3 resultados para Construction techniques

em Digital Commons at Florida International University


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Lineup procedures have recently garnered extensive empirical attention, in an effort to reduce the number of mistaken identifications that plague the criminal justice system. Relatively little attention, however, has been paid to the influence of the lineup constructor or the lineup construction technique on the quality of the lineup. This study examined whether the cross-race effect has an influence on the quality of lineups constructed using a match-to-suspect or match-to-description technique in a series of three phases. Participants generated descriptions of same- and other-race targets in Phase 1, which were used in Phase 2. In Phase 2, participants were asked to create lineups for own-race targets and other-race targets using one of two techniques. The lineups created in this phase were examined for lineup quality in Phase 3 by calculating lineup fairness assessments through the use of a mock witness paradigm. ^ Overall, the results of these experiment phases suggest that the race of those involved in the lineup construction process influences lineups. There was no difference in witness description accuracy in Phase 1, which ran counter to predictions based on the cross-race effect. The cross-race effect was observed, however, in Phases 2 and 3. The lineup construction technique used also influenced several of the process measures, selection estimates, and fairness judgments in Phase 2. Interestingly, the presence of the cross-race effect was in the opposite direction as predicted for some measures in both phases. In Phase 2, the cross-race effect was as predicted for number of foils viewed, but in the opposite direction for average time spent viewing each foil. In Phase 3, the cross-race effect was in the opposite direction than predicted, with higher levels of lineup fairness in other-race lineups. The practical implications of these findings are discussed in relation to lineup fairness within the legal system. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, non-integrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. ^ A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. ^ One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, nonintegrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects.