939 resultados para Public building


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

IPLV overall coefficient, presented by Air-Conditioning and Refrigeration Institute (ARI) of America, shows running/operation status of air-conditioning system host only. For overall operation coefficient, logical solution has not been developed, to reflect the whole air-conditioning system under part load. In this research undertaking, the running time proportions of air-conditioning systems under part load have been obtained through analysis on energy consumption data during practical operation in all public buildings in Chongqing. This was achieved by using analysis methods, based on the statistical energy consumption data distribution of public buildings month-by-month. Comparing with the weight number of IPLV, part load operation coefficient of air-conditioning system, based on this research, does not only show the status of system refrigerating host, but also reflects and calculate energy efficiency of the whole air-conditioning system. The coefficient results from the processing and analyzing of practical running data, shows the practical running status of area and building type (actual and objective) – not clear. The method is different from model analysis which gets IPLV weight number, in the sense that this method of coefficient results in both four equal proportions and also part load operation coefficient of air-conditioning system under any load rate as necessary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Climate change is expected to increase earth’s temperatures and consequently result in more frequent extreme weather events such as cyclones, storms, droughts and floods and rising global sea levels. This phenomenon will affect all assets. This paper discusses the impact of climate change and its consequences on public buildings. Public building management encompasses the building life cycle from planning, procurement, operation, repair and maintenance and building disposal. This paper recommends climate change adaptation strategies to be integrated into public building management. The roles and responsibilities of asset managers and users are discussed within the framework of planning and implementation of public building management and the integration of climate change adaptation strategies. A key point is that climate change can induce premature obsolescence of public buildings and services, which will increase the maintenance and refurbishment costs. This in turn will affect the life cycle cost of the building. Furthermore, a business continuity plan is essential for public building management in the context of disasters. The paper also highlights the significant role that the occupants of public buildings can play in the development and implementation of climate change adaptation strategies.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This paper outlines a forensic method for analysing the energy, environmental and comfort performance of a building. The method has been applied to a recently developed event space in an Irish public building, which was evaluated using on-site field studies, data analysis, building simulation and occupant surveying. The method allows for consideration of both the technological and anthropological aspects of the building in use and for the identification of unsustainable operational practice and emerging problems. The forensic analysis identified energy savings of up to 50%, enabling a more sustainable, lower-energy operational future for the building. The building forensic analysis method presented in this paper is now planned for use in other public and commercial buildings.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology

Relevância:

60.00% 60.00%

Publicador:

Resumo:

With an increase in growing number of aging public building infrastructure globally, there is an opportunity for an efficient life care management rather then mere demolition and rebuild. By carefully implementing appropriate structural engineering practices with facility management, the whole of life cycle costs for public building assets can be optimised and public money can be saved and better utilised elsewhere. A need of decision support tool/methodology which can assist asset manager make better decision among demolish, refurbish, do nothing or rebuilt option for any typical building under consideration is growing in order to optimise maintenance funds. The paper is part of research project focusing on development of such methodology known as residual service life prediction. The paper is mainly focusing on following three major aspects of public building infrastructure; first, issues and challenges in optimisation of maintenance funds, second, residual service life prediction methodology and issues and challenges in the development of such methodology. The paper concludes with the authors’ observations and further research potentials

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Maine's 3,500 miles of coastline is the longest coastline in the continental US. The goal of our study was to use GIS to estimate the impact future global sea level rise could potentially have on our state. We show the area of coastline and some of the economic and social impacts that would result from a rise of one meter and six meters. We used roads to estimate the impact on infrastructure and public building, including schools, libraries, hospitals, police and fire stations, as a measure of social impact. A sea level rise of six meters would result in a loss of over 650 km¬2 from coastal communities and cost the state of Maine over 3 million in repaving costs. Through our study, we hope coastal communities will be able to prepare for and react to the predicted changes in global sea level.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The present work concerns the use of shade elements as architectural elements to block sunlight in public buildings. In a city like Natal, (5o South) the incidence of sunrays in any type of design should be a constant concern for all the architects. Besides, this habit of avoiding insolation in the environment is not a common practice. Within this context, the present work has the objective to dig deep into the knowledge of solar control, studying some cases and verifying its function according to the orientation and the original design of the building, having in mind if the shade elements usually used in the region have achieved their purpose of providing protection against the incidence of direct sun rays. This study considers the position of the shade element (horizontal and vertical), the angle formed between them and the respective facades, and the local of the buildings in relation to their orientation during the summer, winter and equinox solstice. As supporting instruments the solar map of the city and the protractor, for measuring shade angles, were used. It was concluded that in all the cases studied, it was not possible to obtain the maximum use of the elements. It was verified that the best type of shade element (more efficient) for the city of Natal is the mixed type (horizontal and vertical) and that the vertical shade elements are more efficient in the early mornings and late afternoon. The horizontal shade elements are used more effective at midday. We intend to present the results of this study to the architects in the region in order to show them the correct ways of using the shade elements according to the possible orientation on the facade, as a supporting tool at the time of designing a project as well as a subsidy for further discussions on the elaboration of the new urban standards for the city of Natal/RN

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Mode of access: Internet.