929 resultados para distribution management system
Resumo:
Since the 80s huge efforts have been made to utilize renewable energy sources to generate electric power. An important issue about using renewable energy sources is a Distribution Management System (DMS) in presence of dispersed generators. This paper reports some aspects of integration of the dispersed generators in the DMS. Besides, an investigation of impact of the dispersed generators on the overall performances of the distribution systems in steady state is performed. In order to observe losses in the distribution networks with dispersed generators, several loss allocation methods are applied. Results obtained from case study using IEEE test network, are presented and discussed. © 2003 IEEE.
Resumo:
This study aims at detailing bimodal pore distribution by means of water retention curve in an oxidic-gibbsitic Latosol and in a kaolinitic cambisol Latossol under conservation management system of coffee crop. Samples were collected at depths of 20; 40; 80; 120 and 160 cm on coffee trees rows and between rows under oxidic-gibbsitic Latosol (LVd) and kaolinitic cambisol Latossol (LVAd). Water retention curve was determined at matrix potentials (Ψm) -1; -2; -4; -6; -10 kPa obtained from the suction unit; the Ψm of -33; -100; -500; -1,500 kPa were obtained by the Richards extractor, and WP4-T psychrometer was used to determine Ψm -1,500 to -300,000 kPa. The water retention data were adjusted to the double van Genuchten model by nonlinear model procedures of the R 2.12.1 software. Was estimated the model parameter and inflection point slope. The system promoted changes in soil structure and water retention for the conditions evaluated, and both showed bimodal pores distribution, which were stronger in LVd. There was a strong influence of mineralogy gibbsitic in the water retention more negative than Ψm -1500 kPa, reflected in the values of the residual water content.
Resumo:
Recent developments in power electronics technology have made it possible to develop competitive and reliable low-voltage DC (LVDC) distribution networks. Further, islanded microgrids—isolated small-scale localized distribution networks— have been proposed to reliably supply power using distributed generations. However, islanded operations face many issues such as power quality, voltage regulation, network stability, and protection. In this thesis, an energy management system (EMS) that ensures efficient energy and power balancing and voltage regulation has been proposed for an LVDC island network utilizing solar panels for electricity production and lead-acid batteries for energy storage. The EMS uses the master/slave method with robust communication infrastructure to control the production, storage, and loads. The logical basis for the EMS operations has been established by proposing functionalities of the network components as well as by defining appropriate operation modes that encompass all situations. During loss-of-powersupply periods, load prioritizations and disconnections are employed to maintain the power supply to at least some loads. The proposed EMS ensures optimal energy balance in the network. A sizing method based on discrete-event simulations has also been proposed to obtain reliable capacities of the photovoltaic array and battery. In addition, an algorithm to determine the number of hours of electric power supply that can be guaranteed to the customers at any given location has been developed. The successful performances of all the proposed algorithms have been demonstrated by simulations.
Resumo:
Increased penetration of generation and decentralised control are considered to be feasible and effective solution for reducing cost and emissions and hence efficiency associated with power generation and distribution. Distributed generation in combination with the multi-agent technology are perfect candidates for this solution. Pro-active and autonomous nature of multi-agent systems can provide an effective platform for decentralised control whilst improving reliability and flexibility of the grid.
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
In distribution system operations, dispatchers at control center closely monitor system operating limits to ensure system reliability and adequacy. This reliability is partly due to the provision of remote controllable tie and sectionalizing switches. While the stochastic nature of wind generation can impact the level of wind energy penetration in the network, an estimate of the output from wind on hourly basis can be extremely useful. Under any operating conditions, the switching actions require human intervention and can be an extremely stressful task. Currently, handling a set of switching combinations with the uncertainty of distributed wind generation as part of the decision variables has been nonexistent. This thesis proposes a three-fold online management framework: (1) prediction of wind speed, (2) estimation of wind generation capacity, and (3) enumeration of feasible switching combinations. The proposed methodology is evaluated on 29-node test system with 8 remote controllable switches and two wind farms of 18MW and 9MW nameplate capacities respectively for generating the sequence of system reconfiguration states during normal and emergency conditions.
Resumo:
This paper is a report about the FuXML project carried out at the FernUniversität Hagen. FuXML is a Learning Content Management System (LCMS) aimed at providing a practical and efficient solution for the issues attributed to authoring, maintenance, production and distribution of online and offline distance learning material. The paper presents the environment for which the system was conceived and describes the technical realisation. We discuss the reasons for specific implementation decisions and also address the integration of the system within the organisational and technical infrastructure of the university.
Resumo:
This Strategic Plan provides the Iowa Department of Transportation with guidelines for defining the acquisition and implementation of a document management system to automate current manual methods of document handling and distribution. In preparation for the production of the Strategic Plan, the USI Team conducted a series of user interviews at the DOT Ames and East Central Iowa Transportation Region facilities, and reviewed various documents relating to day-to-day operations.
Resumo:
The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.
Resumo:
Systematic Municipal Solid Waste Management (MSWM) authorities of Sri Lanka contributes to exchange some productive outputs with localities; however it is still not in a successful mode due to limitations and environmental failures in their operation. Most of these local administrations are directly dumping Municipal Solid Waste (MSW) to an open dumping site, this manner of inappropriate disposal of MSW is become a major threat to the environment and public health in developing countries like Sri Lanka. This study was conducted for the MSWM practices of Balangoda Urban Council. The research was performed based on analyzing information obtained from field observations; reports; literature; questionnaire distribution among community; and a series of formal interviews with major stakeholders. The ongoing MSWM practices of Balangoda Urban Council encompass six categories as waste minimization and handling; waste collection; on-site separation; waste transportation; further management including grading, composting, recycling, producing sludge fertilizer; and final disposal to an open dump site. Apart from those, training sessions on MSWM are also being conducted. The purpose of this paper is to assess current status of urban waste management scenario and highlight strengths and weaknesses to understand the sustainability of the system which would help any local authority to improve MSWM.
Resumo:
The aim of this article is to analyze the theoretical model proposed by [Jabbour CJC, Santos FCA. Relationships between human resource dimensions and environmental management in companies: proposal of a model. Journal of Cleaner Production 2008;16(1):5 1-8.] based on the data collected in four Brazilian companies. This model investigates how the phases of the environmental management system can be linked to human resource practices in order to attain continuous improvement of a company`s environmental performance. Our aim is to contribute to a field, which has little empirical evidence. Although the interaction between the phases of the environmental management system and human resource practices is recommended by the specialized literature [Daily BE Huang S. Achieving sustainability through attention to human resource factors in environmental management. International Journal of Operations and Production Management 2001:21(12):1539-52.], the results indicate that most of the theoretical assumptions could not be confirmed in these Brazilian companies. (C) 2008 Elsevier Ltd. All rights reserved.
Resumo:
This paper presents a proposal for a Quality Management System for a generic GNSS Surveying Company as an alternative for management and service quality improvements. As a result of the increased demand for GNSS measurements, a large number of new or restructured companies were established to operate in that market. Considering that GNSS surveying is a new process, some changes must be performed in order to accommodate the old surveying techniques and the old fashioned management to the new reality. This requires a new management model that must be based on a well-described procedure sequence aiming at the Total Management Quality for the company. The proposed Quality Management System was based on the requirements of the Quality System ISO 9000:2000, applied to the whole company, focusing on the productive process of GNSS surveying work.
Resumo:
The purpose of this study is to characterize how Portuguese Small and Medium Enterprises (SMEs) view the Occupational Health and Safety Management Systems (OHSMSs) certification process, after receiving the Quality Management System (QMS) certification. References were based on the ISO 9001 standard for a QMS and OHSAS 18001 for OHSMS. The method used to evaluate the implemented systems, was by form of questionnaire. Those questioned had to have a certified quality management system, an implemented OHSMS and be a SME. The questionnaire was sent to 300 SMEs; 46 responses were received and validated. Of them, only 12 SMEs had the OHSMS certificate according to OHSAS 18001. Within those 12 companies that participated: 7 SMEs are from the industrial sector; 3 belong to the electricity/telecommunications sector and 2 SMEs are from the trade/services activity sector. The size of the sample was small, but corresponds to Portuguese reality. Moreover, 34 SMEs did not have the OHSMS certificate. The questionnaire requested the main reasons for SMEs to opt for non-certification and it was related with high costs, while the main reasons to certificate were, among others, needed to eliminate or minimize risks to workers. The main benefits that Portuguese SMEs have gained from the referred certifications have been, improved working conditions, ensuring compliance with legislation and better internal communication about risks and hazards. Also presented are the main difficulties in achieving an OHSMS certification including high certification costs, difficulties motivating personnel, difficulties in changing the company’s culture and increased bureaucracy.
Resumo:
It is known the power of ideas is tremendous. But there are employees in many companies who have good ideas but not put them into practice. On the other hand, there are many others who have good ideas and are encouraged to contribute their ideas for innovation in the company. This study attempts to identify factors that contribute to success in managing ideas and consequent business innovation. The method used was the case study applied to two companies. During the investigation, factors considered essential for the success of an idea management program were identified, of which we highlight, among others, evidences the results, involvement of the top management, establishment of goals and objectives; recognition; dissemination of good results. Companies with these implemented systems, capture the best ideas from their collaborators and apply them internally. This study intends to contribute to business innovation in enterprises through creation and idea management, mainly through collecting the best ideas of their own employees. The results of this study can be used to help improving deployed suggestions systems, as well as, all managers who wish to implement suggestions systems/ideas management systems.