999 resultados para 671102 Rail equipment


Relevância:

100.00% 100.00%

Publicador:

Resumo:

"March 1970."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The growth behaviour of the vibrational wear phenomenon known as rail corrugation is investigated analytically and numerically using mathematical models. A simplified feedback model for wear-type rail corrugation that includes a wheel pass time delay is developed with an aim to analytically distil the most critical interaction occurring between the wheel/rail structural dynamics, rolling contact mechanics and rail wear. To this end, a stability analysis on the complete system is performed to determine the growth of wear-type rail corrugations over multiple wheelset passages. This analysis indicates that although the dynamical behaviour of the system is stable for each wheel passage, over multiple wheelset passages, the growth of wear-type corrugations is shown to be the result of instability due to feedback interaction between the three primary components of the model. The corrugations are shown analytically to grow for all realistic railway parameters. From this analysis an analytical expression for the exponential growth rate of corrugations in terms of known parameters is developed. This convenient expression is used to perform a sensitivity analysis to identify critical parameters that most affect corrugation growth. The analytical predictions are shown to compare well with results from a benchmarked time-domain finite element model. (C) 2004 Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Rail corrugation consists of undesirable periodic fluctuations in wear on railway track and costs the railway industry substantially for it's removal by regrinding. Much research has been performed on this problem, particularly over the past two decades, however, a reliable cure remains elusive for wear-type corrugations. Recently the growth behaviour of wear-type rail corrugation-has been investigated using theoretical and experimental models as part of the RailCRC Project (#18). A critical part of this work is the tuning and validation of these models via an extensive field testing program. Rail corrugations have been monitored for 2 years on sites throughout Australia. Measured rail surface profiles are used to determine corrugation growth rates on each site. Growth rates and other characteristics are compared with theoretical predictions from a computer model for validation. The results from several pertinent sites are presented and discussed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Federal Railroad Administration, Office of Research and Development, Washington, D.C.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Federal Railroad Administration, Office of Research and Development, Washington, D.C.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Federal Railroad Administration, Office of Research and Development, Washington, D.C.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Federal Railroad Administration, Office of Research and Development, Washington, D.C.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

L'elaborato è il risultato del progetto di tesi svolto presso l’azienda Lift Truck Equipment L.T.E. di Ostellato (Ferrara) che opera nell’ambito della progettazione e produzione di gruppi di sollevamento ed attrezzature per carrelli elevatori all’interno del gruppo Toyota Material Handling. Il progetto è stato svolto nel periodo da gennaio a marzo 2016 in collaborazione con l’ufficio di Ingegneria di processo di L.T.E. e riguarda l’applicazione del metodo MAGEC (Modi e Analisi dei Guasti e delle Criticità) per l’analisi dei guasti di una linea produttiva dell’azienda, la Rail Line. Nel primo capitolo viene inquadrato il sistema produttivo dell’azienda in aderenza con la filosofia del TPS (Toyota Production System) per chiarire l’ambito in cui è nato il progetto, le motivazioni che hanno portato al suo sviluppo e l’ottica secondo cui è stato svolto. Nel secondo capitolo è fornita una descrizione dell’approccio utilizzato, che consiste in una variante della FMECA, il metodo più utilizzato per le analisi in ambito affidabilistico. Inoltre sono riportate le attività di pianificazione che sono state svolte preliminarmente all’inizio del progetto. Successivamente nel terzo capitolo sono illustrati in modo dettagliato i vari step dell’implementazione del metodo, dalla raccolta dati, effettuata presso l’azienda, all’elaborazione. L’ultimo capitolo è dedicato ai risultati dell’analisi e a una breve descrizione di come tali risultati sono stati utilizzati nelle attività di manutenzione preventiva.