6 resultados para Construction process improvement
em Digital Commons at Florida International University
Resumo:
This dissertation develops a process improvement method for service operations based on the Theory of Constraints (TOC), a management philosophy that has been shown to be effective in manufacturing for decreasing WIP and improving throughput. While TOC has enjoyed much attention and success in the manufacturing arena, its application to services in general has been limited. The contribution to industry and knowledge is a method for improving global performance measures based on TOC principles. The method proposed in this dissertation will be tested using discrete event simulation based on the scenario of the service factory of airline turnaround operations. To evaluate the method, a simulation model of aircraft turn operations of a U.S. based carrier was made and validated using actual data from airline operations. The model was then adjusted to reflect an application of the Theory of Constraints for determining how to deploy the scarce resource of ramp workers. The results indicate that, given slight modifications to TOC terminology and the development of a method for constraint identification, the Theory of Constraints can be applied with success to services. Bottlenecks in services must be defined as those processes for which the process rates and amount of work remaining are such that completing the process will not be possible without an increase in the process rate. The bottleneck ratio is used to determine to what degree a process is a constraint. Simulation results also suggest that redefining performance measures to reflect a global business perspective of reducing costs related to specific flights versus the operational local optimum approach of turning all aircraft quickly results in significant savings to the company. Savings to the annual operating costs of the airline were simulated to equal 30% of possible current expenses for misconnecting passengers with a modest increase in utilization of the workers through a more efficient heuristic of deploying them to the highest priority tasks. This dissertation contributes to the literature on service operations by describing a dynamic, adaptive dispatch approach to manage service factory operations similar to airline turnaround operations using the management philosophy of the Theory of Constraints.
Resumo:
Lineup procedures have recently garnered extensive empirical attention, in an effort to reduce the number of mistaken identifications that plague the criminal justice system. Relatively little attention, however, has been paid to the influence of the lineup constructor or the lineup construction technique on the quality of the lineup. This study examined whether the cross-race effect has an influence on the quality of lineups constructed using a match-to-suspect or match-to-description technique in a series of three phases. Participants generated descriptions of same- and other-race targets in Phase 1, which were used in Phase 2. In Phase 2, participants were asked to create lineups for own-race targets and other-race targets using one of two techniques. The lineups created in this phase were examined for lineup quality in Phase 3 by calculating lineup fairness assessments through the use of a mock witness paradigm. ^ Overall, the results of these experiment phases suggest that the race of those involved in the lineup construction process influences lineups. There was no difference in witness description accuracy in Phase 1, which ran counter to predictions based on the cross-race effect. The cross-race effect was observed, however, in Phases 2 and 3. The lineup construction technique used also influenced several of the process measures, selection estimates, and fairness judgments in Phase 2. Interestingly, the presence of the cross-race effect was in the opposite direction as predicted for some measures in both phases. In Phase 2, the cross-race effect was as predicted for number of foils viewed, but in the opposite direction for average time spent viewing each foil. In Phase 3, the cross-race effect was in the opposite direction than predicted, with higher levels of lineup fairness in other-race lineups. The practical implications of these findings are discussed in relation to lineup fairness within the legal system. ^
Resumo:
Bonded repair of concrete structures with fiber reinforced polymer (FRP) systems is increasingly being accepted as a cost-efficient and structurally viable method of rapid rehabilitation of concrete structures. However, the relationships between long-term performance attributes, service-life, and details of the installation process are not easy to quantify. Accordingly, there is currently a lack of generally accepted construction specifications, making it difficult for the field engineer to certify the adequacy of the construction process. ^ The objective of the present study, as part of the National Cooperative Highway Research Program (NCHRP) Project 10-59B, was to investigate the effect of surface preparation on the behavior of wet lay-up FRP repair systems and consequently develop rational thresholds that provide sufficient performance. ^ The research program was comprised of both experimental and analytical work for wet lay-up FRP applications. The experimental work included flexure testing of sixty-seven (67) reinforced concrete beams and bond testing of ten (10) reinforced concrete blocks. Four different parameters were studied: surface roughness, surface flatness, surface voids and bug holes, and surface cracks/cuts. The findings were analyzed from various aspects and compared with the data available in the literature. As part of the analytical work, finite element models of the flexural specimens with surface flaws were developed using ANSYS. The purpose of this part was to extend the parametric study on the effects of concrete surface flaws and verify the experimental results based on nonlinear finite element analysis. ^ Test results showed that surface roughness does not appear to have a significant influence on the overall performance of the wet lay-up FRP systems with or without adequate anchorage, and whether failure was by debonding or rupture of FRP. Both experimental and analytical results for surface flatness proved that peaks on concrete surface, in the range studied, do not have a significant effect on the performance of wet lay-up FRP systems. However, valleys of particular size could reduce the strength of wet lay-up FRP systems. Test results regarding surface voids and surface cracks/cuts revealed that previously suggested thresholds for these flaws appear to be conservative, as also confirmed by analytical study. ^
Resumo:
In the U.S., construction accidents remain a significant economic and social problem. Despite recent improvement, the Construction industry, generally, has lagged behind other industries in implementing safety as a total management process for achieving zero accidents and developing a high-performance safety culture. One aspect of this total approach to safety that has frustrated the construction industry the most has been “measurement”, which involves identifying and quantifying the factors that critically influence safe work behaviors. The basic problem attributed is the difficulty in assessing what to measure and how to measure it—particularly the intangible aspects of safety. Without measurement, the notion of continuous improvement is hard to follow. This research was undertaken to develop a strategic framework for the measurement and continuous improvement of total safety in order to achieve and sustain the goal of zero accidents, while improving the quality, productivity and the competitiveness of the construction industry as it moves forward. The research based itself on an integral model of total safety that allowed decomposition of safety into interior and exterior characteristics using a multiattribute analysis technique. Statistical relationships between total safety dimensions and safety performance (measured by safe work behavior) were revealed through a series of latent variables (factors) that describe the total safety environment of a construction organization. A structural equation model (SEM) was estimated for the latent variables to quantify relationships among them and between these total safety determinants and safety performance of a construction organization. The developed SEM constituted a strategic framework for identifying, measuring, and continuously improving safety as a total concern for achieving and sustaining the goal of zero accidents.
Resumo:
Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^
Resumo:
Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.