13 resultados para Engineering Asset Management

em Digital Commons at Florida International University


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lodging asset management has emerged as one of the most important areas of strategic hotel management. Increasingly, lodging companies are soliciting the services of asset management firms or developing internal asset management competencies. This article synthesizes and discusses the essential components of dynamic lodging asset management. The article provides a detail background on asset management and its importance and explains the role of lodging asset managers and their working relationships with ownership and operators. The article also discusses the competencies and skills of asset managers.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This research aimed at developing a research framework for the emerging field of enterprise systems engineering (ESE). The framework consists of an ESE definition, an ESE classification scheme, and an ESE process. This study views an enterprise as a system that creates value for its customers. Thus, developing the framework made use of system theory and IDEF methodologies. This study defined ESE as an engineering discipline that develops and applies systems theory and engineering techniques to specification, analysis, design, and implementation of an enterprise for its life cycle. The proposed ESE classification scheme breaks down an enterprise system into four elements. They are work, resources, decision, and information. Each enterprise element is specified with four system facets: strategy, competency, capacity, and structure. Each element-facet combination is subject to the engineering process of specification, analysis, design, and implementation, to achieve its pre-specified performance with respect to cost, time, quality, and benefit to the enterprise. This framework is intended for identifying research voids in the ESE discipline. It also helps to apply engineering and systems tools to this emerging field. It harnesses the relationships among various enterprise aspects and bridges the gap between engineering and management practices in an enterprise. The proposed ESE process is generic. It consists of a hierarchy of engineering activities presented in an IDEF0 model. Each activity is defined with its input, output, constraints, and mechanisms. The output of an ESE effort can be a partial or whole enterprise system design for its physical, managerial, and/or informational layers. The proposed ESE process is applicable to a new enterprise system design or an engineering change in an existing system. The long-term goal of this study aims at development of a scientific foundation for ESE research and development.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This research aimed at developing a research framework for the emerging field of enterprise systems engineering (ESE). The framework consists of an ESE definition, an ESE classification scheme, and an ESE process. This study views an enterprise as a system that creates value for its customers. Thus, developing the framework made use of system theory and IDEF methodologies. This study defined ESE as an engineering discipline that develops and applies systems theory and engineering techniques to specification, analysis, design, and implementation of an enterprise for its life cycle. The proposed ESE classification scheme breaks down an enterprise system into four elements. They are work, resources, decision, and information. Each enterprise element is specified with four system facets: strategy, competency, capacity, and structure. Each element-facet combination is subject to the engineering process of specification, analysis, design, and implementation, to achieve its pre-specified performance with respect to cost, time, quality, and benefit to the enterprise. This framework is intended for identifying research voids in the ESE discipline. It also helps to apply engineering and systems tools to this emerging field. It harnesses the relationships among various enterprise aspects and bridges the gap between engineering and management practices in an enterprise. The proposed ESE process is generic. It consists of a hierarchy of engineering activities presented in an IDEF0 model. Each activity is defined with its input, output, constraints, and mechanisms. The output of an ESE effort can be a partial or whole enterprise system design for its physical, managerial, and/or informational layers. The proposed ESE process is applicable to a new enterprise system design or an engineering change in an existing system. The long-term goal of this study aims at development of a scientific foundation for ESE research and development.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The safety of workers in nighttime roadway work zones has become a major concern for state transportation agencies due to the increase in the number of work zone fatalities. During the last decade, several studies have focused on the improvement of safety in nighttime roadway work zones; but the element that is still missing is a set of tools for translating the research results into practice. This paper discusses: 1) the importance of translating the research results related to the safety of workers and safety planning of nighttime work zones into practice, and 2) examples of tools that can be used for translating the results of such studies into practice. A tool that can propose safety recommendations in nighttime work zones and a web-based safety training tool for workers are presented in this paper. The tools were created as a component of a five-year research study on the assessment of the safety of nighttime roadway construction. The objectives of both tools are explained as well as their functionalities (i.e., what the tools can do for the users); their components (e.g., knowledge base, database, and interfaces); and their structures (i.e., how the components of the tools are organized to meet the objectives). Evaluations by the proposed users of each tool are also presented.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Financial innovations have emerged globally to close the gap between the rising global demand for infrastructures and the availability of financing sources offered by traditional financing mechanisms such as fuel taxation, tax-exempt bonds, and federal and state funds. The key to sustainable innovative financing mechanisms is effective policymaking. This paper discusses the theoretical framework of a research study whose objective is to structurally and systemically assess financial innovations in global infrastructures. The research aims to create analysis frameworks, taxonomies and constructs, and simulation models pertaining to the dynamics of the innovation process to be used in policy analysis. Structural assessment of innovative financing focuses on the typologies and loci of innovations and evaluates the performance of different types of innovative financing mechanisms. Systemic analysis of innovative financing explores the determinants of the innovation process using the System of Innovation approach. The final deliverables of the research include propositions pertaining to the constituents of System of Innovation for infrastructure finance which include the players, institutions, activities, and networks. These static constructs are used to develop a hybrid Agent-Based/System Dynamics simulation model to derive propositions regarding the emergent dynamics of the system. The initial outcomes of the research study are presented in this paper and include: (a) an archetype for mapping innovative financing mechanisms, (b) a System of Systems-based analysis framework to identify the dimensions of Systems of Innovation analyses, and (c) initial observations regarding the players, institutions, activities, and networks of the System of Innovation in the context of the U.S. transportation infrastructure financing.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trenchless methods have been considered to be a viable solution for pipeline projects in urban areas. Their applicability in pipeline projects is expected to increase with the rapid advancements in technology and emerging concerns regarding social costs related to trenching methods. Selecting appropriate project delivery system (PDS) is a key to the success of trenchless projects. To ensure success of the project, the selected project delivery should be tailored to trenchless project specific characteristics and owner needs, since the effectiveness of project delivery systems differs based on different project characteristics and owners requirements. Since different trenchless methods have specific characteristics such rate of installation, lengths of installation, and accuracy, the same project delivery systems may not be equally effective for different methods. The intent of this paper is to evaluate the appropriateness of different PDS for different trenchless methods. PDS are examined through a structured decision-making process called Fuzzy Delivery System Selection Model (FDSSM). The process of incorporating the impacts of: (a) the characteristics of trenchless projects and (b) owners’ needs in the FDSSM is performed by collecting data using questionnaires deployed to professionals involved in the trenchless industry in order to determine the importance of delivery systems selection attributes for different trenchless methods, and then analyzing this data. The sensitivity of PDS rankings with respect to trenchless methods is considered in order to evaluate whether similar project delivery systems are equally effective in different trenchless methods. The effectiveness of PDS with respect to attributes is defined as follows: a project delivery system is most effective with respect to an attribute (e.g., ability to control growth in costs ) if there is no project delivery system that is more effective than that PDS. The results of this study may assist trenchless project owners to select the appropriate PDS for the trenchless method selected.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Infrastructure systems are drivers of the economy in the nation. A dollar spent on infrastructure development yields roughly double the initial spending in ultimate economic output in the short term; and over a twenty-year period, and generalized ‘public investment’ produces an aggregated $3.21 of economic activity per $1.00 spent [1]. Thus, formulation of policies pertaining to infrastructure investment and development is of significance affecting the social and economic wellbeing of the nation. The aim of this policy brief is to evaluate innovative financing in infrastructure systems from two different perspectives: (1) through consideration of the current condition of infrastructure in the U.S., the current trends in public spending, and the emerging innovative financing tools; (2) through evaluation of the roles and interactions of different agencies in the creation and the diffusion of innovative financing tools. Then using the example of transportation financing, the policy brief provides an assessment of policy landscapes which could lead to the closure of infrastructure financing gap in the U.S and proposes strategies for citizen involvement to gain public support of innovative financing.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The purpose of this study was to examine the factorsbehind the failure rates of Associate in Arts (AA)graduates from Miami-Dade Community College (M-DCC) transferring to the Florida State University System (SUS). In M-DCC's largest disciplines, the university failure rate was 13% for Business & Management, 13% for Computer Science, and 14% for Engineering. Hypotheses tested were: Hypothesis 1 (H1): The lower division (LD) overall cumulative GPA and/or the LD major field GPA for AA graduates are predictive of the SUS GPA for the Business Management, Computer Science, and Engineering disciplines. Hypothesis 2 (H2): Demographic variables (age, race, gender) are predictive of performance at the university among M-DCC AA graduates in Engineering, Business & Management, and Computer Science. Hypothesis 3 (H3): Administrative variables (CLAST -College Level Academic Skills Test subtests) are predictive of university performance (GPA) for the Business/Management, Engineering, and Computer Science disciplines. Hypothesis 4 (H4): LD curriculum variables (course credits, course quality points) are predictive of SUS performance for the Engineering, Business/Management and Computer Science disciplines. Multiple Regression was the inferential procedureselected for predictions. Descriptive statistics weregenerated on the predictors. Results for H1 identified the LD GPA as the most significant variable in accounting for the variability of the university GPA for the Business & Management, Computer Science, and Engineering disciplines. For H2, no significant results were obtained for theage and gender variables, but the ethnic subgroups indicated significance at the .0001 level. However, differentials in GPA may not have been due directly to the race factor but, rather, to curriculum choices and performance outcomes while in the LD. The CLAST computation variable (H3) was a significant predictor of the SUS GPA. This is most likely due to the mathematics structure pervasive in these disciplines. For H4, there were two curriculum variables significant in explaining the variability of the university GPA (number of required critical major credits completed and quality of the student's performance for these credits). Descriptive statistics on the predictors indicated that 78% of those failing in the State University System had a LD major GPA (calculated with the critical required university credits earned and quality points of these credits) of less than 3.0; and 83% of those failing at the university had an overall community college GPA of less than 3.0.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Non-Destructive Testing (NDT) of deep foundations has become an integral part of the industry’s standard manufacturing processes. It is not unusual for the evaluation of the integrity of the concrete to include the measurement of ultrasonic wave speeds. Numerous methods have been proposed that use the propagation speed of ultrasonic waves to check the integrity of concrete for drilled shaft foundations. All such methods evaluate the integrity of the concrete inside the cage and between the access tubes. The integrity of the concrete outside the cage remains to be considered to determine the location of the border between the concrete and the soil in order to obtain the diameter of the drilled shaft. It is also economic to devise a methodology to obtain the diameter of the drilled shaft using the Cross-Hole Sonic Logging system (CSL). Performing such a methodology using the CSL and following the CSL tests is performed and used to check the integrity of the inside concrete, thus allowing the determination of the drilled shaft diameter without having to set up another NDT device. This proposed new method is based on the installation of galvanized tubes outside the shaft across from each inside tube, and performing the CSL test between the inside and outside tubes. From the performed experimental work a model is developed to evaluate the relationship between the thickness of concrete and the ultrasonic wave properties using signal processing. The experimental results show that there is a direct correlation between concrete thicknesses outside the cage and maximum amplitude of the received signal obtained from frequency domain data. This study demonstrates how this new method to measuring the diameter of drilled shafts during construction using a NDT method overcomes the limitations of currently-used methods. In the other part of study, a new method is proposed to visualize and quantify the extent and location of the defects. It is based on a color change in the frequency amplitude of the signal recorded by the receiver probe in the location of defects and it is called Frequency Tomography Analysis (FTA). Time-domain data is transferred to frequency-domain data of the signals propagated between tubes using Fast Fourier Transform (FFT). Then, distribution of the FTA will be evaluated. This method is employed after CSL has determined the high probability of an anomaly in a given area and is applied to improve location accuracy and to further characterize the feature. The technique has a very good resolution and clarifies the exact depth location of any void or defect through the length of the drilled shaft for the voids inside the cage. The last part of study also evaluates the effect of voids inside and outside the reinforcement cage and corrosion in the longitudinal bars on the strength and axial load capacity of drilled shafts. The objective is to quantify the extent of loss in axial strength and stiffness of drilled shafts due to presence of different types of symmetric voids and corrosion throughout their lengths.