388 resultados para Shucking yard


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The study was undertaken with the aim to study the variation of different components in the drip/liquid and meat sampled at different stages of processing. The fresiand the frozen oyster meat were canned in Tin and in Aluminium cans. Various media like brine, oil, tomato sauce and wine were used. Observations were made physically and chemically for the drip/liquids and the meat at different stages of processing. The chemical analysis were made for certain nutritional and mineral components

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tradução

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Natural Resources (IDNR) has requested the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program evaluate future health impacts of exposures at the formerly utilized Chicago Milwaukee St. Paul Rail Yard located on the west side of Perry, Iowa. This site has undergone a Targeted Brownfields Assessment conducted by the Contaminated Sites Section of the IDNR. This health consultation assesses potential health risks to people from future exposure to soil and surface water within the property boundary, and any health impacts resulting from contaminated groundwater beneath the site property from an evaluation of the data collected during the Targeted Brownfields Assessment. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This master’s thesis was done for Andritz Inc. Atlanta Georgia. The purpose of the thesis was to develop a new trolley for a small portal log yard crane. In the beginning of the thesis the basic principles of the systematic design processes have been described, along which the design work of the trolley has proceeded. The second literature part consists of the design and dimensioning of the welded steel structures under fatigue loading. The design work of the trolley consists of the engineering and the selection of the mechanical components and the design of the load carrying structure for the trolley. The realization of the steel structure of the trolley is based on the fatigue and static dimensioning. The fatigue dimensioning is grounded in the life expectations estimated for the trolley and the static dimensioning is based on the CMAA guidelines. The computer aided element method was utilized in the design of the steel structure. The effective notch method and the hot spot method were used in the fatigue calculations. The trolley structure was carried out by using the sheet metal parts in order to manufacture the structure as effective and low cost way as possible. The corner stone of the dimensioning of the trolley structure was the utilization of the open profiles made of welded or cold formed sheet metals, which provide better weldability, weld inspection, access for repairs and corrosion protection. As a last part of the thesis a new trolley traveling system was developed. The distribution of the wheel loads of the trolley bogies on the main girder was also studied, which led to an innovative suspension arrangement between the trolley leg and the bogie. The new bogie solution increases the service life of the main girder of the crane and improves the stability of the bogies. The outcome of the thesis is an excellent trolley structure from the weight and the service life point of view.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bergkvist insjön AB is a sawmill yard which is capable of producing 350,000 cubic meter of timber every year this requires lot of internal resources. Sawmill operations can be classified as unloading, sorting, storage and production of timber. In the company we have trucks arriving at random they have to be unloaded and sent back at the earliest to avoid queuing up of trucks creating a problem for truck owners. The sawmill yard has to operate with two log stackers that does several tasks including transporting the logs from trucks to measurement station where the logs will be sorted into classes and dropped into pockets from pockets to the sorted timber yard where they are stored and finally from there to sawmill for final processing. The main issue that needs to be answered here is the lining up trucks that are waiting to be unload, creating a problem for both sawmill as well as the truck owners and given huge production volume, it is certain that handling of resources is top priority. A key challenge in handling of resources would be unloading of trucks and finding a way to optimize internal resources.To address this problem i have experimented on different ways of using internal resources, i have designed different cases, in case 1 we have both the log stackers working on sawmill and measurement station. The main objective of having this case is to make sawmill and measurement station to work all the time. Then in case 2, i have divided the work between both the log stackers, one log stacker will be working on sawmill and pocket_control and second log stacker will be working on measurement station and truck. Then in case 3 we have only one log stacker working on all the agents, this case was designed to reduce cost of production, as the experiment cannot be done in real-time due to operational cost, for this purpose simulation is used, preliminary investigation into simulation results suggested that case 2 is the best option has it reduced waiting time of trucks considerably when compared with other cases and it showed 50% increase in optimizing internal resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasing costs and competitive business strategies are pushing sawmill enterprises to make an effort for optimization of their process management. Organizational decisions mainly concentrate on performance and reduction of operational costs in order to maintain profit margins. Although many efforts have been made, effective utilization of resources, optimal planning and maximum productivity in sawmill are still challenging to sawmill industries. Many researchers proposed the simulation models in combination with optimization techniques to address problems of integrated logistics optimization. The combination of simulation and optimization technique identifies the optimal strategy by simulating all complex behaviours of the system under consideration including objectives and constraints. During the past decade, an enormous number of studies were conducted to simulate operational inefficiencies in order to find optimal solutions. This paper gives a review on recent developments and challenges associated with simulation and optimization techniques. It was believed that the review would provide a perfect ground to the authors in pursuing further work in optimizing sawmill yard operations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports the findings of using multi-agent based simulation model to evaluate the sawmill yard operations within a large privately owned sawmill in Sweden, Bergkvist Insjön AB in the current case. Conventional working routines within sawmill yard threaten the overall efficiency and thereby limit the profit margin of sawmill. Deploying dynamic work routines within the sawmill yard is not readily feasible in real time, so discrete event simulation model has been investigated to be able to report optimal work order depending on the situations. Preliminary investigations indicate that the results achieved by simulation model are promising. It is expected that the results achieved in the current case will support Bergkvist-Insjön AB in making optimal decisions by deploying efficient work order in sawmill yard.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bin planning (arrangements) is a key factor in the timber industry. Improper planning of the storage bins may lead to inefficient transportation of resources, which threaten the overall efficiency and thereby limit the profit margins of sawmills. To address this challenge, a simulation model has been developed. However, as numerous alternatives are available for arranging bins, simulating all possibilities will take an enormous amount of time and it is computationally infeasible. A discrete-event simulation model incorporating meta-heuristic algorithms has therefore been investigated in this study. Preliminary investigations indicate that the results achieved by GA based simulation model are promising and better than the other meta-heuristic algorithm. Further, a sensitivity analysis has been done on the GA based optimal arrangement which contributes to gaining insights and knowledge about the real system that ultimately leads to improved and enhanced efficiency in sawmill yards. It is expected that the results achieved in the work will support timber industries in making optimal decisions with respect to arrangement of storage bins in a sawmill yard.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador: