3 resultados para project cost engineering

em Digital Commons at Florida International University


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research addresses the problem of cost estimation for product development in engineer-to-order (ETO) operations. An ETO operation starts the product development process with a product specification and ends with delivery of a rather complicated, highly customized product. ETO operations are practiced in various industries such as engineering tooling, factory plants, industrial boilers, pressure vessels, shipbuilding, bridges and buildings. ETO views each product as a delivery item in an industrial project and needs to make an accurate estimation of its development cost at the bidding and/or planning stage before any design or manufacturing activity starts. ^ Many ETO practitioners rely on an ad hoc approach to cost estimation, with use of past projects as reference, adapting them to the new requirements. This process is often carried out on a case-by-case basis and in a non-procedural fashion, thus limiting its applicability to other industry domains and transferability to other estimators. In addition to being time consuming, this approach usually does not lead to an accurate cost estimate, which varies from 30% to 50%. ^ This research proposes a generic cost modeling methodology for application in ETO operations across various industry domains. Using the proposed methodology, a cost estimator will be able to develop a cost estimation model for use in a chosen ETO industry in a more expeditious, systematic and accurate manner. ^ The development of the proposed methodology was carried out by following the meta-methodology as outlined by Thomann. Deploying the methodology, cost estimation models were created in two industry domains (building construction and the steel milling equipment manufacturing). The models are then applied to real cases; the cost estimates are significantly more accurate than the actual estimates, with mean absolute error rate of 17.3%. ^ This research fills an important need of quick and accurate cost estimation across various ETO industries. It differs from existing approaches to the problem in that a methodology is developed for use to quickly customize a cost estimation model for a chosen application domain. In addition to more accurate estimation, the major contributions are in its transferability to other users and applicability to different ETO operations. ^

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.