996 resultados para Queensland buildings
Resumo:
This publication lists the more important wood properties of commercial timbers used for construction in Queensland. It also provides requirements and conditions of use for these timbers to provide appropriate design service life in various construction applications. The correct specification of timber considers a range of timber properties including, but not limited to, stress grade; durability class; moisture content and insect resistance. For the specification of timber sizes and spans, relevant Australian Standards and design manuals should be consulted—e.g. Australian Standard AS 1684 series Residential timber—framed construction parts 2 and 3 (Standards Australia 2006a;b.) Book 1 explains the terms used; with reference to nomenclature; origin and timber properties presented under specific column headings in the schedules (Book 2). It also explains target design life; applications and decay hazard zones; presented in the Book 2 Schedules. Book 2 consists of reference tables; presented as schedules A; B and C: • Schedule A contains commercial mixtures of unidentified timbers and of some Australian and imported softwoods. Index numbers 1–10 • Schedule B contains Australian-grown timber species; including both natural forests and plantations. Index numbers 11–493 • Schedule C contains timbers imported into Australia from overseas. Index numbers 494–606 Each schedule has two parts presenting data in tables. • Part 1: Nomenclature, origin and properties of imported timber species • Part 2: Approved uses for commercial mixtures of imported timber species The recommendations made in this publication assume that good building practice will be carried out.
Development of Thermally Comfortable Industrial Buildings with Effective Use of Computer Simulations
Resumo:
With the accelerated trend of global warming, the thermal behavior of existing buildings, which were typically designed based on current weather data, may not be able to cope with the future climate. This paper quantifies, through computer simulations, the increased cooling loads imposed by potential global warming and probable indoor temperature increases due to possible undersized air-conditioning system. It is found from the sample office building examined that the existing buildings would generally be able to adapt to the increasing warmth of 2030 year Low and High scenarios projections and 2070 year Low scenario projection. However, for the 2070 year High scenario, the study indicates that the existing office buildings, in all capital cities except for Hobart, will suffer from overheating problems. When the annual average temperature increase exceeds 2°C, the risk of current office buildings subjected to overheating will be significantly increased. For existing buildings which are designed with current climate condition, it is shown that there is a nearly linear correlation between the increase of average external air temperature and the increase of building cooling load. For the new buildings, in which the possible global warming has been taken into account in the design, a 28-59% increase of cooling capacity under 2070 High scenario would be required to improve the building thermal comfort level to an acceptable standard.
Environmental assessment for commercial buildings: Stakeholder requirements and tool characteristics
Resumo:
The Cooperative Research Centre for Construction Innovation (CRC CI) is a national research, development and implementation centre focused on the needs of the property, design, construction and facility management sectors. Established in 2001 and headquartered at Queensland University of Technology as an unincorporated joint venture under the Australian Government's Cooperative Research Program, the CRC CI is developing key technologies, tools and management systems to improve the effectiveness of the construction industry. The CRC CI is a seven year project funded by a Commonwealth grant and industry, research and other government support. More than 150 researchers and an alliance of 19 leading partner organisations are involved in and support the activities of the CRC CI
Resumo:
This report fully summarises a project designed to enhance commercial real estate performance within both operational and investment contexts through the development of a model aimed at supporting improved decision-making. The model is based on a risk adjusted discounted cash flow, providing a valuable toolkit for building managers, owners, and potential investors for evaluating individual building performance in terms of financial, social and environmental criteria over the complete life-cycle of the asset. The ‘triple bottom line’ approach to the evaluation of commercial property has much significance for the administrators of public property portfolios in particular. It also has applications more generally for the wider real estate industry given that the advent of ‘green’ construction requires new methods for evaluating both new and existing building stocks. The research is unique in that it focuses on the accuracy of the input variables required for the model. These key variables were largely determined by market-based research and an extensive literature review, and have been fine-tuned with extensive testing. In essence, the project has considered probability-based risk analysis techniques that required market-based assessment. The projections listed in the partner engineers’ building audit reports of the four case study buildings were fed into the property evaluation model developed by the research team. The results are strongly consistent with previously existing, less robust evaluation techniques. And importantly, this model pioneers an approach for taking full account of the triple bottom line, establishing a benchmark for related research to follow. The project’s industry partners expressed a high degree of satisfaction with the project outcomes at a recent demonstration seminar. The project in its existing form has not been geared towards commercial applications but it is anticipated that QDPW and other industry partners will benefit greatly by using this tool for the performance evaluation of property assets. The project met the objectives of the original proposal as well as all the specified milestones. The project has been completed within budget and on time. This research project has achieved the objective by establishing research foci on the model structure, the key input variable identification, the drivers of the relevant property markets, the determinants of the key variables (Research Engine no.1), the examination of risk measurement, the incorporation of risk simulation exercises (Research Engine no.2), the importance of both environmental and social factors and, finally the impact of the triple bottom line measures on the asset (Research Engine no. 3).
Resumo:
Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.
Resumo:
Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.
Resumo:
The resources listed in this document describe the design and construction opportunities available to building owners who wish to re-Life their properties. They do not yet examine management opportunities, which may also help owners improve the efficiency of their existing stock.
Resumo:
This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.