5 resultados para OPM3 (Organizational Project Management Model Maturity)

em Digital Commons at Florida International University


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the 1990s, scholars have paid special attention to public management’s role in theory and research under the assumption that effective management is one of the primary means for achieving superior performance. To some extent, this was influenced by popular business writings of the 1980s as well as the reinventing literature of the 1990s. A number of case studies but limited quantitative research papers have been published showing that management matters in the performance of public organizations. ^ My study examined whether or not management capacity increased organizational performance using quantitative techniques. The specific research problem analyzed was whether significant differences existed between high and average performing public housing agencies on select criteria identified in the Government Performance Project (GPP) management capacity model, and whether this model could predict outcome performance measures in a statistically significant manner, while controlling for exogenous influences. My model included two of four GPP management subsystems (human resources and information technology), integration and alignment of subsystems, and an overall managing for results framework. It also included environmental and client control variables that were hypothesized to affect performance independent of management action. ^ Descriptive results of survey responses showed high performing agencies with better scores on most high performance dimensions of individual criteria, suggesting support for the model; however, quantitative analysis found limited statistically significant differences between high and average performers and limited predictive power of the model. My analysis led to the following major conclusions: past performance was the strongest predictor of present performance; high unionization hurt performance; and budget related criterion mattered more for high performance than other model factors. As to the specific research question, management capacity may be necessary but it is not sufficient to increase performance. ^ The research suggested managers may benefit by implementing best practices identified through the GPP model. The usefulness of the model could be improved by adding direct service delivery to the model, which may also improve its predictive power. Finally, there are abundant tested concepts and tools designed to improve system performance that are available for practitioners designed to improve management subsystem support of direct service delivery.^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The integration of automation (specifically Global Positioning Systems (GPS)) and Information and Communications Technology (ICT) through the creation of a Total Jobsite Management Tool (TJMT) in construction contractor companies can revolutionize the way contractors do business. The key to this integration is the collection and processing of real-time GPS data that is produced on the jobsite for use in project management applications. This research study established the need for an effective planning and implementation framework to assist construction contractor companies in navigating the terrain of GPS and ICT use. An Implementation Framework was developed using the Action Research approach. The framework consists of three components, as follows: (i) ICT Infrastructure Model, (ii) Organizational Restructuring Model, and (iii) Cost/Benefit Analysis. The conceptual ICT infrastructure model was developed for the purpose of showing decision makers within highway construction companies how to collect, process, and use GPS data for project management applications. The organizational restructuring model was developed to assist companies in the analysis and redesign of business processes, data flows, core job responsibilities, and their organizational structure in order to obtain the maximum benefit at the least cost in implementing GPS as a TJMT. A cost-benefit analysis which identifies and quantifies the cost and benefits (both direct and indirect) was performed in the study to clearly demonstrate the advantages of using GPS as a TJMT. Finally, the study revealed that in order to successfully implement a program to utilize GPS data as a TJMT, it is important for construction companies to understand the various implementation and transitioning issues that arise when implementing this new technology and business strategy. In the study, Factors for Success were identified and ranked to allow a construction company to understand the factors that may contribute to or detract from the prospect for success during implementation. The Implementation Framework developed as a result of this study will serve to guide highway construction companies in the successful integration of GPS and ICT technologies for use as a TJMT.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The authors investigate the relationship between loyalty and perceived service quality of hotel customers and discus managerial implications to develop strategies to enhance loyalty of hotel customers. A survey was conducted among customers in the San Francisco Bay Area. Results indicate that customer loyalty is dependent on perceived service quality which is observed in terms of timelines, facilities, and ambience.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Investigation of the performance of engineering project organizations is critical for understanding and eliminating inefficiencies in today’s dynamic global markets. The existing theoretical frameworks consider project organizations as monolithic systems and attribute the performance of project organizations to the characteristics of the constituents. However, project organizations consist of complex interdependent networks of agents, information, and resources whose interactions give rise to emergent properties that affect the overall performance of project organizations. Yet, our understanding of the emergent properties in project organizations and their impact on project performance is rather limited. This limitation is one of the major barriers towards creation of integrated theories of performance assessment in project organizations. The objective of this paper is to investigate the emergent properties that affect the ability of project organization to cope with uncertainty. Based on the theories of complex systems, we propose and test a novel framework in which the likelihood of performance variations in project organizations could be investigated based on the environment of uncertainty (i.e., static complexity, dynamic complexity, and external source of disruption) as well as the emergent properties (i.e., absorptive capacity, adaptive capacity, and restorative capacity) of project organizations. The existence and significance of different dimensions of the environment of uncertainty and emergent properties in the proposed framework are tested based on the analysis of the information collected from interviews with senior project managers in the construction industry. The outcomes of this study provide a novel theoretical lens for proactive bottom-up investigation of performance in project organizations at the interface of emergent properties and uncertainty

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nursing Case Management has motivated nurses to examine the effects of care provided to patients, and to devise means of improving this care. The success of this nursing care delivery model is well documented among a variety of acute and chronically ill patients. Utilizing nonparametric ANOVA for comparison of two means, this study investigates the outcome of the implementation of a nursingcase management model on an orthopedic unit of a local hospital. A convenience sample (N=149) of hip-fracture patients for two separate eight months charting periods were used. The first period was pre-case management and the second period was after the implementation of nursing managed care on the unit. Results suggested that nursing case management was effective in reducing the total length of hospital stay and post-operative days significantly.