11 resultados para Implementation Plan
em Digital Commons at Florida International University
Resumo:
The purpose of this inquiry was to investigate the impact of a large, urban school district's experience in implementing a mandated school improvement plan and to examine how that plan was perceived, interpreted, and executed by those charged with the task. The research addressed the following questions: First, by whom was the district implementation plan designed, and what factors were considered in its construction? Second, what impact did the district implementation plan have on those charged with its implementation? Third, what impact did the district plan have on the teaching and learning practices of a particular school? Fourth, what aspects of the implemention plan were perceived as most and least helpful by school personnel in achieving stated goals? Last, what were the intended and unintended consequences of an externally mandated and directed plan for improving student achievement? The implementation process was measured against Fullan's model as expounded upon in The Meaning of Educational Change (1982) and The New Meaning of Educational Change (1990). The Banya implementation model (1993), because it added a dimension not adequately addressed by Fullan, was also considered.^ A case study was used as the methodological framework of this qualitative study. Sources of data used in this inquiry included document analysis, participant observations in situ, follow-up interviews, the "long" interview, and triangulation. The study was conducted over a twelve-month period. Findings were obtained from the content analysis of interview transcripts of multiple participants. Results were described and interpreted using the Fullan and Banya models as the descriptive framework. A cross-case comparison of the multiple perspectives of the same phenomena by various participants was constructed.^ The study concluded that the school district's implementation plan to improve student achievement was closely aligned to Fullan's model, although not intentionally. The research also showed that where there was common understanding at all levels of the organization as to the expectations for teachers, level of support to be provided, and availability of resources, successful implementation occured. The areas where successful implementation did not occur were those where the complexity of the changes were underestimated and processes for dealing with unintended consequences were not considered or adequately addressed. The unique perspectives of the various participants, from the superintendent to the classroom teacher, are described. Finally, recommendations for enhancement of implementation are offered and possible topics for further research studies are postulated. ^
Resumo:
Outline of the LCME 3-stage Accreditation Process for Medical Education. Details the stages in the College of Medicine's efforts to initiate the accreditation process. Also details the College of Medicine's Implementation Plan and Proposed Timeline for implementation.
Resumo:
Increased pressure to control costs and increased competition has prompted health care managers to look for tools to effectively operate their institutions. This research sought a framework for the development of a Simulation-Based Decision Support System (SB-DSS) to evaluate operating policies. A prototype of this SB-DSS was developed. It incorporates a simulation model that uses real or simulated data. ER decisions have been categorized and, for each one, an implementation plan has been devised. Several issues of integrating heterogeneous tools have been addressed. The prototype revealed that simulation can truly be used in this environment in a timely fashion because the simulation model has been complemented with a series of decision-making routines. These routines use a hierarchical approach to organize the various scenarios under which the model may run and to partially reconfigure the ARENA model at run time. Hence, the SB-DSS tailors its responses to each node in the hierarchy.
Resumo:
2011-12 Worlds Ahead Strategic Plan Implementation Meeting held at Graham Center, Modesto Maidique Campus. Speakers included President Mark B. Rosenberg, Provost and Executive Vice President for Academic Affairs Douglas Wartzok,
Resumo:
2011-12 Worlds Ahead Strategic Plan Implementation Forum, held at Biscayne Bay Campus. Speakers included President Mark B. Rosenberg and Chief Financial Officer Ken Jessell.
Resumo:
The implementation of collaborative planning and teaching models in ten flexibly scheduled elementary and middle school library media centers was studied to determine which factors facilitated the collaborative planning process and to learn what occurs when library media specialists (LMSs) and classroom teachers (CTs) plan together. In this qualitative study, 61 principals, CTs, and LMSs were interviewed on a range of topics including the principal's role, school climate, the value of team planning, the importance of information literacy instruction, and the ideal learning environment. Other data sources were observations, videotapes of planning sessions, and documents. This three-year school reform effort was funded by the Library Power Project to improve library programs, to encourage collaborative planning, and to increase curricular integration of information literacy skills instruction. ^ The findings included a description of typical planning sessions and the identification of several major factors which impacted the success of collaborative planning: the individuals involved, school climate, time for planning, the organization of the school, the facility and collection, and training. Of these factors, the characteristics and actions of the people involved were most critical to the implementation of the innovation. The LMS was the pivotal player and, in the views of CTs, principals, and LMSs themselves, must be knowledgeable about curriculum, the library collection, and instructional design and delivery; must be open and welcoming to CTs and use good interpersonal skills; and must be committed to information literacy instruction and willing to act as a change agent. The support of the principal was vital; in schools with successful programs, the principal served as an advocate for collaborative planning and information literacy instruction, provided financial support for the library program including clerical staff, and arranged for LMSs and CTs to have time during the school day to plan together. ^ CTs involved in positive planning partnerships with LMSs were flexible, were open to change, used a variety of instructional materials, expected students to be actively involved in their own learning, and were willing to team teach with LMSs. Most CTs planning with LMSs made lesson plans in advance and preferred to plan with others. Also, most CTs in this study planned with grade level or departmental groups, which expedited the delivery of information literacy instruction and the effective use of planning time. ^ Implications of the findings of this research project were discussed for individual schools, for school districts, and for colleges and universities training LMSs, CTs, and administrators. Suggestions for additional research were also included. ^
Resumo:
The purpose of this study was to ascertain the perceptions of educators at one elementary school regarding the changes in the teaching and learning environment and their related effects following the implementation of Florida's A+ high-stakes accountability system. This study also assessed whether these changes were identified by participants as meaningful and enduring, in terms of the definition by Lieberman and Miller (1999). Twenty-one educators, including 17 teachers and four administrators, at Blue Ribbon Elementary school were interviewed. Data were inductively coded and categorized into four major themes: (a) teaching and learning environment consistency, (b) changes in the teaching and learning environment since the implementation of A+, (c) effects of the changes, and (d) significant and enduring change. Findings fell into three categories (a) identified changes since A+ implementation, (b) effects of changes, and (c) what participants believed was significant and long term change, which included those characteristics of the school that had been identified as consistent in the teaching and learning environment. Statements of the participants explained their perceptions about what instructional decisions where made in response to the A+ Plan including the modification of curriculum, the addition or omission of subject matter taught, and the positive or negative impact these decisions had on the teaching and learning environment. It was found that study participants felt all changes and their effects were a direct result of the A+ Plan and viewed many of the changes as being neither significant nor long term Analysis of the educators' perceptions of the changes they experienced revealed the overall feeling that the changes were not indicative of what was necessary to make a school successful. For the participants, the changes lacked the characteristics that they had described as vital in what constituted success. This led to the conclusion that, by Lieberman and Miller's definition, the majority of changes and effects that were implemented at the school as a result of the mandated A+ Plan, were not meaningful and enduring for effective school reform. ^
Resumo:
The purpose of this research was to study the effect of the Florida A+ Plan accountability program on curriculum and instruction in four Title I public elementary schools in the Miami-Dade County Public Schools system. It focused on the experiences of the school principals and the classroom teachers of the four schools as they related to curriculum and instruction. The study included an analysis of the school improvement plans in curriculum and instruction for each school during the school years 1998-2004. ^ The study was conducted in the format of interviews with the school principals and principal selected classroom teachers who taught third, fourth, or fifth grade during the first six years of the Florida A+ Plan. The analysis of the school improvement plans focused on the implementation of curriculum and instruction for each of the four schools. It focused on the goals and measurable objectives selected by each school to improve its instructional program in the academic subjects of reading, mathematics, writing, and science. ^ The findings indicated that under the pressure to improve their school grade on the Florida A+ Plan, each of the target schools, based on individual needs assessments, and restructured their instructional program each school year as documented in their school improvement plans. They altered their programs by analyzing student performance data to realign curriculum and instruction. The analysis of the interviews with the principals and the teachers showed that each school year they restructured their program to align it with the FCAT content. This realigning was a collaborative effort on the part of the administration and the instructional staff. ^
Resumo:
The purpose of this study was to ascertain the perceptions of educators at one elementary school regarding the changes in the teaching and learning environment and their related effects following the implementation of Florida's A+ high-stakes accountability system. This study also assessed whether these changes were identified by participants as meaningful and enduring, in terms of the definition by Lieberman and Miller (1999). Twenty-one educators, including 17 teachers and four administrators, at Blue Ribbon Elementary school were interviewed. Data were inductively coded and categorized into four major themes: (a) teaching and learning environment consistency, (b) changes in the teaching and learning environment since the implementation of A+, (c) effects of the changes, and (d) significant and enduring change. Findings fell into three categories (a) identified changes since A+ implementation, (b) effects of changes, and (c) what participants believed was significant and long term change, which included those characteristics of the school that had been identified as consistent in the teaching and learning environment. Statements of the participants explained their perceptions about what instructional decisions where made in response to the A+ Plan including the modification of curriculum, the addition or omission of subject matter taught, and the positive or negative impact these decisions had on the teaching and learning environment. It was found that study participants felt all changes and their effects were a direct result of the A+ Plan and viewed many of the changes as being neither significant nor long term Analysis of the educators' perceptions of the changes they experienced revealed the overall feeling that the changes were not indicative of what was necessary to make a school successful. For the participants, the changes lacked the characteristics that they had described as vital in what constituted success. This led to the conclusion that, by Lieberman and Miller's definition, the majority of changes and effects that were implemented at the school as a result of the mandated A+ Plan, were not meaningful and enduring for effective school reform.
Resumo:
The purpose of this research was to design and implement a Series of Latin Shows to be featured at the Satine Restaurant located in The Diplomat Hotel in Hollywood, Florida. Three shows were created: "Electro Tango," "Bossa Nova Jazz," and "Piel Canela Night" to help generate interest for not only the Satine Restaurant but also for the surrounding area. The artistic concept included big bands, costumes, dancers and a DJ. A production book was created and included the most important aspects of the individual shows such as budgets, costumes, and ground plans, to assure the success of each event. Careful analysis was done for the demographic area and a marketing plan was designed and implemented. The research and practical application of similar shows in the industry determined that the production of these particular shows, although costly, have a qualifiable chance to succeed in this venue.