953 resultados para Cost Planning


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The overarching research work is based on two approaches: - Conceptual Analysis, Extraction and Linking - Experimentation with Product Libraries - Conceptual Analysis, Extraction and Linking: This aspect of the research has been achieved through the development of a conceptual framework for facilitating the understanding of the constituting components of BIM, Specifications and Cost Planning under investigation. The framework builds on theories spanning the constituent research themes and was used as a basis for justifying the elected approaches adopted throughout the research work. By means of tags and codes, a system for classifying building specification information has been developed as a differentiator between the chosen research approach and existing classification strategies in industry. Furthermore, syntactic links between extracted classes of specification information and cost planning have been established and will be adopted as a basis for authenticating the impact of specification information within BIM models. - Experimentation with Product Libraries Following the extraction and classification of BIM, Specifications and Cost Planning information, early experimentation on linking specifications to BIM models by means of a raas-based product library have been successful. A comparative analysis between a range of existing product libraries has also been realised. The outcomes have been amply documented in papers, all of which have received positive reviews. Ongoing experiments and analysis with the product library involve integrating the cost planning component for authenticating the completeness, relevance and impact of embedded specification within BIM models.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This digital poster (which was on display at "The Cube", Queensland University of Technology) demonstrates how specification parameters can be extracted from a product library repository for use in augmenting the information contents of the objects in a local BIM tool (Revit in this instance).

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The position of housing demand and supply is not consistent. The Australian situation counters the experience demonstrated in many other parts of the world in the aftermath of the Global Financial Crisis, with residential housing prices proving particularly resilient. A seemingly inexorable housing demand remains a critical issue affecting the socio-economic landscape. Underpinned by high levels of population growth fuelled by immigration, and further buoyed by sustained historically low interest rates, increasing income levels, and increased government assistance for first home buyers, this strong housing demand level ensures problems related to housing affordability continue almost unabated. A significant, but less visible factor impacting housing affordability relates to holding costs. Although only one contributor in the housing affordability matrix, the nature and extent of holding cost impact requires elucidation: for example, the computation and methodology behind the calculation of holding costs varies widely - and in some instances completely ignored. In addition, ambiguity exists in terms of the inclusion of various elements that comprise holding costs, thereby affecting the assessment of their relative contribution. Such anomalies may be explained by considering that assessment is conducted over time in an ever-changing environment. A strong relationship with opportunity cost - in turn dependant inter alia upon prevailing inflation and / or interest rates - adds further complexity. By extending research in the general area of housing affordability, this thesis seeks to provide a detailed investigation of those elements related to holding costs specifically in the context of midsized (i.e. between 15-200 lots) greenfield residential property developments in South East Queensland. With the dimensions of holding costs and their influence over housing affordability determined, the null hypothesis H0 that holding costs are not passed on can be addressed. Arriving at these conclusions involves the development of robust economic and econometric models which seek to clarify the componentry impacts of holding cost elements. An explanatory sequential design research methodology has been adopted, whereby the compilation and analysis of quantitative data and the development of an economic model is informed by the subsequent collection and analysis of primarily qualitative data derived from surveying development related organisations. Ultimately, there are significant policy implications in relation to the framework used in Australian jurisdictions that promote, retain, or otherwise maximise, the opportunities for affordable housing.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

It is widely held that strong relationships exist between housing, economic status, and well being. Therefore, recent events emerging from the United States, culminating in widespread housing stock surpluses in that country and others, threaten to destabilise many aspects related to individuals and community. However, despite global impact, the position of housing demand and supply is not consistent. The Australian position provides a strong contrast whereby continued strong housing demand generally remains a critical issue affecting the socio-economic landscape. Underpinned by strong levels of immigration, and further buoyed by sustained historically low interest rates, increasing income levels, and increased government assistance for first home buyers, this strong housing demand ensures elements related to housing affordability continue to gain prominence. A significant, but less visible factor impacting housing affordability – particularly new housing development – relates to holding costs. These costs are in many ways “hidden” and cannot always be easily identified. Although it is only one contributor, the nature and extent of its impact requires elucidation. In its simplest form, it commences with a calculation of the interest or opportunity cost of land holding. However, there is significantly more complexity for major new developments - particularly greenfield development. Analysis suggests that even small shifts in primary factors impacting holding costs can appreciably affect housing affordability. Those factors of greatest significance not only include interest rates and the rate of inflation, but even less apparent factors such as the regulatory assessment period. These are not just theoretical concepts but real, measurable price drivers. Ultimately, the real impact is felt by the one market segment whom can typically least afford it – new home, first home buyers. They can be easily pushed out of affordability. This paper suggests the stability and sustainability of growing, new communities require this problem to be acknowledged and accurately identified if the well being of such communities is to be achieved.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In this paper, both Distributed Generators (DG) and capacitors are allocated and sized optimally for improving line loss and reliability. The objective function is composed of the investment cost of DGs and capacitors along with loss and reliability which are converted to the genuine dollar. The bus voltage and line current are considered as constraints which should be satisfied during the optimization procedure. Hybrid Particle Swarm Optimization as a heuristic based technique is used as the optimization method. The IEEE 69-bus test system is modified and employed to evaluate the proposed algorithm. The results illustrate that the lowest cost planning is found by optimizing both DGs and capacitors in distribution networks.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Optimal scheduling of voltage regulators (VRs), fixed and switched capacitors and voltage on customer side of transformer (VCT) along with the optimal allocaton of VRs and capacitors are performed using a hybrid optimisation method based on discrete particle swarm optimisation and genetic algorithm. Direct optimisation of the tap position is not appropriate since in general the high voltage (HV) side voltage is not known. Therefore, the tap setting can be determined give the optimal VCT once the HV side voltage is known. The objective function is composed of the distribution line loss cost, the peak power loss cost and capacitors' and VRs' capital, operation and maintenance costs. The constraints are limits on bus voltage and feeder current along with VR taps. The bus voltage should be maintained within the standard level and the feeder current should not exceed the feeder-rated current. The taps are to adjust the output voltage of VRs between 90 and 110% of their input voltages. For validation of the proposed method, the 18-bus IEEE system is used. The results are compared with prior publications to illustrate the benefit of the employed technique. The results also show that the lowest cost planning for voltage profile will be achieved if a combination of capacitors, VRs and VCTs is considered.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Teachers of construction economics and estimating have for a long time recognised that there is more to construction pricing than detailed calculation of costs (to the contractor). We always get to the point where we have to say "of course, experience or familiarity of the market is very important and this needs judgement, intuition, etc". Quite how important is the matter in construction pricing is not known and we tend to trivialise its effect. If judgement of the market has a minimal effect, little harm would be done, but if it is really important then some quite serious consequences arise which go well beyond the teaching environment. Major areas of concern for the quantity surveyor are in cost modelling and cost planning - neither of which pay any significant attention to the market effect. There are currently two schools of thought about the market effect issue. The first school is prepared to ignore possible effects until more is known. This may be called the pragmatic school. The second school exists solely to criticise the first school. We will call this the antagonistic school. Neither the pragmatic nor the antagonistic schools seem to be particularly keen to resolve the issue one way or the other. The founder and leader of the antagonistic school is Brian Fine whose paper in 1974 is still the basic text on the subject, and in which he coined the term 'socially acceptable' price to describe what we now recognise as the market effect. Mr Fine's argument was then, and is since, that the uncertainty surrounding the contractors' costing and cost estimating process is such that the uncertainty surrounding the contractors' cost that it logically leads to a market-orientated pricing approach. Very little factual evidence, however, seems to be available to support these arguments in any conclusive manner. A further, and more important point for the pragmatic school, is that, even if the market effect is as important as Mr Fine believes, there are no indications of how it can be measured, evaluated or predicted. Since 1974 evidence has been accumulating which tends to reinforce the antagonists' view. A review of the literature covering both contractors' and designers' estimates found many references to the use of value judgements in construction pricing (Ashworth & Skitmore, 1985), which supports the antagonistic view in implying the existence of uncertainty overload. The most convincing evidence emerged quite by accident in some research we recently completed with practicing quantity surveyors in estimating accuracy (Skitmore, 1985). In addition to demonstrating that individual quantity surveyors and certain types of buildings had significant effect on estimating accuracy, one surprise result was that only a very small amount of information was used by the most expert surveyors for relatively very accurate estimates. Only the type and size of building, it seemed, was really relevant in determining accuracy. More detailed information about the buildings' specification, and even a sight to the drawings, did not significantly improve their accuracy level. This seemed to offer clear evidence that the constructional aspects of the project were largely irrelevant and that the expert surveyors were somehow tuning in to the market price of the building. The obvious next step is to feed our expert surveyors with more relevant 'market' information in order to assess its effect. The problem with this is that our experts do not seem able to verbalise their requirements in this respect - a common occurrence in research of this nature. The lack of research into the nature of market effects on prices also means the literature provides little of benefit. Hence the need for this study. It was felt that a clearer picture of the nature of construction markets would be obtained in an environment where free enterprise was a truly ideological force. For this reason, the United States of America was chosen for the next stage of our investigations. Several people were interviewed in an informal and unstructured manner to elicit their views on the action of market forces on construction prices. Although a small number of people were involved, they were thought to be reasonably representative of knowledge in construction pricing. They were also very well able to articulate their views. Our initial reaction to the interviews was that our USA subjects held very close views to those held in the UK. However, detailed analysis revealed the existence of remarkably clear and consistent insights that would not have been obtained in the UK. Further evidence was also obtained from literature relating to the subject and some of the interviewees very kindly expanded on their views in later postal correspondence. We have now analysed all the evidence received and, although a great deal is of an anecdotal nature, we feel that our findings enable at least the basic nature of the subject to be understood and that the factors and their interrelationships can now be examined more formally in relation to construction price levels. I must express my gratitude to the Royal Institution of Chartered Surveyors' Educational Trust and the University of Salford's Department of Civil Engineering for collectively funding this study. My sincere thanks also go to our American participants who freely gave their time and valuable knowledge to us in our enquiries. Finally, I must record my thanks to Tim and Anne for their remarkable ability to produce an intelligible typescript from my unintelligible writing.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Construction industry accounts for a tenth of global GDP. Still, challenges such as slow adoption of new work processes, islands of information, and legal disputes, remain frequent, industry-wide occurrences despite various attempts to address them. In response, IT-based approaches have been adopted to explore collaborative ways of executing construction projects. Building Information Modelling (BIM) is an exemplar of integrative technologies whose 3D-visualisation capabilities have fostered collaboration especially between clients and design teams. Yet, the ways in which specification documents are created and used in capturing clients' expectations based on industry standards have remained largely unchanged since the 18th century. As a result, specification-related errors are still common place in an industry where vast amounts of information are consumed as well as produced in the course project implementation in the built environment. By implication, processes such as cost planning which depend on specification-related information remain largely inaccurate even with the use of BIM-based technologies. This paper briefly distinguishes between non-BIM-based and BIM-based specifications and reports on-going efforts geared towards the latter. We review exemplars aimed at extending Building Information Models to specification information embedded within the objects in a product library and explore a viable way of reasoning about a semi-automated process of specification using our product library.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

As a vital component of construction professional services (CPS), construction management consultancy is in nature knowledge-intensive and client-tailored. Although recent studies have acknowledged the increasing role of this subsector of CPS in the attainment of sustainable construction, little attention has been given to the education and training of its main body, namely construction management consultants (CMCs). This study investigated the competence and knowledge structure of CMCs by taking China as an example. Using the methods of interview and questionnaire survey, three key competences of CMCs and the underpinned knowledge structure were identified. The identified competences are personnel quality, onsite practical skills, and continuing professional learning. Underpinned these competences are the knowledge structure composed of a number of disciplines including construction cost planning and control, civil engineering and construction, engineering contract and law, and construction project management. The research findings lay a solid foundation for future studies to probe into the role of construction management consultants in the area of sustainable construction.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The paper presents the ‘Marginal Activity Access Cost’, an accessibility indicator providing estimation in monetary terms of the impacts on mobility and on the environment of locating a single new activity in a specific zone of the urban area. In the first part of this paper, the new indicator is presented and compared to other accessibility indicators proposed in literature. In the second part, the MAAC is validated through an application to the urban area of Rome. The paper concludes with brief remarks on using the proposed accessibility indicator as index of performance for sustainable spatial planning.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. RESUMEN: La estimación rápida de costes en fases iniciales del proyecto por métodos paramétricos y referencias estadísticas es un tema bien estudiado, divulgado y aplicado en el sector de la construcción. Sin embargo, existe poca literatura técnica sobre sistemas de predimensionado de tiempos, que permitan realizar rápidamente una planificación con un grado de aproximación razonable. Este texto reúne dos aspectos ya conocidos, pero hasta ahora independientes, y una aportación propia:  -La estimación del plazo final por referencias estadísticas (BCIS, 2000)  - La estimación del reparto del coste total a lo largo de la ejecución mediante curvas "S" (diversos autores)  La estimación de la duración de la ejecución de las actividades en función de su coste. El conjunto de estas tres técnicas, aplicadas a un proyecto, permite obtener una planificación con el suficiente grado de detalle y fiabilidad para tomar decisiones en fases iniciales del proyecto.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

At head of title: Engineering and design.