976 resultados para project delay estimation


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This letter presents a method to model propagation channels for estimation, in which the sampling scheme can be arbitrary. Additionally, the method yields accurate models, with a size that converges to the channel duration, measured in Nyquist periods. It can be viewed as an improvement on the usual discretization based on regular sampling at the Nyquist rate. The method is introduced in the context of multiple delay estimation using the MUSIC estimator, and is assessed through a numerical example.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we present an on-line estimation algorithm for an uncertain time delay in a continuous system based on the observational input-output data, subject to observational noise. The first order Pade approximation is used to approximate the time delay. At each time step, the algorithm combines the well known Kalman filter algorithm and the recursive instrumental variable least squares (RIVLS) algorithm in cascade form. The instrumental variable least squares algorithm is used in order to achieve the consistency of the delay parameter estimate, since an error-in-the-variable model is involved. An illustrative example is utilized to demonstrate the efficacy of the proposed approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Managing software maintenance is rarely a precise task due to uncertainties concerned with resources and services descriptions. Even when a well-established maintenance process is followed, the risk of delaying tasks remains if the new services are not precisely described or when resources change during process execution. Also, the delay of a task at an early process stage may represent a different delay at the end of the process, depending on complexity or services reliability requirements. This paper presents a knowledge-based representation (Bayesian Networks) for maintenance project delays based on specialists experience and a corresponding tool to help in managing software maintenance projects. (c) 2006 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Spatial tracking is one of the most challenging and important parts of Mixed Reality environments. Many applications, especially in the domain of Augmented Reality, rely on the fusion of several tracking systems in order to optimize the overall performance. While the topic of spatial tracking sensor fusion has already seen considerable interest, most results only deal with the integration of carefully arranged setups as opposed to dynamic sensor fusion setups. A crucial prerequisite for correct sensor fusion is the temporal alignment of the tracking data from several sensors. Tracking sensors are typically encountered in Mixed Reality applications, are generally not synchronized. We present a general method to calibrate the temporal offset between different sensors by the Time Delay Estimation method which can be used to perform on-line temporal calibration. By applying Time Delay Estimation on the tracking data, we show that the temporal offset between generic Mixed Reality spatial tracking sensors can be calibrated. To show the correctness and the feasibility of this approach, we have examined different variations of our method and evaluated various combinations of tracking sensors. We furthermore integrated this time synchronization method into our UBITRACK Mixed Reality tracking framework to provide facilities for calibration and real-time data alignment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most traditional methods for extracting the relationships between two time series are based on cross-correlation. In a non-linear non-stationary environment, these techniques are not sufficient. We show in this paper how to use hidden Markov models (HMMs) to identify the lag (or delay) between different variables for such data. We first present a method using maximum likelihood estimation and propose a simple algorithm which is capable of identifying associations between variables. We also adopt an information-theoretic approach and develop a novel procedure for training HMMs to maximise the mutual information between delayed time series. Both methods are successfully applied to real data. We model the oil drilling process with HMMs and estimate a crucial parameter, namely the lag for return.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most traditional methods for extracting the relationships between two time series are based on cross-correlation. In a non-linear non-stationary environment, these techniques are not sufficient. We show in this paper how to use hidden Markov models to identify the lag (or delay) between different variables for such data. Adopting an information-theoretic approach, we develop a procedure for training HMMs to maximise the mutual information (MMI) between delayed time series. The method is used to model the oil drilling process. We show that cross-correlation gives no information and that the MMI approach outperforms maximum likelihood.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In real-time systems, there are two distinct trends for scheduling task sets on unicore systems: non-preemptive and preemptive scheduling. Non-preemptive scheduling is obviously not subject to any preemption delay but its schedulability may be quite poor, whereas fully preemptive scheduling is subject to preemption delay, but benefits from a higher flexibility in the scheduling decisions. The time-delay involved by task preemptions is a major source of pessimism in the analysis of the task Worst-Case Execution Time (WCET) in real-time systems. Preemptive scheduling policies including non-preemptive regions are a hybrid solution between non-preemptive and fully preemptive scheduling paradigms, which enables to conjugate both world's benefits. In this paper, we exploit the connection between the progression of a task in its operations, and the knowledge of the preemption delays as a function of its progression. The pessimism in the preemption delay estimation is then reduced in comparison to state of the art methods, due to the increase in information available in the analysis.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In embedded systems, the timing behaviour of the control mechanisms are sometimes of critical importance for the operational safety. These high criticality systems require strict compliance with the offline predicted task execution time. The execution of a task when subject to preemption may vary significantly in comparison to its non-preemptive execution. Hence, when preemptive scheduling is required to operate the workload, preemption delay estimation is of paramount importance. In this paper a preemption delay estimation method for floating non-preemptive scheduling policies is presented. This work builds on [1], extending the model and optimising it considerably. The preemption delay function is subject to a major tightness improvement, considering the WCET analysis context. Moreover more information is provided as well in the form of an extrinsic cache misses function, which enables the method to provide a solution in situations where the non-preemptive regions sizes are small. Finally experimental results from the implementation of the proposed solutions in Heptane are provided for real benchmarks which validate the significance of this work.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Con esta disertación se pretenden resolver algunos de los problemas encontrados actualmente en la recepción de señales de satélites bajo dos escenarios particularmente exigentes: comunicaciones de Espacio Profundo y en banda Ka. Las comunicaciones con sondas de Espacio Profundo necesitan grandes aperturas en tierra para poder incrementar la velocidad de datos. La opción de usar antennas con diámetro mayor de 35 metros tiene serios problemas, pues antenas tan grandes son caras de mantener, difíciles de apuntar, pueden tener largos tiempo de reparación y además tienen una efeciencia decreciente a medida que se utilizan bandas más altas. Soluciones basadas en agrupaciones de antenas de menor tamaño (12 ó 35 metros) son mas ecónomicas y factibles técnicamente. Las comunicaciones en banda Ka tambien pueden beneficiarse de la combinación de múltiples antennas. Las antenas de menor tamaño son más fáciles de apuntar y además tienen un campo de visión mayor. Además, las técnicas de diversidad espacial pueden ser reemplazadas por una combinación de antenas para así incrementar el margen del enlace. La combinación de antenas muy alejadas sobre grandes anchos de banda, bien por recibir una señal de banda ancha o múltiples de banda estrecha, es complicada técnicamente. En esta disertación se demostrará que el uso de conformador de haz en el dominio de la frecuencia puede ayudar a relajar los requisitos de calibración y, al mismo tiempo, proporcionar un mayor campo de visión y mayores capacidades de ecualización. Para llevar esto a cabo, el trabajo ha girado en torno a tres aspectos fundamentales. El primero es la investigación bibliográfica del trabajo existente en este campo. El segundo es el modelado matemático del proceso de combinación y el desarrollo de nuevos algoritmos de estimación de fase y retardo. Y el tercero es la propuesta de nuevas aplicaciones en las que usar estas técnicas. La investigación bibliográfica se centra principalmente en los capítulos 1, 2, 4 y 5. El capítulo 1 da una breve introducción a la teoría de combinación de antenas de gran apertura. En este capítulo, los principales campos de aplicación son descritos y además se establece la necesidad de compensar retardos en subbandas. La teoría de bancos de filtros se expone en el capítulo 2; se selecciona y simula un banco de filtros modulado uniformemente con fase lineal. Las propiedades de convergencia de varios filtros adaptativos se muestran en el capítulo 4. Y finalmente, las técnicas de estimación de retardo son estudiadas y resumidas en el capítulo 5. Desde el punto de vista matemático, las principales contribución de esta disertación han sido: • Sección 3.1.4. Cálculo de la desviación de haz de un conformador de haz con compensación de retardo en pasos discretos en frecuencia intermedia. • Sección 3.2. Modelo matemático de un conformador de haz en subbandas. • Sección 3.2.2. Cálculo de la desviación de haz de un conformador de haz en subbandas con un buffer de retardo grueso. • Sección 3.2.4. Análisis de la influencia de los alias internos en la compensación en subbandas de retardo y fase. • Sección 3.2.4.2. Cálculo de la desviación de haz de un conformador de haz con compensación de retardo en subbandas. • Sección 3.2.6. Cálculo de la ganancia de relación señal a ruido de la agrupación de antenas en cada una de las subbandas. • Sección 3.3.2. Modelado de la función de transferencia de la agrupación de antenas bajo errores de estimación de retardo. • Sección 3.3.3. Modelado de los efectos de derivas de fase y retardo entre actualizaciones de las estimaciones. • Sección 3.4. Cálculo de la directividad de la agrupación de antenas con y sin compensación de retardos en subbandas. • Sección 5.2.6. Desarrollo de un algorimo para estimar la fase y el retardo entre dos señales a partir de su descomposición de subbandas bajo entornos estacionarios. • Sección 5.5.1. Desarrollo de un algorimo para estimar la fase, el retardo y la deriva de retardo entre dos señales a partir de su descomposición de subbandas bajo entornos no estacionarios. Las aplicaciones que se pueden beneficiar de estas técnicas son descritas en el capítulo 7: • Sección 6.2. Agrupaciones de antenas para comunicaciones de Espacio Profundo con capacidad multihaz y sin requisitos de calibración geométrica o de retardo de grupo. • Sección 6.2.6. Combinación en banda ancha de antenas con separaciones de miles de kilómetros, para recepción de sondas de espacio profundo. • Secciones 6.4 and 6.3. Combinación de estaciones remotas en banda Ka en escenarios de diversidad espacial, para recepción de satélites LEO o GEO. • Sección 6.3. Recepción de satélites GEO colocados con arrays de antenas multihaz. Las publicaciones a las que ha dado lugar esta tesis son las siguientes • A. Torre. Wideband antenna arraying over long distances. Interplanetary Progress Report, 42-194:1–18, 2013. En esta pulicación se resumen los resultados de las secciones 3.2, 3.2.2, 3.3.2, los algoritmos en las secciones 5.2.6, 5.5.1 y la aplicación destacada en 6.2.6. • A. Torre. Reception of wideband signals from geostationary collocated satellites with antenna arrays. IET Communications, Vol. 8, Issue 13:2229–2237, September, 2014. En esta segunda se muestran los resultados de la sección 3.2.4, el algoritmo en la sección 5.2.6.1 , y la aplicación mostrada en 6.3. ABSTRACT This dissertation is an attempt to solve some of the problems found nowadays in the reception of satellite signals under two particular challenging scenarios: Deep Space and Ka-band communications. Deep Space communications require from larger apertures on ground in order to increase the data rate. The option of using single dishes with diameters larger than 35 meters has severe drawbacks. Such antennas are expensive to maintain, prone to long downtimes, difficult to point and have a degraded performance in high frequency bands. The array solution, either with 12 meter or 35 meter antennas is deemed to be the most economically and technically feasible solution. Ka-band communications can also benefit from antenna arraying technology. The smaller aperture antennas that make up the array are easier to point and have a wider field of view allowing multiple simultaneous beams. Besides, site diversity techniques can be replaced by pure combination in order to increase link margin. Combination of far away antennas over a large bandwidth, either because a wideband signal or multiple narrowband signals are received, is a demanding task. This dissertation will show that the use of frequency domain beamformers with subband delay compensation can help to ease calibration requirements and, at the same time, provide with a wider field of view and enhanced equalization capabilities. In order to do so, the work has been focused on three main aspects. The first one is the bibliographic research of previous work on this subject. The second one is the mathematical modeling of the array combination process and the development of new phase/delay estimation algorithms. And the third one is the proposal of new applications in which these techniques can be used. Bibliographic research is mainly done in chapters 1, 2, 4 and 5. Chapter 1 gives a brief introduction to previous work in the field of large aperture antenna arraying. In this chapter, the main fields of application are described and the need for subband delay compensation is established. Filter bank theory is shown in chapter 2; a linear phase uniform modulated filter bank is selected and simulated under diverse conditions. The convergence properties of several adaptive filters are shown in chapter 4. Finally, delay estimation techniques are studied and summarized in chapter 5. From a mathematical point of view, the main contributions of this dissertation have been: • Section 3.1.4. Calculation of beam squint of an IF beamformer with delay compensation at discrete time steps. • Section 3.2. Establishment of a mathematical model of a subband beamformer. • Section 3.2.2. Calculation of beam squint in a subband beamformer with a coarse delay buffer. • Section 3.2.4. Analysis of the influence of internal aliasing on phase and delay subband compensation. • Section 3.2.4.2. Calculation of beam squint of a beamformer with subband delay compensation. • Section 3.2.6. Calculation of the array SNR gain at each of the subbands. • Section 3.3.2. Modeling of the transfer function of an array subject to delay estimation errors. • Section 3.3.3. Modeling of the effects of phase and delay drifts between estimation updates. • Section 3.4. Calculation of array directivity with and without subband delay compensation. • Section 5.2.6. Development of an algorithm to estimate relative delay and phase between two signals from their subband decomposition in stationary environments. • Section 5.5.1. Development of an algorithm to estimate relative delay rate, delay and phase between two signals from their subband decomposition in non stationary environments. The applications that can benefit from these techniques are described in chapter 7: • Section 6.2. Arrays of antennas for Deep Space communications with multibeam capacity and without geometric or group delay calibration requirement. • Section 6.2.6. Wideband antenna arraying over long distances, in the range of thousands of kilometers, for reception of Deep Space probes. • Sections 6.4 y 6.3. Combination of remote stations in Ka-band site diversity scenarios for reception of LEO or GEO satellites. • Section 6.3. Reception of GEO collocated satellites with multibeam antenna arrays. The publications that have been made from the work in this dissertation are • A. Torre. Wideband antenna arraying over long distances. Interplanetary Progress Report, 42-194:1–18, 2013. This article shows the results in sections 3.2, 3.2.2, 3.3.2, the algorithms in sections 5.2.6, 5.5.1 and the application in section 6.2.6. • A. Torre. Reception of wideband signals from geostationary collocated satellites with antenna arrays. IET Communications, Vol. 8, Issue 13:2229–2237, September, 2014. This second article shows among others the results in section 3.2.4, the algorithm in section 5.2.6.1 , and the application in section 6.3.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Recently underwater sensor networks (UWSN) attracted large research interests. Medium access control (MAC) is one of the major challenges faced by UWSN due to the large propagation delay and narrow channel bandwidth of acoustic communications used for UWSN. Widely used slotted aloha (S-Aloha) protocol suffers large performance loss in UWSNs, which can only achieve performance close to pure aloha (P-Aloha). In this paper we theoretically model the performances of S-Aloha and P-Aloha protocols and analyze the adverse impact of propagation delay. According to the observation on the performances of S-Aloha protocol we propose two enhanced S-Aloha protocols in order to minimize the adverse impact of propagation delay on S-Aloha protocol. The first enhancement is a synchronized arrival S-Aloha (SA-Aloha) protocol, in which frames are transmitted at carefully calculated time to align the frame arrival time with the start of time slots. Propagation delay is taken into consideration in the calculation of transmit time. As estimation error on propagation delay may exist and can affect network performance, an improved SA-Aloha (denoted by ISA-Aloha) is proposed, which adjusts the slot size according to the range of delay estimation errors. Simulation results show that both SA-Aloha and ISA-Aloha perform remarkably better than S-Aloha and P-Aloha for UWSN, and ISA-Aloha is more robust even when the propagation delay estimation error is large. © 2011 IEEE.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The universities rely on the Information Technology (IT) projects to support and enhance their core strategic objectives of teaching, research, and administration. The researcher’s literature review found that the level of IT funding and resources in the universities is not adequate to meet the IT demands. The universities received more IT project requests than they could execute. As such, universities must selectively fund the IT projects. The objectives of the IT projects in the universities vary. An IT project which benefits the teaching functions may not benefit the administrative functions. As such, the selection of an IT project is challenging in the universities. To aid with the IT decision making, many universities in the United States of America (USA) have formed the IT Governance (ITG) processes. ITG is an IT decision making and accountability framework whose purpose is to align the IT efforts in an organization with its strategic objectives, realize the value of the IT investments, meet the expected performance criteria, and manage the risks and the resources (Weil & Ross, 2004). ITG in the universities is relatively new, and it is not well known how the ITG processes are aiding the nonprofit universities in selecting the right IT projects, and managing the performance of these IT projects. This research adds to the body of knowledge regarding the IT project selection under the governance structure, the maturity of the IT projects, and the IT project performance in the nonprofit universities. The case study research methodology was chosen for this exploratory research. The convenience sampling was done to choose the cases from two large, research universities with decentralized colleges, and two small, centralized universities. The data were collected on nine IT projects from these four universities using the interviews and the university documents. The multi-case analysis was complemented by the Qualitative Comparative Analysis (QCA) to systematically analyze how the IT conditions lead to an outcome. This research found that the IT projects were selected in the centralized universities in a more informed manner. ITG was more authoritative in the small centralized universities; the ITG committees were formed by including the key decision makers, the decision-making roles, and responsibilities were better defined, and the frequency of ITG communication was higher. In the centralized universities, the business units and colleges brought the IT requests to ITG committees; which in turn prioritized the IT requests and allocated the funds and the resources to the IT projects. ITG committee members in the centralized universities had a higher awareness of the university-wide IT needs, and the IT projects tended to align with the strategic objectives. On the other hand, the decentralized colleges and business units in the large universities were influential and often bypassed the ITG processes. The decentralized units often chose the “pet” IT projects, and executed them within a silo, without bringing them to the attention of the ITG committees. While these IT projects met the departmental objectives, they did not always align with the university’s strategic objectives. This research found that the IT project maturity in the university could be increased by following the project management methodologies. The IT project management maturity was found higher in the IT projects executed by the centralized university, where a full-time project manager was assigned to manage the project, and the project manager had a higher expertise in the project management. The IT project executed under the guidance of the Project Management Office (PMO) has exhibited a higher project management maturity, as the PMO set the standards and controls for the project. The IT projects managed by the decentralized colleges by a part-time project manager with lower project management expertise have exhibited a lower project management maturity. The IT projects in the decentralized colleges were often managed by the business, or technical leads, who often lacked the project management expertise. This research found that higher the IT project management maturity, the better is the project performance. The IT projects with a higher maturity had a lower project delay, lower number of missed requirements, and lower number of IT system errors. This research found that the quality of IT decision in the university could be improved by centralizing the IT decision-making processes. The IT project management maturity could be improved by following the project management methodologies. The stakeholder management and communication were found critical for the success of the IT projects in the university. It is hoped that the findings from this research would help the university leaders make the strategic IT decisions, and the university’s IT project managers make the IT project decisions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Real-time monitoring applications may be used in a wireless sensor network (WSN) and may generate packet flows with strict quality of service requirements in terms of delay, jitter, or packet loss. When strict delays are imposed from source to destination, the packets must be delivered at the destination within an end-to-end delay (EED) hard limit in order to be considered useful. Since the WSN nodes are scarce both in processing and energy resources, it is desirable that they only transport useful data, as this contributes to enhance the overall network performance and to improve energy efficiency. In this paper, we propose a novel cross-layer admission control (CLAC) mechanism to enhance the network performance and increase energy efficiency of a WSN, by avoiding the transmission of potentially useless packets. The CLAC mechanism uses an estimation technique to preview packets EED, and decides to forward a packet only if it is expected to meet the EED deadline defined by the application, dropping it otherwise. The results obtained show that CLAC enhances the network performance by increasing the useful packet delivery ratio in high network loads and improves the energy efficiency in every network load.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Corporate world is becoming more and more competitive. This leads organisations to adapt to this reality, by adopting more efficient processes, which result in a decrease in cost as well as an increase of product quality. One of these processes consists in making proposals to clients, which necessarily include a cost estimation of the project. This estimation is the main focus of this project. In particular, one of the goals is to evaluate which estimation models fit the Altran Portugal software factory the most, the organization where the fieldwork of this thesis will be carried out. There is no broad agreement about which is the type of estimation model more suitable to be used in software projects. Concerning contexts where there is plenty of objective information available to be used as input to an estimation model, model-based methods usually yield better results than the expert judgment. However, what happens more frequently is not having this volume and quality of information, which has a negative impact in the model-based methods performance, favouring the usage of expert judgement. In practice, most organisations use expert judgment, making themselves dependent on the expert. A common problem found is that the performance of the expert’s estimation depends on his previous experience with identical projects. This means that when new types of projects arrive, the estimation will have an unpredictable accuracy. Moreover, different experts will make different estimates, based on their individual experience. As a result, the company will not directly attain a continuous growing knowledge about how the estimate should be carried. Estimation models depend on the input information collected from previous projects, the size of the project database and the resources available. Altran currently does not store the input information from previous projects in a systematic way. It has a small project database and a team of experts. Our work is targeted to companies that operate in similar contexts. We start by gathering information from the organisation in order to identify which estimation approaches can be applied considering the organization’s context. A gap analysis is used to understand what type of information the company would have to collect so that other approaches would become available. Based on our assessment, in our opinion, expert judgment is the most adequate approach for Altran Portugal, in the current context. We analysed past development and evolution projects from Altran Portugal and assessed their estimates. This resulted in the identification of common estimation deviations, errors, and patterns, which lead to the proposal of metrics to help estimators produce estimates leveraging past projects quantitative and qualitative information in a convenient way. This dissertation aims to contribute to more realistic estimates, by identifying shortcomings in the current estimation process and supporting the self-improvement of the process, by gathering as much relevant information as possible from each finished project.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia Civil