970 resultados para 120201 Building Construction Management and Project Planning


Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the sustainability awareness rises globally, the construction industry is under increasing pressure to improve efficiency and project delivery. The implementation of Industrialised Building Systems (IBS), for which utility components are built offsite, has the potential of promoting sustainability deliverables. This can be achieved by better control of production environment, minimising construction waste, using efficient building material energy, and stabilising work conditions. As a unique building technology, IBS has not been effectively implemented in Malaysia. Possible reasons may include limited understanding among stakeholders on the IBS potential and its relevance to sustainability. This warrants studies on the sustainability issues of IBS design, construction, operation and maintenance, A framework is being developed through research to assess performance criteria related to sustainability, which should be considered during IBS design and application in the most consistent and systematic way. This paper discusses how these sustainability performance criteria are examined in a continuing research project and the processes conducive to implementing sustainable IBS in Malaysia. Existing tools, indicators and guidelines are reviewed, analysed and grouped according to characteristics and application. The research also hopes to produce guidelines for stakeholders to incorporate sustainability issues and concepts into IBS applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In high-risk industries, companies with well-conceived crisis management plans are at a commercial advantage. While there is some understanding of the risk management practices of construction companies, there is little insight into their crisis preparedness. This paper presents the findings of exploratory research that investigated this issue. Using a diagnostic model of crisis preparedness that has been developed and tested across a broad range of industries, it concludes that if the sample surveyed is typical, then corporate philosophies in construction companies do not support crisis management activities. Furthermore, crisis planning is rudimentary and undertaken in an insular, informal, fragmented fashion, supported by few resources and little strategic guidance. Consequently, many construction companies will have an inadequate understanding of their crisis exposure, of how to cope with crises when they happen, and of how to learn and recover from their aftermath.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project selection is a decision-making process that is not merely influenced by technical aspects but also by the people who involved in the process. Organisational culture is described as a set of values and norms that are shared by people within the organisation that affects the way they interact with each other and with stakeholders from outside the organisation. The aim of this paper is to emphasize the importance of organisational culture on improving the quality of decisions in the project selection process, in addition to the influence of technical aspects of a project. The discussion is based on an extensive literature review and, as such, represents the first part of a research agenda investigating the impact of organisational culture on the project selection process applicable specifically to road infrastructure contracts. Four existing models of organisational culture (Denison 1990; Cameron and Quinn 2006; Hofstede 2001; Glaser et al 1987) are discussed and reviewed in view of their use in the larger research project to investigate the impact of culture on identified critical elements of decision-making. An understating of the way organisational culture impacts on project selection will increase the likelihood in future of relevant government departments selecting projects that achieve their stated organisational goals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

campaign to oppose projects proposed in their local community. The social constructionist perspective advocates that these motivations are driven by activists’ interpretation of reality, such that activists will assign multiple meanings to and frame environmental issues in a way that reflects their view of reality. Past research suggest that these are also influenced by patterns of shared meaning and interpretation that develop over time in protest movements that shape activists’ perceptions of the environmental risks and impacts associated with construction activity. This paper explores the role of gender distinctions in shaping perceptions of environmental risk and how this affects their framing of the environmental, social, cultural/ historical impacts associated with a construction project. Using Snow and Benford’s (1988) 3-prong analytical tool for framing: diagnostic framing, prognostic framing and motivational framing, this paper presents findings from the content analysis of in-depth interviews of 24 activists protesting against a highly controversial housing project in the greater Sydney metropolitan area. The research adopts a single case study approach, and is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24-hour community picket in Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose---The aim of this study is to identify complexity measures for building projects in the People’s Republic of China (PRC). Design/Methodology/Approach---A three-round of Delphi questionnaire survey was conducted to identify the key parameters that measure the degree of project complexity. A complexity index (CI) was developed based on the identified measures and their relative importance. Findings---Six key measures of project complexity have been identified, which include, namely (1) building structure & function; (2) construction method; (3) the urgency of the project schedule; (4) project size/scale; (5) geological condition; and (6) neighboring environment. Practical implications---These complexity measures help stakeholders assess degrees of project complexity and better manage the potential risks that might be induced to different levels of project complexity. Originality/Value---The findings provide insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This summary is based on an international review of leading peer reviewed journals, in both technical and management fields. It draws on highly cited articles published between 2000 and 2009 to investigate the research question, "What are the diffusion determinants for passive building technologies in Australia?". Using a conceptual framework drawn from the innovation systems literature, this paper synthesises and interprets the literature to map the current state of passive building technologies in Australia and to analyse the drivers for, and obstacles to, their optimal diffusion. The paper concludes that the government has a key role to play through its influence over the specification of building codes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.