9 resultados para Project implementation

em Digital Commons at Florida International University


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide an analysis of sistematización’s use as a research tool in the operationalization of a “neighborhood approach” to the implementation of disaster risk reduction (DRR) in informal urban settlements. Design/methodology/approach – The first section highlights sistematización’s historical origins in Latin America in the fields of popular adult education, social work, and rural development. The second explains why sistematización was made a required component of project implementation. The third section addresses the approach to sistematización used. The final discusses how this experience both contributes to sistematización’s theoretical development and practical application as a methodology. Findings – The introduction of “sistematización” as a research tool facilitated real-time assessment of project implementation, providing timely information that positively influenced decision-making processes. This on-going feedback, collective learning, and open-exchange of know-how between NGOs and partner institutions allowed for the evaluation of existing practices and development of new ways of collaborating to address disaster risk in complex and dynamic urban environments. Practical implications – Sistematización transcends the narrow focus of traditional monitoring and evaluation on final results, emphasizing a comprehensive understanding of processes and contexts. Originality/value – Its use in the implementation of DRR initiatives in informal urban environments is particularly novel, highlighting the capacity of the methodology to be tailored to a variety of needs, in this case, bridging the gap between NGOs, local governments, and vulnerable communities, as well as between urban, development, and disaster risk management planning.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Throughout the Biscayne Bay watershed, existing coastal wetland communities have been cut off from sheet flow for decades. With the expectation that reconnection of these wetlands to upstream water sources would alter existing hydrologic conditions and recreate a more natural sheet flow to Biscayne National Park, a demonstration project on freshwater rediversion was undertaken. The objectives of the project were to document the effects of freshwater diversion on: (a) swamp and nearshore water chemistry and hydrology; (b) soil development processes; (c) macrophyte and benthic algal community composition, structure and production; (d) abundance of epiphytic and epibenthic invertebrates; (e) zonation, production, and phenology of primary producers in the nearshore environment, and (f) exchanges of nutrients and particulates between nearshore and mangrove ecosystems.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The implementation of collaborative planning and teaching models in ten flexibly scheduled elementary and middle school library media centers was studied to determine which factors facilitated the collaborative planning process and to learn what occurs when library media specialists (LMSs) and classroom teachers (CTs) plan together. In this qualitative study, 61 principals, CTs, and LMSs were interviewed on a range of topics including the principal's role, school climate, the value of team planning, the importance of information literacy instruction, and the ideal learning environment. Other data sources were observations, videotapes of planning sessions, and documents. This three-year school reform effort was funded by the Library Power Project to improve library programs, to encourage collaborative planning, and to increase curricular integration of information literacy skills instruction. ^ The findings included a description of typical planning sessions and the identification of several major factors which impacted the success of collaborative planning: the individuals involved, school climate, time for planning, the organization of the school, the facility and collection, and training. Of these factors, the characteristics and actions of the people involved were most critical to the implementation of the innovation. The LMS was the pivotal player and, in the views of CTs, principals, and LMSs themselves, must be knowledgeable about curriculum, the library collection, and instructional design and delivery; must be open and welcoming to CTs and use good interpersonal skills; and must be committed to information literacy instruction and willing to act as a change agent. The support of the principal was vital; in schools with successful programs, the principal served as an advocate for collaborative planning and information literacy instruction, provided financial support for the library program including clerical staff, and arranged for LMSs and CTs to have time during the school day to plan together. ^ CTs involved in positive planning partnerships with LMSs were flexible, were open to change, used a variety of instructional materials, expected students to be actively involved in their own learning, and were willing to team teach with LMSs. Most CTs planning with LMSs made lesson plans in advance and preferred to plan with others. Also, most CTs in this study planned with grade level or departmental groups, which expedited the delivery of information literacy instruction and the effective use of planning time. ^ Implications of the findings of this research project were discussed for individual schools, for school districts, and for colleges and universities training LMSs, CTs, and administrators. Suggestions for additional research were also included. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ultimate intent of this dissertation was to broaden and strengthen our understanding of IT implementation by emphasizing research efforts on the dynamic nature of the implementation process. More specifically, efforts were directed toward opening the "black box" and providing the story that explains how and why contextual conditions and implementation tactics interact to produce project outcomes. In pursuit of this objective, the dissertation was aimed at theory building and adopted a case study methodology combining qualitative and quantitative evidence. Precisely, it examined the implementation process, use and consequences of three clinical information systems at Jackson Memorial Hospital, a large tertiary care teaching hospital.^ As a preliminary step toward the development of a more realistic model of system implementation, the study proposes a new set of research propositions reflecting the dynamic nature of the implementation process.^ Findings clearly reveal that successful implementation projects are likely to be those where key actors envision end goals, anticipate challenges ahead, and recognize the presence of and seize opportunities. It was also found that IT implementation is characterized by the systems theory of equifinality, that is, there are likely several equally effective ways to achieve a given end goal. The selection of a particular implementation strategy appears to be a rational process where actions and decisions are largely influenced by the degree to which key actors recognize the mediating role of each tactic and are motivated to action. The nature of the implementation process is also characterized by the concept of "duality of structure," that is, context and actions mutually influence each other. Another key finding suggests that there is no underlying program that regulates the process of change and moves it form one given point toward a subsequent and already prefigured end. For this reason, the implementation process cannot be thought of as a series of activities performed in a sequential manner such as conceived in stage models. Finally, it was found that IT implementation is punctuated by a certain indeterminacy. Results suggest that only when substantial efforts are focused on what to look for and think about, it is less likely that unfavorable and undesirable consequences will occur. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Governmental accountability is the requirement of government entities to be accountable to the citizenry in order to justify the raising and expenditure of public resources. The concept of service efforts and accomplishments measurement for government programs was introduced by the Governmental Accounting Standards Board (GASB) in Service Efforts and Accomplishments Reporting: Its Time Has Come (1990). This research tested the feasibility of implementing the concept for the Federal-aid highway construction program and identified factors affecting implementation with a case study of the District of Columbia. Changes in condition and performance ratings for specific highway segments in 15 projects, before and after construction expenditures, were evaluated using data provided by the Federal Highway Administration. The results of the evaluation indicated difficulty in drawing conclusions on the state program performance, as a whole. The state program reflects problems within the Federally administered program that severely limit implementation of outcome-oriented performance measurement. Major problems identified with data acquisition are: data reliability, availability, compatibility and consistency among states. Other significant factors affecting implementation are institutional barriers and political barriers. Institutional issues in the Federal Highway Administration include the lack of integration of the fiscal project specific database with the Highway Performance Monitoring System database. The Federal Highway Administration has the ability to resolve both of the data problems, however interviews with key Federal informants indicate this will not occur without external directives and changes to the Federal “stewardship” approach to program administration. ^ The findings indicate many issues must be resolved for successful implementation of outcome-oriented performance measures in the Federal-aid construction program. The issues are organizational and political in nature, however in the current environment resolution is possible. Additional research is desirable and would be useful in overcoming the obstacles to successful implementation. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is significant national evidence the language development of four year-olds is a critical area for later school success (Brooks-Gunn, Fuligni, & Berlin, 2003; Cunningham, & Stanovich, 1998). This study originated as part of Literacy Intervention X (LIX), a larger national study conducted to examine the effectiveness of early literacy curricula implemented in subsidized childcare centers. The professional development of childcare center providers is key to improving the quality of subsidized care. In exploring the mentoring practices of nine LIX literacy coaches, the researcher investigated the perceptions of what best mentoring practices facilitated the implementation of literacy curricula by childcare providers. A qualitative case study was conducted using a combination of participant observer notes, document analysis, and focus group semi-structured interviews. The researcher is a participant observer, one of the nine Literacy Coaches. The best mentoring practices from the perspective of the literacy coaches are related to building relationships including trust, mutual respect, support, empathy, and encouragement with the childcare providers, the center directors, and with fellow literacy coaches. Clear, constant, and consistent communication with the childcare providers was a vital mentoring practice in building a relationship between the literacy coach and childcare provider. Another best mentoring practice in building a relationship with the childcare provider was the perceptions of the literacy coaches as co-learners in the mentoring process. The best mentoring practices highlighted in this study exemplified the kind of effective professional development that builds on the strengths of the childcare providers and does not disrupt the childcare centers or the services provided by the subsidized childcare programs that meet the needs of children and families. The experience of these nine literacy coaches, including their perceptions of effective mentoring practices, along with lesson learned about relationships, mentoring team structures, and general project design sheds light on the challenge of mentoring subsidized childcare providers in future literacy intervention projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Communication has become an essential function in our civilization. With the increasing demand for communication channels, it is now necessary to find ways to optimize the use of their bandwidth. One way to achieve this is by transforming the information before it is transmitted. This transformation can be performed by several techniques. One of the newest of these techniques is the use of wavelets. Wavelet transformation refers to the act of breaking down a signal into components called details and trends by using small waveforms that have a zero average in the time domain. After this transformation the data can be compressed by discarding the details, transmitting the trends. In the receiving end, the trends are used to reconstruct the image. In this work, the wavelet used for the transformation of an image will be selected from a library of available bases. The accuracy of the reconstruction, after the details are discarded, is dependent on the wavelets chosen from the wavelet basis library. The system developed in this thesis takes a 2-D image and decomposes it using a wavelet bank. A digital signal processor is used to achieve near real-time performance in this transformation task. A contribution of this thesis project is the development of DSP-based test bed for the future development of new real-time wavelet transformation algorithms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.