890 resultados para Construction process improvement


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The current research agenda for construction process improvement is heavily influenced by the rhetoric of business process re-engineering (BPR). In contrast to the wider literature on BPR, there is little evidence of critical thought within the construction management research community. A postmodernist interpretation is advocated whereby the reality of management practice is defined by the dominant management discourse. The persuasiveness of BPR rhetoric is analysed with particular reference to the way in which it plays on the insecurity of modern managers. Despite the lip service given to ‘empowerment’ and ‘teamwork’, the dominant theme of the re-engineering movement is that of technocratic totalitarianism. From a critical perspective, it is suggested that BPR is imposed on construction organizations to ensure continued control by the industry's dominant power groups. Whilst industry leaders are fond of calling for ‘attitudinal and cultural improvement’, the language of the accepted research agenda continually reinforces the industry's dominant culture of ‘control and command’. Therefore, current research directions in process improvement perpetuate existing attitudes rather than facilitating cultural change. The concept of lean construction is seen to be the latest manifestation of this phenomenon.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Software engineering, software measurement, software process engineering, capability, maturity

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Didactic knowledge about contents is constructed through an idiosyncratic synthesis between knowledge about the subject area, students' general pedagogical knowledge and the teacher's biography. This study aimed to understand the construction process and the sources of Pedagogical Content Knowledge, as well as to analyze its manifestations and variations in interactive teaching by teachers whom the students considered competent. Data collection involved teachers from an undergraduate nursing program in the South of Brazil, through non-participant observation and semistructured interviews. Data analysis was submitted to the constant comparison method. The results disclose the need for initial education to cover pedagogical aspects for nurses; to assume permanent education as fundamental in view of the complexity of contents and teaching; to use mentoring/monitoring and the value learning with experienced teachers with a view to the development of quality teaching.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Kasvava kiinnostus ohjelmistojen laatua kohtaan on herättänyt ohjelmistoprosesseihin ja niiden kehittämiseen kohdistuvaa huomiota viime vuosina. Ohjelmistoyritykset ympäri maailmaa ovat ottaneet käyttöön ohjelmistoprosessin kehittämismalleja, kuten CMM ja SPICE, pyrkiessään kohti parempilaatuisia ohjelmistotuotteita. Samalla on huomattu, että tehokas prosessien parantaminen ja suorittaminen tarvitsee tuekseen kuvauksen prosessista, jotta prosessin perusteellinen ymmärtäminen ja kommunikointi olisi mahdollista. Ohjelmistoprosesseja voidaan kuvata monilla eri tavoilla. Prosessiopas on prosessin esitysmuoto, jonka päätarkoituksena on helpottaa prosessin ymmärtämistä ja kommunikointia. Elektroninen prosessiopas on Web-teknologiaa hyödyntävä prosessiopas. Tässä työssä luodaan kehitysympäristö elektronisille prosessioppaille, joiden tarkoituksena on tukea ohjelmistoprosessin kehittämistä ja suorittamista. Ympäristö mahdollistaa ohjelmistoprosessinmallintamisen sekä yksilöllisten oppaiden luomisen ja muokkaamisen. Kehitysympäristöä käytetään mallintamaan tietoliikenneohjelmistoja valmistavan yrityksen ohjelmistoprosessia sekä luomaan elektronisia prosessioppaita tukemaan prosessin kehitystä ja suorittamista. Lopuksi pohditaan prosessioppaiden tarjoamaa tukea sekä mahdollisuuksia kohdeyrityksessä.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Delays in the justice system have been undermining the functioning and performance of the court system all over the world for decades. Despite the widespread concern about delays, the solutions have not kept up with the growth of the problem. The delay problem existing in the justice courts processes is a good example of the growing need and pressure in professional public organizations to start improving their business process performance.This study analyses the possibilities and challenges of process improvement in professional public organizations. The study is based on experiences gained in two longitudinal action research improvement projects conducted in two separate Finnish law instances; in the Helsinki Court of Appeal and in the Insurance Court. The thesis has two objectives. First objective is to study what kinds of factors in court system operations cause delays and unmanageable backlogs and how to reduce and prevent delays. Based on the lessons learned from the case projects the objective is to give new insights on the critical factors of process improvement conducted in professional public organizations. Four main areas and factors behind the delay problem is identified: 1) goal setting and performance measurement practices, 2) the process control system, 3) production and capacity planning procedures, and 4) process roles and responsibilities. The appropriate improvement solutions include tools to enhance project planning and scheduling and monitoring the agreed time-frames for different phases of the handling process and pending inventory. The study introduces the identified critical factors in different phases of process improvement work carried out in professional public organizations, the ways the critical factors can be incorporated to the different stages of the projects, and discusses the role of external facilitator in assisting process improvement work and in enhancing ownership towards the solutions and improvement. The study highlights the need to concentrate on the critical factors aiming to get the employees to challenge their existing ways of conducting work, analyze their own processes, and create procedures for diffusing the process improvement culture instead of merely concentrating of finding tools, techniques, and solutions appropriate for applications from the manufacturing sector

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Configuration management is often seen as an enabler for the main IT Service Management (ITSM) processes such as Incident and Problem management. A decent level of quality of IT configuration data is required in order to carry out routines of these processes. This case study examines the state of configuration management in a multinational organization and aims at identification of methods for its improvement. The author has stayed five months with this company in order to collect different sources of evidence and to make observations. The main source of data for this study is interviews with some of the key employees of the assigned organization who are involved into the ITSM processes. This study concludes the maturity level of the existing configuration management process to be repeatable but intuitive, and outlines the principal requirements for its improvement. A match between the requirements identified in the organization and the requirements stated in the ISO/IEC 20000 standard indicates the possibility of adopting ITIL guidelines as a method for configuration management process improvement. The outcome of the study presents a set of recommendations for improvement that considers the process, the information model and the information system for configuration management in the case organization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The portfolio as a means of demonstrating personal skills has lately been gaining prominence among technology students. This is partially due to the introduction of electronic portfolios, or e-portfolios. As platforms for e-portfolio management with different approaches have been introduced, the learning cycle, traditional portfolio pedagogy, and learner centricity have sometimes been forgotten, and as a result, the tools have been used for the most part as data depositories. The purpose of this thesis is to show how the construction of e-portfolios of IT students can be supported by institutions through the usage of different tools that relate to study advising, teaching, and learning. The construction process is presented as a cycle based on learning theories. Actions related to the various phases of the e-portfolio construction process are supported by the implementation of software applications. To maximize learner-centricity and minimize the intervention of the institution, the evaluated and controlled actions for these practices can be separated from the e-portfolios, leaving the construction of the e-portfolio to students. The main contributions of this thesis are the implemented applications, which can be considered to support the e-portfolio construction by assisting in planning, organizing, and reflecting activities. Eventually, this supports the students in their construction of better and more extensive e-portfolios. The implemented tools include 1) JobSkillSearcher to help students’ recognition of the demands of the ICT industry regarding skills, 2) WebTUTOR to support students’ personal study planning, 3) Learning Styles to determine students' learning styles, and 4) MyPeerReview to provide a platform on which to carry out anonymous peer review processes in courses. The most visible outcome concerning the e-portfolio is its representation, meaning that one can use it to demonstrate personal achievements at the time of seeking a job and gaining employment. Testing the tools and the selected open-source e-portfolio application indicates that the degree of richness of e-portfolio content can be increased by using the implemented applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study has two main objectives. First, the phlebotomy process at the St. Catharines Site of the Niagara Health System is investigated, which starts when an order for a blood test is placed, and ends when the specimen arrives at the lab. The performance measurement is the flow time of the process, which reflects concerns and interests of both the hospital and the patients. Three popular operational methodologies are applied to reduce the flow time and improve the process: DMAIC from Six Sigma, lean principles and simulation modeling. Potential suggestions are provided for the St. Catharines Site, which could result in an average of seven minutes reduction in the flow time. The second objective addresses the fact that these three methodologies have not been combined before in a process improvement effort. A structured framework combining them is developed to benefit future study of phlebotomy and other hospital processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this study, a novel improved technology could be developed to convert the recalcitrant coir pith into environmental friendly organic manure. The standard method of composting involves the substitution of urea with nitrogen fixing bacteria viz. Azotobacter vinelandii and Azospirillum brasilense leading to the development of an improved method of coir pith. The combined action of the microorganisms could enhance the biodegradation of coir pith. In the present study, Pleurotus sajor caju, an edible mushroom which has the ability to degrade coir pith, and the addition of nitrogen fixing bacteria like Azotobacter vinelandii and Azospirillum brasilense could accelerate the action of the fungi on coir pith. The use of these microorganisms brings about definite changes in the NPK, Ammonia, Organic Carbon and Lignin contents in coir pith. This study will encourage the use of biodegraded coir pith as organic manure for agri/horti purpose to get better yields and can serve as a better technology to solve the problem of accumulated coir pith in coir based industries

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Generalized hyper competitiveness in the world markets has determined the need to offer better products to potential and actual clients in order to mark an advantagefrom other competitors. To ensure the production of an adequate product, enterprises need to work on the efficiency and efficacy of their business processes (BPs) by means of the construction of Interactive Information Systems (IISs, including Interactive Multimedia Documents) so that they are processed more fluidly and correctly.The construction of the correct IIS is a major task that can only be successful if the needs from every intervenient are taken into account. Their requirements must bedefined with precision, extensively analyzed and consequently the system must be accurately designed in order to minimize implementation problems so that the IIS isproduced on schedule and with the fewer mistakes as possible. The main contribution of this thesis is the proposal of Goals, a software (engineering) construction process which aims at defining the tasks to be carried out in order to develop software. This process defines the stakeholders, the artifacts, and the techniques that should be applied to achieve correctness of the IIS. Complementarily, this process suggests two methodologies to be applied in the initial phases of the lifecycle of the Software Engineering process: Process Use Cases for the phase of requirements, and; MultiGoals for the phases of analysis and design. Process Use Cases is a UML-based (Unified Modeling Language), goal-driven and use case oriented methodology for the definition of functional requirements. It uses an information oriented strategy in order to identify BPs while constructing the enterprise’s information structure, and finalizes with the identification of use cases within the design of these BPs. This approach provides a useful tool for both activities of Business Process Management and Software Engineering. MultiGoals is a UML-based, use case-driven and architectural centric methodology for the analysis and design of IISs with support for Multimedia. It proposes the analysis of user tasks as the basis of the design of the: (i) user interface; (ii) the system behaviour that is modeled by means of patterns which can combine Multimedia and standard information, and; (iii) the database and media contents. This thesis makes the theoretic presentation of these approaches accompanied with examples from a real project which provide the necessary support for the understanding of the used techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this study was to construct a profile of managerial competencies, based on the consensus of nurse coordinators in the field. This study was developed in a philanthropic hospital in Sao Paulo, following the research-action model, and included 13 nurse coordinators as participants. The data collection was performed using the focal group technique. Data analysis was performed using the theoretical frameworks related to the working process and managerial competencies. The results identified the greater emphasis assigned to the competencies related to the mentor, coordinator and director roles. It was, therefore, possible to construct a professional development plan that is based on competencies in the technical, ethical-political, and communicative domains, as well as the development of citizenship. The analysis of the managerial working process and the study of the competencies within the managerial environment were shown to be important, because they highlighted the professionals' need to improve, thus fulfilling personal, professional, and organizational demands.