor, well-qualified and experienced Iowa Department of Transportation field personnel, a good QC consultant technician, and some of our best soils in the state. If the answer to the above question is “yes” for this project, it would unquestionably be “yes” for other projects as well. The answer is yes, the quality was improved, even for this project, as evidenced by dynamic cone penetrometer test data and the amount of disking required to reduce the moisture content to within acceptable control limits (approximately 29% of soils by volume required disking). Perhaps as important is that we know what quality we have. Increased QC/QA field testing, however, increases construction costs, as expected. The quality management-earthwork program resulted in an additional $0.03 per cubic meter, or 1.6%, of the total construction costs. Disking added about $0.04 per cubic meter, or 1.7%, to the total project costs. In our opinion this is a nominal cost increase to improve quality. It is envisioned that future contractor innovations have the potential for negating this increase. The Phase III results show that the new soil classification system and the proposed field test methods worked well during the Iowa Department of Transportation soils design phase and during the construction phase. Recommendations are provided for future implementation of the results of this study by city, county, and state agencies.
Resumo:
In Iowa, the Department of Natural Resources (DNR)is responsible for regulating water allocation and use through the issuance of water use permits, but improvements are necessary in this process to assure sustainable supplies into the future. In recent years, there have not been resources dedicated at the state level to properly track and assess water quantity issues. Resources for water use and water quantity monitoring (groundwater level and surface gauges) have continued to decline and have resulted in data becoming outdated and in a format that is difficult to analyze in order to make good decisions.