5 resultados para Total Maximum Daily Load Program (Ill.)
em Digital Commons at Florida International University
Mercury interactions with suspended solids at the Upper East Fork Poplar Creek, Oak Ridge, Tennessee
Resumo:
A water quality model was developed to analyze the impact of hydrological events on mercury contamination of the Upper East Fork Poplar Creek, Tennessee. The model simulates surface and subsurface hydrology and transport (MIKE SHE and MIKE 11) and it is coupled with the reactive transport of sediments and mercury (ECOLAB). The model was used to simulate the distribution of mercury contamination in the water and sediments as a function of daily hydrological events. Results from the model show a high correlation between suspended solids and mercury in the water due to the affinity of mercury with suspended organics. The governing parameters for the distribution of total suspended solids and mercury contamination were the critical velocity of the stream for particle resuspension, the rates of resuspension and production of particles, settling velocity, soil-water partition coefficient, and desorption rate of mercury in the water. Flow and load duration curves at the watershed exit were used to calibrate the model and to determine the impact of hydrological events on the total maximum daily load at Station 17. The results confirmed the strong link between hydrology and mercury transport.
Resumo:
This research is part of continued efforts to correlate the hydrology of East Fork Poplar Creek (EFPC) and Bear Creek (BC) with the long term distribution of mercury within the overland, subsurface, and river sub-domains. The main objective of this study was to add a sedimentation module (ECO Lab) capable of simulating the reactive transport mercury exchange mechanisms within sediments and porewater throughout the watershed. The enhanced model was then applied to a Total Maximum Daily Load (TMDL) mercury analysis for EFPC. That application used historical precipitation, groundwater levels, river discharges, and mercury concentrations data that were retrieved from government databases and input to the model. The model was executed to reduce computational time, predict flow discharges, total mercury concentration, flow duration and mercury mass rate curves at key monitoring stations under various hydrological and environmental conditions and scenarios. The computational results provided insight on the relationship between discharges and mercury mass rate curves at various stations throughout EFPC, which is important to best understand and support the management mercury contamination and remediation efforts within EFPC.
Resumo:
This research document is motivated by the need for a systemic, efficient quality improvement methodology at universities. There exists no methodology designed for a total quality management (TQM) program in a university. The main objective of this study is to develop a TQM Methodology that enables a university to efficiently develop an integral total quality improvement (TQM) Plan. ^ Current research focuses on the need of improving the quality of universities, the study of the perceived best quality universities, and the measurement of the quality of universities through rankings. There is no evidence of research on how to plan for an integral quality improvement initiative for the university as a whole, which is the main contribution of this study. ^ This research is built on various reference TQM models and criteria provided by ISO 9000, Baldrige and Six Sigma; and educational accreditation criteria found in ABET and SACS. The TQM methodology is proposed by following a seven-step metamethodology. The proposed methodology guides the user to develop a TQM plan in five sequential phases: initiation, assessment, analysis, preparation and acceptance. Each phase defines for the user its purpose, key activities, input requirements, controls, deliverables, and tools to use. The application of quality concepts in education and higher education is particular; since there are unique factors in education which ought to be considered. These factors shape the quality dimensions in a university and are the main inputs to the methodology. ^ The proposed TQM Methodology is used to guide the user to collect and transform appropriate inputs to a holistic TQM Plan, ready to be implemented by the university. Different input data will lead to a unique TQM plan for the specific university at the time. It may not necessarily transform the university into a world-class institution, but aims to strive for stakeholder-oriented improvements, leading to a better alignment with its mission and total quality advancement. ^ The proposed TQM methodology is validated in three steps. First, it is verified by going through a test activity as part of the meta-methodology. Secondly, the methodology is applied to a case university to develop a TQM plan. Lastly, the methodology and the TQM plan both are verified by an expert group consisting of TQM specialists and university administrators. The proposed TQM methodology is applicable to any university at all levels of advancement, regardless of changes in its long-term vision and short-term needs. It helps to assure the quality of a TQM plan, while making the process more systemic, efficient, and cost effective. This research establishes a framework with a solid foundation for extending the proposed TQM methodology into other industries. ^
Resumo:
The integration of automation (specifically Global Positioning Systems (GPS)) and Information and Communications Technology (ICT) through the creation of a Total Jobsite Management Tool (TJMT) in construction contractor companies can revolutionize the way contractors do business. The key to this integration is the collection and processing of real-time GPS data that is produced on the jobsite for use in project management applications. This research study established the need for an effective planning and implementation framework to assist construction contractor companies in navigating the terrain of GPS and ICT use. An Implementation Framework was developed using the Action Research approach. The framework consists of three components, as follows: (i) ICT Infrastructure Model, (ii) Organizational Restructuring Model, and (iii) Cost/Benefit Analysis. The conceptual ICT infrastructure model was developed for the purpose of showing decision makers within highway construction companies how to collect, process, and use GPS data for project management applications. The organizational restructuring model was developed to assist companies in the analysis and redesign of business processes, data flows, core job responsibilities, and their organizational structure in order to obtain the maximum benefit at the least cost in implementing GPS as a TJMT. A cost-benefit analysis which identifies and quantifies the cost and benefits (both direct and indirect) was performed in the study to clearly demonstrate the advantages of using GPS as a TJMT. Finally, the study revealed that in order to successfully implement a program to utilize GPS data as a TJMT, it is important for construction companies to understand the various implementation and transitioning issues that arise when implementing this new technology and business strategy. In the study, Factors for Success were identified and ranked to allow a construction company to understand the factors that may contribute to or detract from the prospect for success during implementation. The Implementation Framework developed as a result of this study will serve to guide highway construction companies in the successful integration of GPS and ICT technologies for use as a TJMT.
Resumo:
One of the major problems in the analysis of beams with Moment of Inertia varying along their length, is to find the Fixed End Moments, Stiffness, and Carry-Over Factors. In order to determine Fixed End Moments, it is necessary to consider the non-prismatic member as integrated by a large number of small sections with constant Moment of Inertia, and to find the M/EI values for each individual section. This process takes a lot of time from Designers and Structural Engineers. The object of this thesis is to design a computer program to simplify this repetitive process, obtaining rapidly and effectively the Final Moments and Shears in continuous non-prismatic Beams. For this purpose the Column Analogy and the Moment Distribution Methods of Professor Hardy Cross have been utilized as the principles toward the methodical computer solutions. The program has been specifically designed to analyze continuous beams of a maximum of four spans of any length, integrated by symmetrical members with rectangular cross sections and with rectilinear variation of the Moment of Inertia. Any load or combination of uniform and concentrated loads must be considered. Finally sample problems will be solved with the new Computer Program and with traditional systems, to determine the accuracy and applicability of the Program.