21 resultados para Make-to-Order Operations


Relevância:

100.00% 100.00%

Publicador:

Resumo:

School principals' leadership is key to successful school reform, as is increased student achievement. This nonexperimental ex post facto study tested relationships among secondary school principals' leadership behaviors, school climate, and student achievement. Of 165 secondary school principals from the three largest school districts in South Florida, 58 completed three online survey instruments: the Leadership Practices Inventory, School Climate Inventory-Revised, and researcher-designed Demographic Questionnaire. Student achievement was measured by students' scores on the reading and mathematics Florida Comprehensive Assessment Tests. Three null hypotheses tested relationships among (a) five principals' leadership behaviors and seven domains of school climate; (b) principals' leadership behaviors and student achievement; and (c) principals' leadership behaviors, school climate, and student achievement. Multiple linear regressions were used to determine the degree to which the independent variables predicted the dependent variables for the first two hypotheses. ANOVAs tested possible group differences between the demographic and research variables as controls for the third hypothesis. Partial correlational analyses tested the strength and direction of relationships among leadership behaviors, climate, and achievement. Results revealed partial support of the hypotheses. None of the leadership variables significantly predicted school climate. No significant relationships were found among the five leadership behaviors and student achievement. Demographic group differences in school climate and student achievement were marginally significant. The leadership behaviors of Inspiring a Shared Vision and Enabling Others to Act were positively linked to reading achievement. Partial correlations were found (r .27 to −.35) among school climate variables of Order, Involvement, and Expectation and achievement variables. The Modeling the Way leadership variable was negatively associated with reading achievement. After controlling for gender, years at current school, and years in the district, partial positive correlations were found among leadership, school climate, and student achievement. Inspiring a Shared Vision, Enabling Others to Act, Encouraging the Heart, and Challenging the Process leadership variables were partially correlated to Order, Leadership (Instructional), and Expectation climate variables. Study results should provide policymakers and educators with a leadership profile for school leaders challenging the status quo who can create schools for enhanced student learning and relevance to the needs of students, families, and society.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

A heuristic for batching orders in a manual order-picking warehouse has been developed. It prioritizes orders based on due time to prevent mixing of orders of different priority levels. The order density of aisles criterion is used to form batches. It also determines the number of pickers required and assigns batches to pickers such that there is a uniform workload per unit of time. The effectiveness of the heuristic was studied by observing computational time and aisle congestion for various numbers of total orders and number of orders that form a batch. An initial heuristic performed well for small number of orders, but for larger number of orders, a partitioning technique is computationally more efficient, needing only minutes to solve for thousands of orders, while preserving 90% of the batch quality obtained with the original heuristic. Comparative studies between the heuristic and other published heuristics are needed. ^

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, non-integrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. ^ A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. ^ One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects. ^

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, nonintegrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Parallel processing is prevalent in many manufacturing and service systems. Many manufactured products are built and assembled from several components fabricated in parallel lines. An example of this manufacturing system configuration is observed at a manufacturing facility equipped to assemble and test web servers. Characteristics of a typical web server assembly line are: multiple products, job circulation, and paralleling processing. The primary objective of this research was to develop analytical approximations to predict performance measures of manufacturing systems with job failures and parallel processing. The analytical formulations extend previous queueing models used in assembly manufacturing systems in that they can handle serial and different configurations of paralleling processing with multiple product classes, and job circulation due to random part failures. In addition, appropriate correction terms via regression analysis were added to the approximations in order to minimize the gap in the error between the analytical approximation and the simulation models. Markovian and general type manufacturing systems, with multiple product classes, job circulation due to failures, and fork and join systems to model parallel processing were studied. In the Markovian and general case, the approximations without correction terms performed quite well for one and two product problem instances. However, it was observed that the flow time error increased as the number of products and net traffic intensity increased. Therefore, correction terms for single and fork-join stations were developed via regression analysis to deal with more than two products. The numerical comparisons showed that the approximations perform remarkably well when the corrections factors were used in the approximations. In general, the average flow time error was reduced from 38.19% to 5.59% in the Markovian case, and from 26.39% to 7.23% in the general case. All the equations stated in the analytical formulations were implemented as a set of Matlab scripts. By using this set, operations managers of web server assembly lines, manufacturing or other service systems with similar characteristics can estimate different system performance measures, and make judicious decisions - especially setting delivery due dates, capacity planning, and bottleneck mitigation, among others.