6 resultados para variable structure system
em Archive of European Integration
Resumo:
The structure of the Russian army’s personnel has undergone a major transformation in recent years. The Armed Forces are no longer a downsized continuation of the Soviet-era mass army, but are gradually becoming a de facto professional army in which conscription, now employed on a diminishing scale, will primarily constitute a first step towards a continued professional military career. The cornerstone for the process of professionalisation has been laid by a personnel reform which cut the number of officer posts by nearly half and considerably restricted the recruitment of new officers, thus restoring traditional proportions to the structure of the officer corps. The plans to ultimately implement a manning system based predominantly on contract service are a natural consequence of these changes. The ongoing professionalisation of the Russian Armed Forces should be treated as a conscious effort which is mainly necessitated by global trends: despite the demographic changes taking place, Russia could still maintain an army with a declared strength of one million soldiers, most of them conscripts.
Resumo:
To shift to a low-carbon economy, the EU has been encouraging the deployment of variable renewable energy sources (VRE). However, VRE lack of competitiveness and their technical specificities have substantially raised the cost of the transition. Economic evaluations show that VRE life-cycle costs of electricity generation are still today higher than those of conventional thermal power plants. Member States have consequently adopted dedicated policies to support them. In addition, Ueckerdt et al. (2013) show that when integrated to the power system, VRE induce supplementary not-accounted-for costs. This paper first exposes the rationale of EU renewables goals, the EU targets and current deployment. It then explains why the LCOE metric is not appropriate to compute VRE costs by describing integration costs, their magnitude and their implications. Finally, it analyses the consequences for the power system and policy options. The paper shows that the EU has greatly underestimated VRE direct and indirect costs and that policymakers have failed to take into account the burden caused by renewable energy and the return of State support policies. Indeed, induced market distortions have been shattering the whole power system and have undermined competition in the Internal Energy Market. EU policymakers can nonetheless take full account of this negative trend and reverse it by relying on competition rules, setting-up a framework to collect robust EU-wide data, redesigning the architecture of the electricity system and relying on EU regulators.