20 resultados para forced execution of obligations


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A new approach for teaching in basic experimental organic chemistry is presented. Experimental work goes on parallel to theoretical lectures leading to an immediate application of theoretical concepts transmitted therein. One day/week is dedicated exclusively to the organic laboratory. Reactions are proposed as problems to be solved; the student has to deduce the structure of the product on the basis of his observations, the analytical data and his mechanistical knowledge. 70 different experiments, divided in 7 thematical chapters, are presented. All experiments require the analysis and discussion of 1H and 13C NMR, IR and UV spectra. Additional questions about each reaction have to be answered by the student in his written report. Laboratory safety is garanteed by the exclusion or substitution of hazardous and toxic reagents. Microscale preparations are adopted in most cases to lower the cost of materials and the amount of waste. Recycling of many reaction products as starting materials in other experiments reduces the need for commercial reagents and allows the execution of longer reaction sequences. Only unexpensive standard laboratory equipment and simple glassware are required. All experiments include instructions for the save treatment or disposal of chemical waste.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Errors are always present in experimental measurements so, it is important to identify them and understand how they affect the results of experiments. Statistics suggest that the execution of experiments should follow random order, but unfortunately the complete randomization of experiments is not always viable for practical reasons. One possible simplification is blocked experiments within which the levels of certain factors are maintained fixed while the levels of others are randomized. However this has a cost. Although the experimental part is simplified, the statistical analysis becomes more complex.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The quantity of salts in the crude oils depends on the origin and of the wells production and these salts cause several problems during the transport and the process of refine as corrosions, incrustations and deactivation of the employed catalysts in the refineries. In this study were implemented changes for improvements in the execution of ASTM D 6470 method and has also developed a new methodology of extraction system of salts using process of mechanical agitation without heating. The results of the optimization produce larger efficiency and safety to the process compared to the traditional ASTM method.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Techniques of evaluation of risks coming from inherent uncertainties to the agricultural activity should accompany planning studies. The risk analysis should be carried out by risk simulation using techniques as the Monte Carlo method. This study was carried out to develop a computer program so-called P-RISCO for the application of risky simulations on linear programming models, to apply to a case study, as well to test the results comparatively to the @RISK program. In the risk analysis it was observed that the average of the output variable total net present value, U, was considerably lower than the maximum U value obtained from the linear programming model. It was also verified that the enterprise will be front to expressive risk of shortage of water in the month of April, what doesn't happen for the cropping pattern obtained by the minimization of the irrigation requirement in the months of April in the four years. The scenario analysis indicated that the sale price of the passion fruit crop exercises expressive influence on the financial performance of the enterprise. In the comparative analysis it was verified the equivalence of P-RISCO and @RISK programs in the execution of the risk simulation for the considered scenario.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PURPOSE: To determine fetal heart rate (FHR) responses to maternal resistance exercise for the upper and lower body at two different volumes, and after 25 minutes post-exercise.METHODS: Ten pregnant women (22-24 weeks gestation, 25.2±4.4 years of age, 69.8±9.5 kg, 161.6±5.2 cm tall) performed, at 22-24, 28-32 and 34-36 weeks, the following experimental sessions: Session 1 was a familiarization with the equipment and the determination of one estimated maximum repetition. For sessions 2, 3, 4 and 5,FHR was determined during the execution of resistance exercise on bilateral leg extension and pec-deck fly machines, with 1 and 3 sets of 15 repetitions; 50% of the weight load and an estimated repetition maximum. FHR was assessed with a portable digital cardiotocograph. Results were analyzed using Student's ttest, ANOVA with repeated measures and Bonferroni (α=0.05; SPSS 17.0).RESULTS: FHR showed no significant differences between the exercises at 22-24 weeks (bilateral leg extension=143.8±9.4 bpm, pec-deck fly=140.2±10.2 bpm, p=0.34), 28-30 weeks (bilateral leg extension=138.4±12.2 bpm, pec-deck fly=137.6±14.0 bpm, p=0.75) and 34-36 weeks (bilateral leg extension=135.7±5.8 bpm, pec-deck fly=139.7±13.3 bpm, p=0.38), between the volumes(bilateral leg extension at 22-24 weeks: p=0.36, at 28-30 weeks: p=0.19 and at 34-36 weeks: p=0.87; pec-deck fly at 22-24 weeks: p=0.43, at 28-30 weeks: p=0.61 and at 34-36 weeks: p=0.49) and after 25 minutes post-exercise.CONCLUSION: Results of this pilot study would suggest that maternal resistance exercise is safe for the fetus.