916 resultados para Pipeline Maintenance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The petroleum pipeline industry in the United States is challenged with maintaining the integrity of their pipelines, while also protecting the environment during any pipeline repairs. This project provides information on the activities relating to the industry Integrity Management Program, assesses the process that federal agencies are developing to create streamlined permitting processes, and if the necessary federal, state, and local wetland permits can be obtained in the time frame required by the law. Recommendations are also made for implementation of a fast-track wetland permitting process and what pipeline companies can do to speed up the permitting process. This project focuses on the refined petroleum pipelines that originate near the Gulf of Mexico and terminate in the Northeastern United States.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Maakaasuputkiston huolto- ja muutostöiden yhteydessä joudutaan tyhjentämään putkisto kaasusta, jotta voidaan taata turvalliset työskentelyolosuhteet. Nykyisin putkisto tyhjennetään johtamalla kaasu ilmakehään, avaamalla putkiston ulospuhallusventtiilit. Koska maakaasu (metaani) on merkittävä kasvihuonekaasu, on ympäristövaatimusten tiukentuessa etsittävä vaihtoehtoisia keinoja vähentää päästöjä. Lisäksi, talteen otettu kaasu voidaan myydä edelleen, ja näin ollen saavuttaa säästöjä. Tässä työssä on tutkittu mahdollisuuksia komprimoida kaasu siirrettävän kompressorin avulla putkisto-osuudesta toiseen ilman, että kaasua jouduttaisiin puhaltamaan ilmakehään. Työssä päädyttiin johtopäätökseen, että siirrettävän kompressorin hankinta ei ole tällä hetkellä kannattavaa, sen korkeiden investointikustannusten vuoksi. Kuitenkin mahdollinen päästömaksu metaanille, kaasun arvon nousu, sekä tekniikan parantuminen voivat nostaa menetelmän varteenotettavaksi vaihtoehdoksi hyvinkin nopeasti. Tämän vuoksi jatkotutkimuksen tekeminen aiheesta on perusteltua.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is both time-wasting and expensive. A risk-based model that reduces the amount of time spent on inspection has been presented. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests efficient design and operation philosophy, construction methodology and logical insurance plans. The risk-based model uses Analytic Hierarchy Process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost, and the cumulative effect of failure is determined through probability analysis. The technique does not totally eliminate subjectivity, but it is an improvement over the existing inspection method.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The existing method of pipeline monitoring, which requires an entire pipeline to be inspected periodically, wastes time and is expensive. A risk-based model that reduces the amount of time spent on inspection has been developed. This model not only reduces the cost of maintaining petroleum pipelines, but also suggests an efficient design and operation philosophy, construction method and logical insurance plans.The risk-based model uses analytic hierarchy process, a multiple attribute decision-making technique, to identify factors that influence failure on specific segments and analyze their effects by determining the probabilities of risk factors. The severity of failure is determined through consequence analysis, which establishes the effect of a failure in terms of cost caused by each risk factor and determines the cumulative effect of failure through probability analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Road maintenance work has gradually been increasing in Latin America. Existing contracts in Argentina, Chile, Guatemala and Uruguay - 210 overall - account for a total of 20,212 kilometers of public roadways by level of service. In Brazil, Ecuador and Peru, 26 contracts are now in the pipeline for the maintenance of 7,700 kilometres of roadway. This issue of the FAL Bulletin presents a survey of the status of road maintenance considered at the second Seminar of the Americas of the Road Maintenance Training Programme (Provial), held in Lima, Peru from 18 to 21 October 1999 and which examined the type of financing used in road maintenance as well as contracts, institutions and interaction between the public and private sectors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is unproductive. A risk-based decision support system (DSS) that reduces the amount of time spent on inspection has been presented. The risk-based DSS uses the analytic hierarchy process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of occurrence of these risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost and the cumulative effect of failure is determined through probability analysis. The model optimizes the cost of pipeline operations by reducing subjectivity in selecting a specific inspection method, identifying and prioritizing the right pipeline segment for inspection and maintenance, deriving budget allocation, providing guidance to deploy the right mix labor for inspection and maintenance, planning emergency preparation, and deriving logical insurance plan. The proposed methodology also helps derive inspection and maintenance policy for the entire pipeline system, suggest design, operational philosophy, and construction methodology for new pipelines.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore oil and gas pipelines are vulnerable to environment as any leak and burst in pipelines cause oil/gas spill resulting in huge negative Impacts on marine lives. Breakdown maintenance of these pipelines is also cost-intensive and time-consuming resulting in huge tangible and intangible loss to the pipeline operators. Pipelines health monitoring and integrity analysis have been researched a lot for successful pipeline operations and risk-based maintenance model is one of the outcomes of those researches. This study develops a risk-based maintenance model using a combined multiple-criteria decision-making and weight method for offshore oil and gas pipelines in Thailand with the active participation of experienced executives. The model's effectiveness has been demonstrated through real life application on oil and gas pipelines in the Gulf of Thailand. Practical implications. Risk-based inspection and maintenance methodology is particularly important for oil pipelines system, as any failure in the system will not only affect productivity negatively but also has tremendous negative environmental impact. The proposed model helps the pipelines operators to analyze the health of pipelines dynamically, to select specific inspection and maintenance method for specific section in line with its probability and severity of failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this study was to evaluate in situ changes in the alveolar crest bone height around immediate implant-supported crowns in comparison to tooth-supported crowns (control) with the cervical margins located at the bone crest level, without occlusal load. In Group I, after extraction of 12 mandibular premolars from 4 adult dogs, implants from Branemark System (MK III TiU RP 4.0 x 11.5 mm) were placed to retain complete acrylic crowns. In Group II, premolars were prepared to receive complete metal crowns. Sixteen weeks after placement of the crowns (38 weeks after tooth extraction), the height of the alveolar bone crest was measured with a digital caliper. Data were analyzed statistically by the Mann-Whitney test at 5% significance level. The in situ analysis showed no statistically significant difference (p=0.880) between the implant-supported and the tooth-supported groups (1.528 + 0.459 mm and 1.570 + 0.263 mm, respectively). Based on the findings of the present study, it may be concluded that initial peri-implant bone loss may result from the remodeling process necessary to establish the biological space, similar to which occurs with tooth-supported crowns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES: The aim of this study was to assess the infuence of efforts applied to modify the patients' behavior towards periodontal maintenance. MATERIAL AND METHODS: Patients were classifed into three groups: Complete Compliance (participation in all visits), Irregular Compliance (irregular participation, one or more missing appointments), and Noncompliance (abandoned or never returned to the program). Complete compliers received usual procedures of the maintenance visit. The irregular compliers and non-compliers received usual procedures and strategies such as reminding next visit, informing patients on both periodontal disease and importance of maintenance, motivating the patient who showed an improvement in compliance. Thus, 137 patients were observed for 12 months. RESULTS: The degree of compliance has increased signifcantly during this period (p=0.001). No association was detected between age or gender and compliance degree. CONCLUSIONS: The results have shown that the intervention applied had a favorable infuence on the patients' compliance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this in vitro study was to evaluate four different approaches to the decision of changing or not defective amalgam restorations in first primary molar teeth concerning the loss of dental structure. Ditched amalgam restorations (n = 11) were submitted to four different treatments, as follows: Control group - polishing and finishing of the restorations were carried out; Amalgam group - the ditched amalgam restorations were replaced by new amalgam restorations; Composite resin group - the initial amalgam restorations were replaced by composite resin restorations; Flowable resin group - the ditching around the amalgam restorations was filled with flowable resin. Images of the sectioned teeth were made and the area of the cavities before and after the procedures was determined by image analysis software to assess structural loss. The data were submitted to ANOVA complemented by the Student Newman Keuls test (p < 0.05). The cavities in all the groups presented significantly greater areas after the procedures. However, the amalgam group showed more substantial dental loss. The other three groups presented no statistically significant difference in dental structure loss after the re-treatments. Thus, replacing ditched amalgam restorations by other similar restorations resulted in a significant dental structure loss while maintaining them or replacing them by resin restorations did not result in significant loss.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stingless bees play an important ecological role as pollinators of many wild plant species in the tropics and have significant potential for the pollination of agricultural crops. Nevertheless, conservation efforts as well as commercial breeding programmes require better guidelines on the amount of genetic variation that is needed to maintain viable populations. In this context, we carried out a long-term genetic study on the stingless bee Melipona scutellaris to evaluate the population viability consequences of prolonged breeding from a small number of founder colonies. In particular, it was artificially imposed a genetic bottleneck by setting up a population starting from only two founder colonies, and continued breeding from it for a period of over 10 years in a location outside its natural area of occurrence. We show that despite a great reduction in the number of alleles present at both neutral microsatellite loci and the sex-determining locus relative to its natural source population, and an increased frequency in the production of sterile diploid males, the genetically impoverished population could be successfully bred and maintained for at least 10 years. This shows that in stingless bees, breeding from a small stock of colonies may have less severe consequences than previously suspected. In addition, we provide a simulation model to determine the number of colonies that are needed to maintain a certain number of sex alleles in a population, thereby providing useful guidelines for stingless bee breeding and conservation efforts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents the development of a decision support system for the management of geotechnical and environmental risks in oil pipelines using a geographical information system. The system covers a 48.5 km long section of the So Paulo to Brasilia (OSBRA) oil pipeline, which crosses three municipalities in the northeast region of the So Paulo state (Brazil) and represents an area of 205.8 km(2). The spatial database was created using geo-processing procedures, surface and intrusive investigations and geotechnical reports. The risk assessment was based mainly on qualitative models (relative numeric weights and multicriteria decision analysis) and considered pluvial erosion, slope movements, soil corrosion and third party activities. The maps were produced at a scale of 1:10,000.