4 resultados para cost studies
em Digital Commons at Florida International University
Resumo:
Permeable reactive barriers (PRB) are constructed from soil solid amendments to support the growth of bacteria that are capable of degrading organic contaminants. The objective of this study was to identify low-cost soil solid amendments that could retard the movement of trichloroethylene (TCE) while serving as long-lived carbon sources to foster its biodegradation in shallow groundwater through the use of a PRB. The natural amendments high in organic carbon content such as eucalyptus mulch, compost, wetland peat, organic humus were compared based on their geophysical characteristics, such as pHw, porosity and total organic carbon (TOC), and as well as TCE sorption potentials. The pHw values were within neutral range except for pine bark mulch and wetland peat. All other geophysical characteristics of the amendments showed suitability for use in a PRB. While the Freundlich model showed better fit for compost and pine bark mulch, the linear sorption model was adequate for eucalyptus mulch, wetland peat and Everglades muck within the concentration range studied (0.2-0.8 mg/L TCE). According to these results, two composts and eucalyptus mulch were selected for laboratory column experiments to evaluate their effectiveness at creating and maintaining conditions suitable for TCE anaerobic dechlorination. The columns were monitored for pH, ORP, TCE degradation, longevity of nutrients and soluble TOC to support TCE dechlorination. Native bacteria in the columns had the ability to convert TCE to DCEs; however, the inoculation with the TCE-degrading culture greatly increased the rate of biodegradation. This caused a significant increase in by-product concentration, mostly in the form of DCEs and VC followed by a slow degradation to ethylene. Of the tested amendments eucalyptus mulch was the most effective at supporting the TCE dechlorination. The experimental results of TCE sequential dechlorination took place in eucalyptus mulch and commercial compost from Savannah River Site columns were then simulated using the Hydrus-1D model. The simulations showed good fit with the experimental data. The results suggested that sorption and degradation were the dominant fate and transport mechanisms for TCE and DCEs in the column, supporting the use of these amendments in a permeable reactive barrier to remediate the TCE.
Resumo:
Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.
Resumo:
For the last three decades, the Capital Asset Pricing Model (CAPM) has been a dominant model to calculate expected return. In early 1990% Fama and French (1992) developed the Fama and French Three Factor model by adding two additional factors to the CAPM. However even with these present models, it has been found that estimates of the expected return are not accurate (Elton, 1999; Fama &French, 1997). Botosan (1997) introduced a new approach to estimate the expected return. This approach employs an equity valuation model to calculate the internal rate of return (IRR) which is often called, 'implied cost of equity capital" as a proxy of the expected return. This approach has been gaining in popularity among researchers. A critical review of the literature will help inform hospitality researchers regarding the issue and encourage them to implement the new approach into their own studies.
Resumo:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.