5 resultados para Project Life Cycle
em Digital Commons at Florida International University
Resumo:
The Deccan Trap basalts are the remnants of a massive series of lava flows that erupted at the K/T boundary and covered 1-2 million km2 of west-central India. This eruptive event is of global interest because of its possible link to the major mass extinction event, and there is much debate about the duration of this massive volcanic event. In contrast to isotopic or paleomagnetic dating methods, I explore an alternative approach to determine the lifecycle of the magma chambers that supplied the lavas, and extend the concept to obtain a tighter constraint on Deccan’s duration. My method relies on extracting time information from elemental and isotopic diffusion across zone boundaries in individual crystals. I determined elemental and Sr-isotopic variations across abnormally large (2-5 cm) plagioclase crystals from the Thalghat and Kashele “Giant Plagioclase Basalts” from the lowermost Jawhar and Igatpuri Formations respectively in the thickest Western Ghats section near Mumbai. I also obtained bulk rock major, trace and rare earth element chemistry of each lava flow from the two formations. Thalghat flows contain only 12% zoned crystals, with 87 Sr/86Sr ratios of 0.7096 in the core and 0.7106 in the rim, separated by a sharp boundary. In contrast, all Kashele crystals have a wider range of 87Sr/86Sr values, with multiple zones. Geochemical modeling of the data suggests that the two types of crystals grew in distinct magmatic environments. Modeling intracrystalline diffusive equilibration between the core and rim of Thalghat crystals led me to obtain a crystal growth rate of 2.03x10-10 cm/s and a residence time of 780 years for the crystals in the magma chamber(s). Employing some assumptions based on field and geochronologic evidence, I extrapolated this residence time to the entire Western Ghats and obtained an estimate of 25,000–35,000 years for the duration of Western Ghats volcanism. This gave an eruptive rate of 30–40 km3/yr, which is much higher than any presently erupting volcano. This result will remain speculative until a similarly detailed analytical-modeling study is performed for the rest of the Western Ghats formations.
Resumo:
"Perceptions of Organizational Effectiveness over Organizational Life Cycles" written by Kim S. Cameron and David S. Whetten, posits a theory regarding organizational effectiveness criteria change as firms develop along the life cycle continuum. Induced from observations obtained from a simulation game, the Cameron and Whetten theory is applied in this article to two real organizations, Wendy's and McDonald's, with the intention of demonstrating that this theory is applicable in "real life" situations.
Resumo:
The Deccan Trap basalts are the remnants of a massive series of lava flows that erupted at the K/T boundary and covered 1-2 million km2 of west-central India. This eruptive event is of global interest because of its possible link to the major mass extinction event, and there is much debate about the duration of this massive volcanic event. In contrast to isotopic or paleomagnetic dating methods, I explore an alternative approach to determine the lifecycle of the magma chambers that supplied the lavas, and extend the concept to obtain a tighter constraint on Deccan’s duration. My method relies on extracting time information from elemental and isotopic diffusion across zone boundary in an individual crystal. I determined elemental and Sr-isotopic variations across abnormally large (2-5 cm) plagioclase crystals from the Thalghat and Kashele “Giant Plagioclase Basalts” from the lowermost Jawhar and Igatpuri Formations respectively in the thickest Western Ghats section near Mumbai. I also obtained bulk rock major, trace and rare earth element chemistry of each lava flow from the two formations. Thalghat flows contain only 12% zoned crystals, with 87Sr/86Sr ratios of 0.7096 in the core and 0.7106 in the rim, separated by a sharp boundary. In contrast, all Kashele crystals have a wider range of 87Sr/86Sr values, with multiple zones. Geochemical modeling of the data suggests that the two types of crystals grew in distinct magmatic environments. Modeling intracrystalline diffusive equilibration between the core and rim of Thalghat crystals led me to obtain a crystal growth rate of 2.03x10-10 cm/s and a residence time of 780 years for the crystals in the magma chamber(s). Employing some assumptions based on field and geochronologic evidence, I extrapolated this residence time to the entire Western Ghats and obtained an estimate of 25,000 – 35,000 years for the duration of Western Ghats volcanism. This gave an eruptive rate of 30 – 40 km3/yr, which is much higher than any presently erupting volcano. This result will remain speculative until a similarly detailed analytical-modeling study is performed for the rest of the Western Ghats formations.
Resumo:
Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.
Resumo:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.