3 resultados para tender

em Archive of European Integration


Relevância:

10.00% 10.00%

Publicador:

Resumo:

From the Introduction. This contribution will focus on the core question if, how and to what extent the EU procurement rules and principles (may) affect the national health care systems. We start our analysis by summarizing the applicable EU public procurement legislation, principles and soft law and its exact scope in relation to health care. (section 2). Subsequently, we turn to the parties in a contract, subject to procurement rules in the field of health care, addressing both the definition of contracting authorities and relevant case law (section 3). This will then lead to an analysis of possible justifications for not holding a tender procedure in the field of health care (section 4). Finally, we illustrate the impact of EU public procurement rules on health care by analysing a Dutch case study, in which the question whether public hospitals in the Netherlands qualify as contracting authorities in terms of the Public Sector Directive stood central (section 5). Our conclusions will follow in section 6.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sufficient cross‐border electricity transmission infrastructure is a pre‐requisite for a functioning European internal market for electricity. Also, the achievement of the EU’s energy policy objectives – sustainability, competitiveness and security of supply – critically depends on adequate investment in physical interconnections between the member states. Mainly focusing on the “regulatory path”, this paper assesses different ways to achieve a sufficient level of interconnector investment. In a first step, economic analysis identifies numerous impediments to interconnector investment adding up to an “interconnector investment failure”. Reflecting on the proper regulatory design of an EU framework able to overcome the interconnector investment failure, a number of recommendations are put forward:  All congestion rents should be channeled into interconnector building. Unused rents should be transferred to a European interconnector fund supervised by an EU agency.  Even though inherently sub‐optimal, merchant transmission investment can be used as a means to put pressure on regulated transmission system operators (TSO) that do not deliver. An EU agency should have exclusive competence on merchant interconnector exemptions.  A European TSO organization should be entrusted with supra‐national network planning, supervised by an EU agency.  The agency should decide on investment cost reallocation for interconnector projects that yield strong externalities. Payments could be settled via a European interconnector fund.  In case of non‐compliance with the supra‐national network plan, the EU agency should have the right to organize a tender – financed by the European interconnector fund – in order to get the “missing link” built. Assessing the existing EU regulatory framework, the efforts of the 2009 “third energy package” to fill the “regulatory gap” with new EU bodies – ACER and ENTSO‐E – are acknowledged. However, striking holes in regulatory framework are spotted, notably with regard to the use of congestion rents, interconnector cost allocation, and the distribution of decision making powers on new infrastructure exemptions A discussion of the TEN‐E interconnector funding scheme shows that massive funding can be an interim solution to the problem of insufficient interconnection capacities while overcoming the political deadlock on sensible regulatory topics such as interconnector cost allocation. The paper ends with policy recommendations.