944 resultados para Electronic Conveyancing National Law
Resumo:
This article will outline the impact of the Electronic Conveyancing National Law (ECNL) and the draft Model Participation Rules (MPR) on conveyancing practice and the obligations of lawyers and conveyancers.
Resumo:
Three proof requirements as essential for a sustainable land registration system. These were proof of identity, proof of ownership, and authority to deal. Our attention in this paper is drawn to the latter two requirements and will ask whether the introduction of the Property Exchange of Australia (PEXA), and its underpinning regulatory regime will meet the concerns that we have in relation to proof of ownership and authority to deal. In drawing out some problems with PEXA, we then offer an innovative idea, sourced from the transfer of equities that could serve to generate discussion on how we can ensure the Torrens system of land registration is sustainable for another 160 years.
Resumo:
New Zealand and Australia are leading the world in terms of automated land registry systems. Landonline was introduced some ten years ago for New Zealand, and the Electronic Conveyancing National Law (ECNL) is to be released over the next few years in support of a national electronic conveyancing system to be used throughout Australia. With the assistance of three proof requirements, developed for this purpose, this article measures the integrity of both systems as against the old, manual Torrens system. The authors take the position that any introduced system should at least have the same level of integrity and safety as the originally conceived manual system. The authors argue both Landonline and ECNL, as presently set up, have less credibility than the manual system as it was designed to operate, leading to the possibility of increased fraud or misuse.
Resumo:
Public key cryptography, and with it,the ability to compute digital signatures, have made it possible for electronic commerce to flourish. It is thus unsurprising that the proposed Australian NECS will also utilise digital signatures in its system so as to provide a fully automated process from the creation of electronic land title instrument to the digital signing, and electronic lodgment of these instruments. This necessitates an analysis of the fraud risks raised by the usage of digital signatures because a compromise of the integrity of digital signatures will lead to a compromise of the Torrens system itself. This article will show that digital signatures may in fact offer greater security against fraud than handwritten signatures; but to achieve this, digital signatures require an infrastructure whereby each component is properly implemented and managed.
Resumo:
We have previously suggested that three proof requirements are essential for a sustainable land registration system. These were proof of identity, proof of ownership and authority to deal. Our attention in this article is drawn to the security framework that surrounds these requirements. We will ask whether the introduction of the Property Exchange of Australia (PEXA), and its underpinning regulatory regime will meet the concerns that we have in relation to them. In drawing out some problems with PEXA, we then offer an innovative idea, sourced from the transfer of equities that could serve to generate discussion on how we can ensure the Torrens system of land registration is sustainable for another 160 years. We also canvass some more incremental suggestions that evolve out of what we currently do, as well as outlining some comparative externally sourced ideas as to how the transfer and ownership of land can be made safer for all citizens. Such a goal is imperative when land transfer and secure property ownership is a critical component of the economic infrastructure of a modern society.
Resumo:
The Reference Schedule to the REIQ houses and land contract and the lots in a Community Titles Scheme (“CTS”) contract has been amended to contain provision for disclosure concerning the installation of an approved safety switch. This section will not be required to be completed if the land is vacant (in the case of the houses and land contract) or if the present use is a commercial use (in the case of the lots in a CTS contract).
Resumo:
Private title insurance has been the subject of much debate by law reform bodies and academics. This article adds a new dimension to the discussion by analysing its role against a recent scenario where a nun was betrayed by the actions of her brother, and compensation payable from the assurance fund, after much challenge by the registrar, amounted to in excess of $4 million.We ask whether the slow burning of title insurance into the psyche of Australian home purchasers will see state-based assurance fundings looking to minismise their role in the Torrens system. We also query how the rather more immediate electronic establishment of electronic conveyancing will alter the balance between the assurance fund, private title insurance and the increasing responsibilities on stakeholdes involved in conveyancing.
Resumo:
Mode of access: Internet.
Resumo:
Shipping list no.: 88-701-P.
Resumo:
"April 20, 2006."
Resumo:
Caption title.