4 resultados para Electrical power system stability

em Archive of European Integration


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hosni Mubarak’s regime and its power system enjoyed remarkable stability for over 30 years. On 11 February 2011, after 18 days of mass protests, the Egyptian president was forced to step down, revealing the unsustainability of the political and economic system that had ensured his continuity for so long. While the revolution of January 25th led to a major success – the fall of Hosni Mubarak – Egypt’s political future is still opaque and exposed to a number of risks. This paper first highlights the factors underpinning the former stability of Mubarak’s regime; it then assesses the causes of its underlying unsustainability, leading to the anti-government popular mobilisation in January-February 2011 and the removal of Mubarak; finally the paper evaluates the prospects for a genuine democratic transition in Egypt, by looking at the main political and socio-economic challenges facing the country.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Summary. The transformation of Germany’s energy sector will further exacerbate current network fluctuations and intensify the need for modifications in Europe’s power system. Cross-border power transfers will have to increase in order to overcome national limitations for absorbing large volumes of intermittent renewables like wind and solar power. In order to establish such an infrastructure on a European scale, the energy transition needs to be guided by an economic approach designed to prevent further fractures in the Internal Electricity Market. Moreover, constructive negotiations with neighbouring countries on market designs and price signals will be important preconditions for a successful energy transition in Europe.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To shift to a low-carbon economy, the EU has been encouraging the deployment of variable renewable energy sources (VRE). However, VRE lack of competitiveness and their technical specificities have substantially raised the cost of the transition. Economic evaluations show that VRE life-cycle costs of electricity generation are still today higher than those of conventional thermal power plants. Member States have consequently adopted dedicated policies to support them. In addition, Ueckerdt et al. (2013) show that when integrated to the power system, VRE induce supplementary not-accounted-for costs. This paper first exposes the rationale of EU renewables goals, the EU targets and current deployment. It then explains why the LCOE metric is not appropriate to compute VRE costs by describing integration costs, their magnitude and their implications. Finally, it analyses the consequences for the power system and policy options. The paper shows that the EU has greatly underestimated VRE direct and indirect costs and that policymakers have failed to take into account the burden caused by renewable energy and the return of State support policies. Indeed, induced market distortions have been shattering the whole power system and have undermined competition in the Internal Energy Market. EU policymakers can nonetheless take full account of this negative trend and reverse it by relying on competition rules, setting-up a framework to collect robust EU-wide data, redesigning the architecture of the electricity system and relying on EU regulators.