6 resultados para Train scheduling
em Scielo Saúde Pública - SP
Resumo:
OBJECTIVE: Contribution to the discussion of the role of participation/consent of employees in working hours regulation. METHODS: Exploratory analysis of conflicts between preferences of employees and ergonomic recommendations in shift scheduling by analysing a large number of participative shift scheduling projects. RESULTS: The analysis showed that very often the pursuit of higher income played the major role in the decision making process of employees and employees preferred working hours in conflict with health and safety principles. CONCLUSIONS: First, the consent of employees or the works council alone does not ensure ergonomically sound schedules. Besides consent, risk assessment procedures seem to be a promising but difficult approach. Secondly, more research is necessary to check the applicability of recommendations under various settings, to support the risk assessment processes and to improve regulatory approaches to working hours.
Resumo:
In order to establish guidelines for irrigation water management of banana cv. Pacovan (AAB group, Prata sub-group) in Petrolina County, northeastern Brazil, the root distribution and activity were measured on an irrigated plantation, in a medium texture soil, with plants spaced in a 3 x 3 m grid. Root distribution was evaluated by the soil profile method aided by digital image analysis, while root activity was indirectly determined by the changing of soil water content and by the direction of soil water flux. Data were collected since planting in January 1999 to the 3rd harvest in September 2001. Effective rooting depth increased from 0.4 m at 91 days after planting (dap), to 0.6 m at 370, 510, and 903 dap, while water absorption by roots was predominantly in the top 0,6 m.
Resumo:
The water consumption and the crop coefficient of the banana cv. Pacovan were estimated in Petrolina County, northeastern Brazil, in order to establish guidelines to irrigation water management. Evaluations were carried out since planting in January 1999 to the 3rd harvest in September 2001 on a microsprinkler irrigated orchard, with plants spaced in a 3 x 3 m grid. Average daily water consumption was 3.9, 4.0, and 3.3 mm in the 1st, 2nd and 3rd growing seasons, respectively. Crop coefficient values increased from 0.7 (vegetative growth) to 1.1 (flowering). Even with high soil water availability, transpiration was reduced due to high evaporative demand.
Resumo:
The objective of this study was to verify the potential of SNAP III (Scheduling and Network Analysis Program) as a support tool for harvesting and wood transport planning in Brazil harvesting subsystem definition and establishment of a compatible route were assessed. Initially, machine operational and production costs were determined in seven subsystems for the study area, and quality indexes, construction and maintenance costs of forest roads were obtained and used as SNAP III program input data. The results showed, that three categories of forest road occurrence were observed in the study area: main, secondary and tertiary which, based on quality index, allowed a medium vehicle speed of about 41, 30 and 24 km/hours and a construction cost of about US$ 5,084.30, US$ 2,275.28 and US$ 1,650.00/km, respectively. The SNAP III program used as a support tool for the planning, was found to have a high potential tool in the harvesting and wood transport planning. The program was capable of defining efficiently, the harvesting subsystem on technical and economical basis, the best wood transport route and the forest road to be used in each period of the horizon planning.
Resumo:
OBJECTIVE: To extend an existing computer programme for the evaluation and design of shift schedules (BASS 3) by integrating workload as well as economic aspects. METHODS: The redesigned prototype BASS 4 includes a new module with a suitable and easily applicable screening method (EBA) for the assessment of the intensity of physical, emotional and cognitive workload components and their temporal patterns. Specified criterion functions based on these ratings allow for an adjustment of shift and rest duration according to the intensity of physical and mental workload. Furthermore, with regard to interactive effects both workload and temporal conditions, e.g. time of day, are taken into account. In a second new module, important economic aspects and criteria have been implemented. Different ergonomic solutions for scheduling problems can now also be evaluated with regard to their economic costs. RESULTS: The new version of the computer programme (BASS 4) can now simultaneously take into account numerous ergonomic, legal, agreed and economic criteria for the design and evaluation of working hours. CONCLUSIONS: BASS 4 can now be used as an instrument for the design and the evaluation of working hours with regard to legal, ergonomic and economic aspects at the shop floor as well as in administrative (e.g. health and safety inspection) and research problems.