2 resultados para Minor surgical procedures
em Coffee Science - Universidade Federal de Lavras
Resumo:
Interacting with a computer system in the operating room (OR) can be a frustrating experience for a surgeon, who currently has to verbally delegate to an assistant every computer interaction task. This indirect mode of interaction is time consuming, error prone and can lead to poor usability of OR computer systems. This thesis describes the design and evaluation of a joystick-like device that allows direct surgeon control of the computer in the OR. The device was tested extensively in comparison to a mouse and delegated dictation with seven surgeons, eleven residents, and five graduate students. The device contains no electronic parts, is easy to use, is unobtrusive, has no physical connection to the computer and makes use of an existing tool in the OR. We performed a user study to determine its effectiveness in allowing a user to perform all the tasks they would be expected to perform on an OR computer system during a computer-assisted surgery. Dictation was found to be superior to the joystick in qualitative measures, but the joystick was preferred over dictation in user satisfaction responses. The mouse outperformed both joystick and dictation, but it is not a readily accepted modality in the OR.
Resumo:
The Development Permit System has been introduce with minimal directives for establishing a decision making process. This is in opposition to the long established process for minor variances and suggests that the Development Permit System does not necessarily incorporate all of Ontario’s fundamental planning principles. From this concept, the study aimed to identify how minor variances are incorporated into the Development Permit System. In order to examine this topic, the research was based around the following research questions: • How are ‘minor variance’ applications processed within the DPS? • To what extent do the four tests of a minor variance influence the outcomes of lower level applications in the DPS approval process? A case study approach was used for this research. The single-case design employed both qualitative and quantitative research methods including a review of academic literature, court cases, and official documents, as well as a content analysis of Class 1, 1A, and 2 Development Permit application files from the Town of Carleton Place that were decided between 2011 and 2015. Upon the completion of the content analysis, it was found that minor variance issues were most commonly assigned to Class 1 applications. Planning staff generally met approval timelines and embraced their delegated approval authority, readily attaching conditions to applications in order to mitigate off-site impacts. While staff met the regulatory requirements of the DPS, ‘minor variance’ applications were largely decided on impact alone, demonstrating that the principles established by the four tests, the defining quality of the minor variance approval process, had not transferred to the Development Permit System. Alternatively, there was some evidence that the development community has not fully adjusted to the requirements of the new approvals process, as some applications were supported using a rationale containing the four tests. Subsequently, a set of four recommendations were offered which reflect the main themes established by the findings. The first two recommendations are directed towards the Province, the third to municipalities and the fourth to developers and planning consultants: 1) Amend Ontario Regulation 608/06 so that provisions under Section 4(3)(e) fall under Section 4(2). 2) Change the rhetoric from “combining elements of minor variances” to “replacing minor variances”. 3) Establish clear evaluation criteria. 4) Understand the evaluative criteria of the municipality in which you are working.