4 resultados para transmission networks
em Archive of European Integration
Resumo:
Initiated in May 2011, several months after the Fukushima nuclear disaster, Germany’s energy transformation (Energiewende) has been presented as an irrevocable plan, and – due to the speed of change required – it represents a new quality in Germany’s energy strategy. Its main objectives include: nuclear energy being phased out by 2022, the development of renewable energy sources (OZE), the expansion of transmission networks, the construction of new conventional power plants and an improvement in energy efficiency.The cornerstone of the strategy is the development of renewable energy. Under Germany's amended renewable energy law, the proportion of renewable energy in electricity generation is supposed to increase steadily from the current level of around 20% to approximately 38% in 2020. In 2030, renewable energy is expected to account for 50% of electricity generation. This is expected to increase to 65% in 2040 and to as much as 80% in 2050. The impact of the Energiewende is not limited to the sphere of energy supplies. In the medium and long term, it will change not only to the way the German economy operates, but also the functioning of German society and the state. Facing difficulties with the expansion of transmission networks, the excessive cost of building wind farms, and problems with the stability of electricity supplies, especially during particularly cold winters, the federal government has so far tended to centralise power and limit the independence of the German federal states with regard to their respective energy policies, justifying this with the need for greater co-ordination. The Energiewende may also become the beginning of a "third industrial revolution", i.e. a transition to a green economy and a society based on sustainable development. This will require a new "social contract" that will redefine the relations between the state, society and the economy. Negotiating such a contract will be one of the greatest challenges for German policy in the coming years.
Resumo:
One year after the events of Fukushima the implementation of the new German energy strategy adopted in the summer of 2011 is being verified. Business circles, experts and publicists are sounding the alarm. The tempo at which the German economy is being rearranged in order that it uses renewable energy sources is so that it has turned out to be an extremely difficult and expensive task. The implementation of the key guidelines of the new strategy, such as the development of the transmission networks and the construction of new conventional power plants, is meeting increasing resistance in the form of economic and legal difficulties. The development of the green technologies sector is also posing problems. The solar energy industry, for example, is excessively subsidised, whereas the subsidies for the construction of maritime wind farms are too low. At present, only those guidelines of the strategy which are evaluated as economically feasible by investors or which receive adequate financial support from the state have a chance of being carried through. The strategy may also turn out to be unsuccessful due to the lack of a comprehensive coordination of its implementation and the financial burden its introduction entails for both the public and the economy. In the immediate future, the German government will make efforts not only to revise its internal regulations in order to enable the realisation of the energy transformation; it is also likely to undertake a number of measures at the EU forum which will facilitate this realisation. One should expect that the German government will actively support the financing of both the development of the energy networks in EU member states and the development of renewable energy sources in the energy sector.
Resumo:
Since taking power in 2009, the Alliance for European Integration (AIE) has been trying to end Moldova’s dependence on Russian gas. Currently, natural gas accounts for about 50% of the country’s energy balance (excluding Transnistria), and Gazprom has a monopoly on the supply of gas to the republic. The key element of Chișinău’s diversification project is the construction of the Iasi-Ungheni pipeline, which is designed to link the Moldovan and Romanian gas transmission networks, and consequently make it possible for Moldova to purchase gas from countries other than Russia. Despite significant delays, construction work on the interconnector began in August 2013. The Moldovan government sees ensuring energy independence from Russia as its top priority. The significance and urgency of the project reflect Chișinău’s frustration at Moscow’s continued attempts to use its monopoly of Moldova’s energy sector to exert political pressure on the republic. Nonetheless, despite numerous declarations by Moldovan and Romanian politicians, the Iasi- -Ungheni pipeline will not end Moldova’s dependence on Russian gas before the end of the current decade. This timeframe is unrealistic for two reasons: first, because an additional gas pipeline from Ungheni to Chisinau and a compression station must be constructed, which will take at least five years and will require significant investment; and second, because of the unrelenting opposition to the project coming from Gazprom, which currently controls Moldova’s pipelines and will likely try to torpedo any energy diversification attempts. Independence from Russian gas will only be possible after the the Gazprom-controlled Moldova-GAZ, the operator of the Moldovan transmission network and the country’s importer of natural gas, is divided. The division of the company has in fact been envisaged in the EU’s Third Energy Package, which is meant to be implemented by Moldova in 2020.