4 resultados para End post squashing
em Digital Commons at Florida International University
Resumo:
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of factors that include variables that relate to operations both before and after the closure of a landfill cell. Therefore, PCC decisions should be based on location specific factors, operational factors, design factors, post closure performance, end use, and risk analysis. The question of appropriate PCC period for Florida’s landfills requires in depth case studies focusing on the analysis of the performance data from closed landfills in Florida. Based on data availability, Davie Landfill was identified as case study site for a case by case analysis of landfill stability. The performance based PCC decision system developed by Geosyntec Consultants was used for the assessment of site conditions to project PCC needs. The available data for leachate and gas quantity and quality, ground water quality, and cap conditions were evaluated. The quality and quantity data for leachate and gas were analyzed to project the levels of pollutants in leachate and groundwater in reference to maximum contaminant level (MCL). In addition, the projected amount of gas quantity was estimated. A set of contaminants (including metals and organics) were identified as contaminants detected in groundwater for health risk assessment. These contaminants were selected based on their detection frequency and levels in leachate and ground water; and their historical and projected trends. During the evaluations a range of discrepancies and problems that related to the collection and documentation were encountered and possible solutions made. Based on the results of PCC performance integrated with risk assessment, projection of future PCC monitoring needs and sustainable waste management options were identified. According to these results, landfill gas monitoring can be terminated, leachate and groundwater monitoring for parameters above MCL and surveying of the cap integrity should be continued. The parameters which cause longer monitoring periods can be eliminated for the future sustainable landfills. As a conclusion, 30 year PCC period can be reduced for some of the landfill components based on their potential impacts to human health and environment (HH&E).
Resumo:
This paper assesses the status of pre-disaster risk management in the case of Turkey. By focusing on the period following the catastrophic August 17, 1999 earthquake, the study benefits from USAID’s Disaster Risk Management Benchmarking Tool (DRMBT). In line with the benchmarking tool, the paper covers key developments in the four components of pre-disaster risk management, namely: risk identification, risk mitigation, risk transfer and disaster preparedness. In the end, it will present three major conclusions: (i) Although post-1999 Turkey has made some important progress in the pre-disaster phase of DRM, particularly with the enactment of obligatory earthquake insurance and tightened standards for building construction, the country is far away from substantial levels of success in DRM. (ii) In recent years, local governments have had been given more authority in the realm of DRM, however, Turkey’s approach to DRM is still predominantly centralized at the expense of successful DRM practices at the local level. (iii) While the devastating 1999 earthquake has resulted in advances in the pre-disaster components of DRM; progress has been mostly in the realm of earthquakes. Turkey’s other major disasters (landslides, floods, wild fires i.e.) also require similar attention by local and central authorities.
Resumo:
After the end of the Cold War, democratization and good governance became the organizing concepts for activities of the United Nations, regional organizations and states in the fields of peace, development and security. How can this increasing interest in democratization and its connection with international security be explained? This dissertation applies the theoretical tools developed by Michel Foucault in his discussions of disciplinarity and government to the analysis of the United Nations debate on democracy in the 1990s, and of two United Nations pro-democracy peacekeeping operations and their aftermath: the United Nations interventions in Haiti and Croatia. It probes “how” certain techniques of power came into being and describes their effects, using as data the texts that elaborate the United Nations understanding of democracy and the texts that constitute peacekeeping. ^ In the face of the proliferation of unpredictable threats in the last decades of the twentieth century a new form of international power emerged. Order in the international arena increasingly was maintained through activities aimed at reducing risk and increasing predictability through the normalization of “rogue” states. The dissertation shows that in the context of these activities, which included but were not limited to UN peacekeeping, normality was identified with democracy, non-democratic regimes with international threats, and democratization with international security. “Good governance” doctrines translated the political debate on democracy into the technical language of functioning state institutions. International organizations adopted good governance as the framework that made democratization a universal task within the reach of their expertise. In Haiti, the United Nations engaged in efforts to transform punishment institutions (the judiciary, police and the prison) into disciplined and disciplinary machines. In Croatia, agreements signed in the context of peacekeeping established in detail the rules of functioning of administrations and the monitoring mechanisms for their implementation. However, in Haiti, the institutions promoted were not sustainable. And in Croatia reforms are stalled by lack of consensus. ^ This dissertation puts efforts to bring about democracy through peacekeeping in the context of a specific modality of power and suggests caution in engaging in universal normalizing endeavors. ^
Resumo:
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of factors that include variables that relate to operations both before and after the closure of a landfill cell. Therefore, PCC decisions should be based on location specific factors, operational factors, design factors, post closure performance, end use, and risk analysis. The question of appropriate PCC period for Florida’s landfills requires in depth case studies focusing on the analysis of the performance data from closed landfills in Florida. Based on data availability, Davie Landfill was identified as case study site for a case by case analysis of landfill stability. The performance based PCC decision system developed by Geosyntec Consultants was used for the assessment of site conditions to project PCC needs. The available data for leachate and gas quantity and quality, ground water quality, and cap conditions were evaluated. The quality and quantity data for leachate and gas were analyzed to project the levels of pollutants in leachate and groundwater in reference to maximum contaminant level (MCL). In addition, the projected amount of gas quantity was estimated. A set of contaminants (including metals and organics) were identified as contaminants detected in groundwater for health risk assessment. These contaminants were selected based on their detection frequency and levels in leachate and ground water; and their historical and projected trends. During the evaluations a range of discrepancies and problems that related to the collection and documentation were encountered and possible solutions made. Based on the results of PCC performance integrated with risk assessment, projection of future PCC monitoring needs and sustainable waste management options were identified. According to these results, landfill gas monitoring can be terminated, leachate and groundwater monitoring for parameters above MCL and surveying of the cap integrity should be continued. The parameters which cause longer monitoring periods can be eliminated for the future sustainable landfills. As a conclusion, 30 year PCC period can be reduced for some of the landfill components based on their potential impacts to human health and environment (HH&E).