5 resultados para power system reliability
em Scielo Saúde Pública - SP
Resumo:
ABSTRACT The successful in the implementation of wind turbines depends on several factors, including: the wind resource at the installation site, the equipment used, project acquisition and operational costs. In this paper, the production of electricity from two small wind turbines was compared through simulation using the computer software HOMER - a national model of 6kW and an imported one of 5kW. The wind resources in three different cities were considered: Campinas (SP/BR), Cubatão (São Paulo/BR) and Roscoe (Texas/ USA). A wind power system connected to the grid and a wind isolated system - batteries were evaluated. The results showed that the energy cost ($/kWh) is strongly dependent on the windmill characteristics and local wind resource. Regarding the isolated wind system – batteries, the full supply guarantee to the simulated electrical load is only achieved with a battery bank with many units and high number of wind turbines, due to the intermittency of wind power.
Resumo:
The impact of a power plant cooling system in the Bahía Blanca estuary (Argentina) on the survival of target zooplanktonic organisms (copepods and crustacean larvae) and on overall mesozooplankton abundance was evaluated over time. Mortality rates were calculated for juveniles and adults of four key species in the estuary: Acartia tonsa Dana, 1849 and Eurytemora americana Williams, 1906 (native and invading copepods), and larvae of the crab Chasmagnathus granulata Dana, 1851 and the invading cirriped Balanus glandula Darwin, 1854. Mean total mortality values were up to four times higher at the water discharge site than at intake, though for all four species, significant differences were only registered in post-capture mortality. The findings show no evidence of greater larval sensitivity. As expected, the sharpest decrease in overall mesozooplankton abundance was found in areas close to heated water discharge.
Resumo:
OBJECTIVE To analyze the scientific production about the validity and reliability of the Manchester Triage System (MTS) protocol. METHOD A descriptive study of an integrative literature review. Articles on the validity and reliability of the MTS developed with children and adults published between 1999 and 2013 were included. RESULTS 14 articles were selected from a total of 8438, nine of validity and five of reliability. The reliability of the MTS ranged from moderate to almost perfect, with higher intra-evaluation. Regarding validity, the results seem to point to equivalent and satisfactory sensibility and specificity levels of the MTS. The instrument proved to be a good predictor of the need for hospitalization and of hospital mortality. CONCLUSION The reliability and validity of the MTS obtained in the studies is varied. It is recommended that new studies indicate necessary modifications to the MTS so that it is more safely used by nurses.
Resumo:
Utilizing China's leadership projects in the Great Mekong Sub-Region (GMS) as a case study, this paper aims to investigate whether China qualifies as an international leader. This work argues that its geographic position and economic rise allow China to be a "system maker and privilege taker," which is a dual role forming in economic-political relations in the GMS in the last ten years. China is among major driving forces to set up an economic zone in GMS. Growing Chinese regional power is intimately related to the creation of various hubs connecting regional transportation, communication and energy systems that foster the economic development of this region. However, China also proves dark sides of rising powers which take advantage of their privileges to gain benefits. As a "system maker" with its own position and capability, China has notably benefited from building hydropower systems. More importantly, while China is pursuing its benefits and privileges, its hydropower projects have caused some negative effects for the ecosystem in the region. The inflation of dam constructions in both China and GMS countries is raising concerns about using natural resources of the Mekong River. Our concluding part addresses the pressing need to start a serious discussion on the balance between national interests and regional solidarity within the formulation of Chinese foreign policy in GMS.
Resumo:
OBJECTIVE To evaluate the validity and reliability of an instrument that evaluates the structure of primary health care units for the treatment of tuberculosis.METHODS This cross-sectional study used simple random sampling and evaluated 1,037 health care professionals from five Brazilian municipalities (Natal, state of Rio Grande do Norte; Cabedelo, state of Paraíba; Foz do Iguaçu, state of Parana; Sao José do Rio Preto, state of Sao Paulo, and Uberaba, state of Minas Gerais) in 2011. Structural indicators were identified and validated, considering different methods of organization of the health care system in the municipalities of different population sizes. Each structure represented the organization of health care services and contained the resources available for the execution of health care services: physical resources (equipment, consumables, and facilities); human resources (number and qualification); and resources for maintenance of the existing infrastructure and technology (deemed as the organization of health care services). The statistical analyses used in the validation process included reliability analysis, exploratory factor analysis, and confirmatory factor analysis.RESULTS The validation process indicated the retention of five factors, with 85.9% of the total variance explained, internal consistency between 0.6460 and 0.7802, and quality of fit of the confirmatory factor analysis of 0.995 using the goodness-of-fit index. The retained factors comprised five structural indicators: professionals involved in the care of tuberculosis patients, training, access to recording instruments, availability of supplies, and coordination of health care services with other levels of care. Availability of supplies had the best performance and the lowest coefficient of variation among the services evaluated. The indicators of assessment of human resources and coordination with other levels of care had satisfactory performance, but the latter showed the highest coefficient of variation. The performance of the indicators “training” and “access to recording instruments” was inferior to that of other indicators.CONCLUSIONS The instrument showed feasibility of application and potential to assess the structure of primary health care units for the treatment of tuberculosis.