2 resultados para Modular façade system

em Digital Commons at Florida International University


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis develops and validates the framework of a specialized maintenance decision support system for a discrete part manufacturing facility. Its construction utilizes a modular approach based on the fundamental philosophy of Reliability Centered Maintenance (RCM). The proposed architecture uniquely integrates System Decomposition, System Evaluation, Failure Analysis, Logic Tree Analysis, and Maintenance Planning modules. It presents an ideal solution to the unique maintenance inadequacies of modern discrete part manufacturing systems. Well established techniques are incorporated as building blocks of the system's modules. These include Failure Mode Effect and Criticality Analysis (FMECA), Logic Tree Analysis (LTA), Theory of Constraints (TOC), and an Expert System (ES). A Maintenance Information System (MIS) performs the system's support functions. Validation was performed by field testing of the system at a Miami based manufacturing facility. Such a maintenance support system potentially reduces downtime losses and contributes to higher product quality output. Ultimately improved profitability is the final outcome. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research investigates a new structural system utilising modular construction. Five-sided boxes are cast on-site and stacked together to form a building. An analytical model was created of a typical building in each of two different analysis programs utilising the finite element method (Robot Millennium and ETABS). The pros and cons of both Robot Millennium and ETABS are listed at several key stages in the development of an analytical model utilising this structural system. Robot Millennium was initially utilised but created an analytical model too large to be successfully run. The computation requirements were too large for conventional computers. Therefore Robot Millennium was abandoned in favour of ETABS, whose more simplistic algorithms and assumptions permitted running this large computation model. Tips are provided as well as pitfalls signalled throughout the process of modelling such complex buildings of this type. ^ The building under high seismic loading required a new horizontal shear mechanism. This dissertation has proposed to create a secondary floor that ties to the modular box through the use of gunwales, and roughened surfaces with epoxy coatings. In addition, vertical connections necessitated a new type of shear wall. These shear walls consisted of waffled external walls tied through both reinforcement and a secondary concrete pour. ^ This structural system has generated a new building which was found to be very rigid compared to a conventional structure. The proposed modular building exhibited a period of 1.27 seconds, which is about one-fifth of a conventional building. The maximum lateral drift occurs under seismic loading with a magnitude of 6.14 inches which is one-quarter of a conventional building's drift. The deflected shape and pattern of the interstorey drifts are consistent with those of a coupled shear wall building. In conclusion, the computer analysis indicate that this new structure exceeds current code requirements for both hurricane winds and high seismic loads, and concomitantly provides a shortened construction time with reduced funding. ^