901 resultados para CIVIL CONSTRUCTION


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current trends in workforce development indicate the movement of workers within and across occupations to be the norm. In 2009, only one in three vocational education and training (VET) graduates in Australia ended up working in an occupation for which they were trained. This implies that VET enhances the employability of its graduates by equipping them with the knowledge and competencies to work in different occupations and sectors. This paper presents findings from a Government-funded study that examined the occupational mobility of selected associate professional and trades occupations within the Aged Care, Automotive and Civil Construction sectors in Queensland. The study surveyed enrolled nurses and related workers, motor mechanics and civil construction workers to analyse their patterns of occupational mobility, future work intentions, reasons for taking and leaving work, and the factors influencing them to leave or remain in their occupations. This paper also discusses the implications of findings for the training of workers in these sectors and more generally.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates the teaching and learning of fractions to Indigenous adult learners in a Civil Construction Certificate Course. More specifically it explores why the use of materials is critical to building knowledge and understanding. This focus is important for two reasons. First, it allows for considerations of a trainer’s approach for teaching fractions and, second it provides insights into how adult learners can be supported with representing their practical experiences of fractions to make generalisation thus building on their knowledge and learning experiences. The paper draws on teaching episodes from an Australian Research Council funded Linkage project that investigates how mathematics is taught and learned in Certificate Courses, here, Certificate 11 in Civil Construction. Action research and decolonising methods (Smith, 1999) were used to conduct the research. Video excerpts which feature one trainer and three students are analysed and described. Findings from the data indicate that adult learners need to be supported with materials to assist with building their capacity to know and apply understandings of fractions in a range of contexts, besides construction. Without materials and where fractions are taught via pen and paper tasks, students are less likely to retain and apply fraction ideas to their Certificate Course. Further they are less likely to understand decimals because of limited understanding of fractions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to cooperate in minimizing the problems of the current and growing volume of waste, this work aim at the production of panels made from industrial waste -thermoplastic (polypropylene; polyethylene and acrylonitrile butadiene styrene) reinforced with agro-industrial waste - peach palm waste (shells and sheaths). The properties of the panels like density, thickness swelling, water absorption and moisture content were evaluated using the ASTM D1037; EN 317; and ANSI A208.1 standards regarding particle boards. Good results were obtained with formulations of 100% plastic waste; 70% waste plastics and 30% peach palm waste; and 60% waste plastics and 40% peach palm waste.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In order to cooperate in minimizing the problems of the current and growing volume of waste, this work aims at the production of panels made from industrial waste -thermoplastic (Polypropylene - PP; Polyethylene - PE and Acrylonitrile Butadiene Styrene - ABS) reinforced with agro-industrial waste - pupunha palm waste (shells and sheaths). The properties of the panels were evaluated: density, thickness swelling, water absorption and moisture content. It was used the ASTM D1037; EN 317; and ANSI A208.1 standards regarding particle boards. The best results in physical tests were treatments 1 (100% waste plastic), 6 (60% plastic waste and 40% waste of pupunha) and 7 (70% waste plastic and 30% waste of pupunha). The best results in the mechanical tests were treatments 3 (30% de residuos plasticos e 70% de residuos da pupunha), 4 (40% de residuos plasticos c 60% de residuos da pupunha) and 5 (50% de residuos plasticos e 50% de residuos da pupunha). For mechanical tests it was concluded that the results of modulus of rupture and of modulus of elasticity the best treatments were those with more fibers. In the tensile tests perpendicular to the surface, it is clear that using more waste plastics leads to the best results. It was concluded that the waste can be used as raw material for the production of alternative materials mainly in civil construction and furniture industries, and it can be employed in urban or rural environment, given the concept of eco-efficient products.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The common point between the two forms of production of the wood-based sector in Brazil, one practically manufacturing and the other high technology, is in the qualification of the of the labor. In both cases, the professionals are being formed directly in the productive line and rarely with qualification in the academic area. There is not a public political education for the qualification of the labor, and the work market that does not demand qualified professionals, contributes for the sector stagnation. So, in order to excel the socio-cultural barriers in relation to the use of wood in the buildings, new attitudes are necessary in the teaching of the contents of the curricular programs, mainly, in formation of the architect and civil engineering.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The use of bamboo as construction and raw material for producing products can be considered a feasible alternative to the abusive use of steel, concrete and oil byproducts. Its use can also reduce the pressure on the use of wood from native and planted forests. Although there are thousands of bamboo species spread about the world and Brazil itself has hundreds of native species, the use and basic knowledge of its characteristics and applications are still little known and little disseminated. This paper's main objective is to introduce the species, the management phases, the physical and mechanical characteristics and the experiences in using bamboo in design and civil construction as per the Bamboo Project implemented at UNESP, Bauru campus since 1994. The results are divided into: a) Field activities - description of the technological species of interest, production chain flows, types of preservative treatments and clump management practices for the development, adaptation and production of different species of culms; b) Lab experiments - physical and mechanical characterization of culms processed as laminated strips and as composite material (glue laminated bamboo – glubam); c) Uses in projects - experiences with natural bamboo and glubam in design, architecture and civil construction projects. In the final remarks, the study aims to demonstrate, through practical and laboratory results, the material's multi-functionality and the feasibility in using bamboo as a sustainable material.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to describe the construction workers' activities, as well as their perceptions about risks and workload. The study, based on the Collective Work Analysis, is part of a broader public policies project for the improvement of SIVAT (Surveillance System of Work Accidents) - in the city of Piracicaba (Southeastern Brazil). Civil construction was prioritized given the epidemiological magnitude of the occurrence of work accidents and the limited efficacy of traditional surveillance initiatives in this sector due to informal employment practices, outsourcing, high staff turnover, etc. The workers have a high level of awareness concerning the risk of accidents, but they believe that the main preventive measures hinder or even make it impossible for them to carry out the tasks. Our findings question the efficacy of traditional training for adherence to safety practices, thus highlighting the need for a transformative pedagogy for preventive practices and the health promotion of workers.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Purpose Traditional construction planning relies upon the critical path method (CPM) and bar charts. Both of these methods suffer from visualization and timing issues that could be addressed by 4D technology specifically geared to meet the needs of the construction industry. This paper proposed a new construction planning approach based on simulation by using a game engine. Design/methodology/approach A 4D automatic simulation tool was developed and a case study was carried out. The proposed tool was used to simulate and optimize the plans for the installation of a temporary platform for piling in a civil construction project in Hong Kong. The tool simulated the result of the construction process with three variables: 1) equipment, 2) site layout and 3) schedule. Through this, the construction team was able to repeatedly simulate a range of options. Findings The results indicate that the proposed approach can provide a user-friendly 4D simulation platform for the construction industry. The simulation can also identify the solution being sought by the construction team. The paper also identifies directions for further development of the 4D technology as an aid in construction planning and decision-making. Research limitations/implications The tests on the tool are limited to a single case study and further research is needed to test the use of game engines for construction planning in different construction projects to verify its effectiveness. Future research could also explore the use of alternative game engines and compare their performance and results. Originality/value The authors proposed the use of game engine to simulate the construction process based on resources, working space and construction schedule. The developed tool can be used by end-users without simulation experience.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Os RCC são originados dos diversos processos da construção civil, com características bastante particulares pela variedade dos métodos construtivos empregados. Suas deposições em locais inadequados causam vários impactos com diferentes tempos de reação e de degradação do meio ambiente. Para impedi-los foi aprovada a Resolução 307 do CONAMA, que estabelece critérios e normas de caráter protetor ao meio ambiente, porém as administrações públicas possuem inúmeras dificuldades técnicas e financeiras para sua implementação. Para auxiliar os municípios, a CEF elaborou dois manuais de orientações para o manejo e gestão dos RCC, direcionando o sistema gestor. Uma opção para a gestão de RCC é a reciclagem. O Município do Rio de Janeiro com seu relevo original formado por mangues e morros, sofreu grandes aterros e sofre até os dias atuais, utilizando para isso os RCC e o desmonte de antigos morros. Os RCC, após coletados, são destinados a uma única Área de Transbordo e Triagem, com capacidade insuficiente para recebê-los. A ausência de controle do órgão gestor sobre os RCC, seus dados de produção e de destinação, exige uma estimativa dos RCC gerados no Município e uma observação global sobre seus destinos, considerando os aterros autorizados pela SMAC. Foi realizada uma análise crítica da gestão corretiva adotada pelo sistema gestor, suas particularidades e dificuldades, e o perfil atual sobre a reciclagem de RCC no Rio de Janeiro. Algumas propostas para a melhoria do sistema gestor foram apresentadas e sugerida a necessidade de um estudo mais aprofundado e de um levantamento mais completo da realidade dos RCC no Município do Rio de Janeiro.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A presente pesquisa tem por objetivo propor e estruturar uma ferramenta de apoio gerencial que efetive a Gerência do processo Construção Civil ao nível da Obra. Para tanto, analisou-se como se desenvolve a Gerência: Planejamento, Programação e Controle. A partir daí modelou-se o processo Construção Civil como processo produtivo. A consideração, no contexto da Construção civil, das citadas três etapas da Gerência, juntamente com a consideração de conceitos atualizados sobre Sistemas de Informações Gerenciais nortearam a proposição, o projeto e a implementação de um Sistema de Informações para o Gerenciamento de Obras - SIGOB. O sistema proposto é apresentado em detalhes neste trabalho.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A escolha do tema ficou circunscrita ao subsetor de construção habitacional, que é caracterizado pela presença de pequenas e médias empresas. A consolidação de grandes empresas neste ramo de atividades tende a ocorrer sobretudo em conjunturas onde através da intervenção estatal são definidos programas habitacionais de grande escala que requerem das empresas participantes de maior volume de capital e o acesso a tecnologias mais sofisticadas. A importância da pequena empresa neste ramo de atividades pode ser notada atraves da experiência dos países da Comunidade Econômica Europeia, que em 1985 de um total de mais de um milhão de empresas de construção, 90% tinham até 10 empregados. Igual situação se verifica nos Estados Unidos da América onde conforme dados de 1965, também 90 % das 875.000 empresas então existentes no país empregavam menos de 10 pessoas (ONU, 1987). De uma maneira geral a importância do tema fica evidente quando se analisa o peso do setor da construção civil na economia nacional, que se situa em torno de 5% do PIB nos países industrializados, enquanto que nos países de industrialização recente, este percentual pode atingir o índice de 7% (PNU, op.cit.). Tal constatação evidencia que a indústria da construção representa o principal item na composição dos investimentos (formação bruta de capital fixo) das contas nacionais de diversos países, apresentando uma participação relativa quase sempre superior a 55% nos países industrializados e 60% nos países de industrialização recente (ONU, op.cit.). No Brasil tal importância se confirma pelo valor adicionado do setor habitacional correspondente a 2,2% do PIB, e numa visão mais abrangente, dentro dos contornos da indústria da construção civil como um todo, representando cerca de 7,3% do PIB (FIBGE, 1988). Quanto a questão da mão-de-obra, em que pese a ausência de dados no Brasil, e bastante visível sua larga influência na economia atuando como um ramo de atividades multiplicador de alocação de pessoal, principalmente a nível de utilização intensiva de mão-de-obra menos qualificada. Enquanto nos EEUU e CEE 90% das empresas constituíam-se de organizações com menos de 10 empregados, no Brasil onde há ausência de dados oficiais a respeito, na pior das hipóteses pode-se estimar que este percentual pode variar entre 50 a 70% do total de empresas, o que não deixa de ser um dado de extrema magnitude. Foram exatamente a expressão destes números, sem considerar o déficit habitacional em torno de 10 milhões de pessoas, um terço da população, moram em condições inadequadas (Exame, 1991), que influenciaram fortemente a escolha do tema da presente proposta de Tese.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This dissertation seeks to identify specifications bu which the Subsection cf Buildings c f the Civil Construction os Rio de Janeiro could be improved. It attempt to determine the factors that make construction workers both victims of accidents, as well as the cause of these accidents. It a150 seeks t o identify the means af the capitalist way that as the producer specific kind af society, creates this type af invisible of a worker. Further more, to verify the violent ar disguised ways, that lead the worker to have a guilty consclence relative to himself and to the other workers , and maklng him feel responsible even for accident - related deaths on the job. A revolting factor is that malnutrition and endemic hunger, are in large part responsible for accidents at work in the capitalist production system, ln which production relations are still primitive. Therefore, the accidents at work are a product of society, especially caused by conditions in the construction sector . This fac 19 often masked, and responsibility is put on the worker ln 77,5~ of work related accident . Under these specific working conditions the cumulative overtime hours of work and tasks make the rythm and working hours extreme and overburdensome. The large and modern firms subcantract to smoller construc~i ns firms who have more dangeraus working condictions which result in more frequent and mayor accidents. These are not computed in the statistics of the large firms and the workers of the subcontractors do not appear on the builging construction lists, and are therefore a non - existent entities. Even opressed, the workers still continue to work under these conditions mak1ng there resistence a form af struggle. The Education that intends to be transformed in to an instrument of the workers struggle, should stimulated the participation in the daily educational and political practices and try to reconstructed what the dominant knowledge has fragmented: the ptoduction of existence as an integrated whole.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Este estudo está inserido num tópico que têm recebido muita atenção por parte da literatura financeira atualmente, principalmente porque, a partir da publicação da lei 11 .308 de 13 de julho de 2007, tomou obrigatorio a puplicação da demonstração do fluxo de caixa, em substituíçaõ da à demonstração das origens e aplicação dos recursos. O fluxo de caixa deve ser tratado como um grande instrumento gerencial que permite identificar a maneira como o dinheiro circula na empresa, ou seja identifica qual é o grau de liquidez, mostrando a posição financeira da empresa de maneira a estabelecer tendências sobre as eventuais sobras ou falta de recursos. A finalidade do fluxo de caixa realizado é mostrar como se comportaram as entradas e as saídas de recursos financeiros da empresa em detenninado penodo. O estudo cuidadoso do fluxo de caIxa realizado, além de propicIar análise de tendência, serve de base para o planejamento do fluxo projetado. O objetivo principal do estudo é fazer uma análise do volume de perdas financeiras ao longo do período compreendido entre 1996 a 2008. As perdas financeiras que nos referimos, ocorreram devido ao atraso de pagamento por parte do cliente gerando a necessidade de aumento do capital de giro, causado pela grande diferença de prazo entre o ciclo de caixa projetado (ideal) comparado ao ciclo de caixa real. O presente trabalho foi realizado em uma empresa de grande porte no setor da construção civil. O trabalho realizado foi o de comparar o ciclo de caixa planejado versus o ciclo de caixa real, determinando assim o montante de perdas financeiras que foi de R$ 48,46 milhões de reais atualizados para o final do período analisado, representando uma redução da rentabilidade em 3,26%. Palavras-chave: Fluxo de caixa. Capital de giro. Ciclo de caixa projetado. Ciclo de caixa real.