878 resultados para Offshore oil well drilling.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"Paper no. 54-Pet-19 for presentation at the ninth annual Petroleum Mechanical Engineering Conference, Los Angeles, California September 27-29, 1954. American Society of Mechanical Engineers."
Resumo:
During the petroleum well drilling operation many mechanical and hydraulic parameters are monitored by an instrumentation system installed in the rig called a mud-logging system. These sensors, distributed in the rig, monitor different operation parameters such as weight on the hook and drillstring rotation. These measurements are known as mud-logging records and allow the online following of all the drilling process with well monitoring purposes. However, in most of the cases, these data are stored without taking advantage of all their potential. On the other hand, to make use of the mud-logging data, an analysis and interpretationt is required. That is not an easy task because of the large volume of information involved. This paper presents a Support Vector Machine (SVM) used to automatically classify the drilling operation stages through the analysis of some mud-logging parameters. In order to validate the results of SVM technique, it was compared to a classification elaborated by a Petroleum Engineering expert. © 2006 IEEE.
Resumo:
"October 1, 1978."
Resumo:
Mode of access: Internet.
Resumo:
"March 1985."
Resumo:
"OCS sale 45."
Resumo:
Cover title: Proposed 1979 Outer Continental Shelf oil and gas lease sale 58, western and central Gulf of Mexico.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
There are over 6000 natural resource drilling platforms in the Gulf of Mexico, all of which will become obsolete once their deposits are extracted. This study examined one of the possible alternate uses for these platforms, wind power potential. Using ArcGIS the number of platforms was reduced by weighting their distance from National Data Buoy Center wind speed collection points and water depth. Calculations were done to assess the optimal sites remaining, as well as provide an estimate of the energy potential for each site. Data for this project was obtained from the Minerals Management Service (MMS), United States Geological Service (USGS), and National Data Buoy Center (NDBC). A major limitation of this project was a lack of NDBC wind speed buoys, creating large data gaps and excluding many oil rigs that have otherwise high energy potential.
Resumo:
The main concern of activities developed in oil and gas well construction is safety. But safety during the well construction process is not a trivial subject. Today risk evaluation approaches are based in static analyses of existent systems. In other words, those approaches do not allow a dynamic analysis that evaluates the risk for each alteration of the context. This paper proposes the use of Quantitative and Dynamic Risk Assessment (QDRA) to assess the degree of safety of each planned job. The QDRA can be understood as a safe job analysis approach, developed with the purpose of quantifying the safety degree in entire well construction and maintenance activities. The QDRA is intended to be used in the planning stages of well construction and maintenance, where the effects of hazard on job sequence are important unknowns. This paper also presents definitions of barrier, and barriers integrated set (BIS), and a modeling technique showing their relationships. (c) 2006 Elsevier B.V. All rights reserved.
Resumo:
"MMS 84-0007"--Cover.