7 resultados para Tenure system in kerala

em Digital Commons at Florida International University


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pseudomonas aeruginosa is an opportunistic pathogen found in a wide variety of environments. It is one of the leading causes of morbidity and mortality in cystic fibrosis patients, and one of the main sources of nosocomial infections in the United States. One of the most prominent features of this pathogen is its wide resistance to antibiotics. P. aeruginosa employs a variety of mechanisms including efflux pumps and the expression of B-lactamases to overcome antibiotic treatment. Two chromosomally encoded lactamases, ampC and poxB, have been identified in P. aeruginosa. Sequence analyses have shown the presence of a two-component system (TCS) called MifSR (MifS-Sensor and MifR-Response Regulator), immediately upstream of the poxAB operon. It is hypothesized that the MifSR TCS is involved in B-lactam resistance via the regulation of poxB. Recently, the response regulator MifR has been reported to play a crucial role in biofilm formation, a major characteristic of chronic infections and increased antibiotic resistance. In this study, mifR and mifSR deletion mutants were constructed, and compared to the wild type parent strain PAOl for differences in growth and B-lactam sensitivity. Results obtained thus far indicate that mifR and mifSR are not essential for growth, and do not confer B-lactam resistance under the conditions tested. This study is significant because biofilm formation and antibiotic resistance are two hallmarks of P. aeruginosa infections, and finding a link between these two may lead to the development of improved treatment strategies.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the establishment of the evaluation system in 1975, the junior colleges in the Republic of China (Taiwan), have gone through six formal evaluations. We know that evaluation in schooling, like quality control in businesses, should be a systematic, formal, and a continual process. It can doubtless serve as a strategy to refine the quality of education. The purpose of this research is to explore the current practice of junior college evaluation in Taiwan. This provides insight into the development of and quality of the current evaluation system. Moreover, this study also identified the source of problems with the current evaluation system and provided suggestion for improvements.^ In order to attain the above purposes, this research was undertaken in both theoretical and practical ways. First, theoretically, on the basis of a literature review, the theories of educational evaluation and, according to the course and principles of development, a view of the current practice in Taiwan. Secondly, in practice, by means of questionnaires, an analysis of the views of evaluation committeemen, junior college presidents, and administrators were obtained on evaluation models, methods, contents, organization, functions, criteria, grades reports, and others with suggestions for improvement. The summary of findings concludes that most evaluators and evaluatees think the purpose of evaluation can help the colleges explore their difficulties and problems. In addition, it was found that there is significant difference between the two groups regarding the evaluation methods, contents, organization, functions, criteria, grades reports and others, while analyzing these objective data forms the basis for an improved method of evaluation for Junior Colleges in Taiwan. ^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Neural crest cells originate from the dorsal most region of the embryonic neural tube. These cells migrate into several embryonic locations and differentiate into a variety of cell types. Cardiac neural crest (CNC) cells are a set of neural crest progenitors that aid in the proper formation of the cardiac septum, which separates the pulmonary from the systemic circulation. We have used Splotch mice to investigate whether the murine CNC cells play a role during the development oft he myocardium and the conduction system. Splotch mice carry a mutation in the P AX3 transcription factor, and display a problem in CNC cell migration. A scanning-electron-microscopy analysis of Splotch mutant-embryonic-hearts reveals abnormalities in the interventricular septum. In addition, the right and left ventricular cavities appear dilated relative to a wild type heart. Hoechst nuclei staining of Splotch heart cryosections demonstrates a decreased number of cardiomyocytes and a corresponding thinner ventricular wall. The absence of Connexin 40 in the ventricles of Splotch mutants, suggests conduction system defects. These results support the evidence that CNC cell signaling plays a role in modulating the growth and development of murine cardiomyocytes and their differentiation into conductile cells.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this research is to explore on a deeper level the healthcare system of the United States, its background, and other factors that could provide possible solutions to simplify the fragmented healthcare system. The ultimate goal is the formation of concise ideas that could make the system, which prevents millions of Americans from obtaining adequate medical attention, substantially better. The paper will offer a better insight into the four different models of healthcare insurance found around the world in other developed countries with the purpose of establishing a comparison with that of the United States. The changes implemented by the Patient Protection and Affordable Care Act of 2010 are also analyzed to arrive at the conclusion of whether it has helped more American citizens get access to medical attention. Quality Improvement tools and thorough analysis of different methods from a financial, managerial, legal, and administrative perspective are used to provide valuable information that could aid in the implementation of modifications to the healthcare system of the United States in the near future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.