2 resultados para water-jet aspirator pump
em Digital Commons at Florida International University
Resumo:
Taylor Slough, in Everglades National Park, has experienced an evolution of water management infrastructure since drainage activities arrived in South Florida. This has included the excavation of canals, installation of large capacity pump stations, and a variety of operational strategies focused on resolving the conflict between managing the water level for developed areas while providing water supply for Everglades National Park. This study provides a review of water management practices and the concurrent hydrologic conditions in the Taylor Slough basin and adjacent canal system from 1961 through 2010. Analyses of flow, water level and rainfall data were divided into time periods that correspond to significant changes in structural features and operational plans. In the early 1960s, Taylor Slough was disconnected from the greater Everglades system by the construction of levees upstream. As water supply for Taylor Slough became more urgent, the Slough was connected to the regional water supply system via a network of canals and pump stations to relieve over-drained conditions. The increased water supply and pump capacity succeeded in raising water level and increasing flow and hydroperiod in the marsh.
Resumo:
Acoustic velocity meter (AVM) sites, located both distant and adjacent to canal water control structures, were constructed and calibrated in L-31W borrow canal and Canal 111 (C-111) to measure canal water velocity. Data were used to compute monthly discharge volumes and overall water budgets for several canal reaches from August 1994 to May 1996. The water budgets indicated extensive aquifer inflows in L-31W associated, in part, with S-332 pump station return flows. Canal and groundwater piezometer data showed 5 distinct hydrologic scenarios (distinguished by the direction and magnitude of hydraulic gradients) in the important Frog Pond area on the eastern boundary of the Everglades National Park. Most of the water lost from C-111 was via surface water losses near the outlet of the system, close to Florida Bay. The distribution of flows during the study suggest an alteration of the present South Dade Conveyance System modification plan to improve water deliveries to Taylor Slough and the Eastern Panhandle of the Everglades National Park. ^