23 resultados para Inquiry-Based Activities
Resumo:
Faced with the violence, criminality and insecurity now threatening peace and democratic governance in Central America, the region’s governments have decided to use the Armed Forces to carry out actions in response to criminal actions, looking to improve their performance. Although public demand for including the Armed Forces in these functions takes place within a legally legitimate framework, it is motivated by tangible circumstances such as increased levels of violence, delinquency and crime. Despite being coupled with the perception of institutional weakness within the security and judicial system (particularly police) and the recognition of prestige, efficiency, discipline and severity in fulfilling the Armed Forces’ missions, these arguments are insufficient to legitimize the use of the military as a police force. Within this context, this paper reflects on the implications or consequences of the use of the Armed Forces in duties traditionally assigned to the police in the Central American region with the goal of contributing to the debate on this topic taking place in the Americas. To achieve this end, first we will focus on understanding the actual context in which a decision is made to involve the Armed Forces in security duties in the region. Second, we will examine the effects and implications of this decision on the Armed Forces’ relations within their respective societies. Third and finally, considering this is already a reality in the region, this paper will provide recommendations. The main findings of this research, resulting from the application of an analyticaldescriptive and historically based study, are organized in three dimensions: the political dimension, by implication referring to the relationship between the ultimate political authority and the Armed Forces; the social dimension, by implication the opinion of citizens; and other implications not only affecting the structural and cultural organization of armies and police but also the complementary operational framework within a context of comprehensive response by the State. As a main conclusion, it poses there is an environment conducive to the use of the Armed Forces in citizen’s security, in view of the impact of threats provoked by criminal structures of a military nature currently operating in Central America. However, this participation creates an inevitable social and political impact if implemented in isolation or given a political leading role and/or operational autonomy. This participation poses risks to the institutions of the Armed Forces and the police as well. Finally, this paper identifies an urgent need for the Armed Forces’ role to be more clearly defined with regard to security matters, limiting it to threats that impact States’ governability and existence. Nonetheless, Central American States should seek a COMPREHENSIVE response to current crime and violence, using all necessary institutions to confront these challenges, but with defined roles and responsibilities for each and dynamic coordination to complement their actions.
Resumo:
This study was a qualitative investigation to ascertain and describe two of the current issues at the International Community School of Abidjan, examine their historical bases, and analyze their impact on the school environment.^ Two issues emerged during the inquiry phase of this study: (1) the relationship between local-hired and overseas-hired teachers in light of the January 1994 devaluation which polarized the staff by negating a four-year salary scale that established equity, (2) the school community's wide variance in the perceived power that the U.S. Embassy has on school operations based on its role as ICSA's founding sponsor.^ A multiple studies approach was used in gathering data. An extensive examination of the school's archives was used to reconstruct an historical overview of ICSA. An initial questionnaire was distributed to teachers and administrators at an educational conference to determine the scope of the 1994 devaluation of the West and Central African CFA and its impact on school personnel in West African American-sponsored overseas schools (ASOS). Personal interviews were conducted with the school staff, administration, school board members, and relevant historical participants to determine the principal issues at ICSA at that time. The researcher, an overseas-hired teacher, also used participant observations to collect data. Findings based on these sources were used to analyze the two issues from an historical perspective and to form conclusions.^ Findings in this study pertaining to the events induced by the French and African governments' decision to implement a currency devaluation in January 1994 were presented in ex post-facto chronological narrative form to describe the events which transpired, describe the perception of school personnel involved in these events, examine the final resolution and interpret these events within a historical framework for analysis.^ The topic of the U.S. Embassy and its role at ICSA emerged inductively from open-ended personal interviews conducted over the course of a year. Contradictory perspectives were examined and researched for accuracy and cause. The results of this inquiry presented the U.S. Embassy role at ICSA from a two-sided perspective, examined the historical role of the Embassy, and presented means by which the role and responsibility of the U.S. Embassy could best be communicated to the school community.^ The final chapter provides specific actions for mediation of problems stemming from these issues, implications for administrators and teachers currently involved in overseas schools or considering the possibility, and suggestions for future inquiries.^ Examination of a two-tier salary scale for local-hired and overseas-hired teachers generated the following recommendations: movement towards a single salary scale when feasible, clearly stated personnel policies and full disclosure of benefits, a uniform certification standard, professional development programs and awareness of the impact of this issue on staff morale.^ Divergent perceptions and attitudes toward the role of the U.S. Embassy produced these recommendations: a view towards limiting the number of Americans on ASOS school boards, open school board meetings, selection of Embassy Administrative Officers who can educate school communities on the exact role of the Embassy, educating parents through the outreach activities that communicate American educational philosophy and involve all segments of the international community, and a firm effort on the part of the ASOS to establish the school's autonomy from special interests. ^
Resumo:
The distribution and abundance of the American crocodile (Crocodylus acutus) in the Florida Everglades is dependent on the timing, amount, and location of freshwater flow. One of the goals of the Comprehensive Everglades Restoration Plan (CERP) is to restore historic freshwater flows to American crocodile habitat throughout the Everglades. To predict the impacts on the crocodile population from planned restoration activities, we created a stage-based spatially explicit crocodile population model that incorporated regional hydrology models and American crocodile research and monitoring data. Growth and survival were influenced by salinity, water depth, and density-dependent interactions. A stage-structured spatial model was used with discrete spatial convolution to direct crocodiles toward attractive sources where conditions were favorable. The model predicted that CERP would have both positive and negative impacts on American crocodile growth, survival, and distribution. Overall, crocodile populations across south Florida were predicted to decrease approximately 3 % with the implementation of CERP compared to future conditions without restoration, but local increases up to 30 % occurred in the Joe Bay area near Taylor Slough, and local decreases up to 30 % occurred in the vicinity of Buttonwood Canal due to changes in salinity and freshwater flows.
Resumo:
Shallow marine ecosystems are experiencing significant environmental alterations as a result of changing climate and increasing human activities along coasts. Intensive urbanization of the southeast Florida coast and intensification of climate change over the last few centuries changed the character of coastal ecosystems in the semi-enclosed Biscayne Bay, Florida. In order to develop management policies for the Bay, it is vital to obtain reliable scientific evidence of past ecological conditions. The long-term records of subfossil diatoms obtained from No Name Bank and Featherbed Bank in the Central Biscayne Bay, and from the Card Sound Bank in the neighboring Card Sound, were used to study the magnitude of the environmental change caused by climate variability and water management over the last ~ 600 yr. Analyses of these records revealed that the major shifts in the diatom assemblage structures at No Name Bank occurred in 1956, at Featherbed Bank in 1966, and at Card Sound Bank in 1957. Smaller magnitude shifts were also recorded at Featherbed Bank in 1893, 1942, 1974 and 1983. Most of these changes coincided with severe drought periods that developed during the cold phases of El Niño Southern Oscillation (ENSO), Atlantic Multidecadal Oscillation (AMO) and Pacific Decadal Oscillation (PDO), or when AMO was in warm phase and PDO was in the cold phase. Only the 1983 change coincided with an unusually wet period that developed during the warm phases of ENSO and PDO. Quantitative reconstructions of salinity using the weighted averaging partial least squares (WA-PLS) diatom-based salinity model revealed a gradual increase in salinity at the three coring locations over the last ~ 600 yr, which was primarily caused by continuously rising sea level and in the last several decades also by the reduction of the amount of freshwater inflow from the mainland. Concentration of sediment total nitrogen (TN), total phosphorus (TP) and total organic carbon (TOC) increased in the second half of the 20th century, which coincided with the construction of canals, landfills, marinas and water treatment plants along the western margin of Biscayne Bay. Increased magnitude and rate of the diatom assemblage restructuring in the mid- and late-1900s, suggest that large environmental changes are occurring more rapidly now than in the past.
Resumo:
Performance-based maintenance contracts differ significantly from material and method-based contracts that have been traditionally used to maintain roads. Road agencies around the world have moved towards a performance-based contract approach because it offers several advantages like cost saving, better budgeting certainty, better customer satisfaction with better road services and conditions. Payments for the maintenance of road are explicitly linked to the contractor successfully meeting certain clearly defined minimum performance indicators in these contracts. Quantitative evaluation of the cost of performance-based contracts has several difficulties due to the complexity of the pavement deterioration process. Based on a probabilistic analysis of failures of achieving multiple performance criteria over the length of the contract period, an effort has been made to develop a model that is capable of estimating the cost of these performance-based contracts. One of the essential functions of such model is to predict performance of the pavement as accurately as possible. Prediction of future degradation of pavement is done using Markov Chain Process, which requires estimating transition probabilities from previous deterioration rate for similar pavements. Transition probabilities were derived using historical pavement condition rating data, both for predicting pavement deterioration when there is no maintenance, and for predicting pavement improvement when maintenance activities are performed. A methodological framework has been developed to estimate the cost of maintaining road based on multiple performance criteria such as crack, rut and, roughness. The application of the developed model has been demonstrated via a real case study of Miami Dade Expressways (MDX) using pavement condition rating data from Florida Department of Transportation (FDOT) for a typical performance-based asphalt pavement maintenance contract. Results indicated that the pavement performance model developed could predict the pavement deterioration quite accurately. Sensitivity analysis performed shows that the model is very responsive to even slight changes in pavement deterioration rate and performance constraints. It is expected that the use of this model will assist the highway agencies and contractors in arriving at a fair contract value for executing long term performance-based pavement maintenance works.
Resumo:
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30 years for non hazardous wastes in landfills. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to ensure that landfill gas does not migrate off site or into on site buildings. The decision to reduce PCC duration requires exploration of a performance based methodology to Florida landfills. PCC should be based on whether the landfill is a threat to human health or the environment. Historically no risk based procedure has been available to establish an early end to PCC. Landfill stability depends on a number of factors that include variables that relate to operations both before and after the closure of a landfill cell. Therefore, PCC decisions should be based on location specific factors, operational factors, design factors, post closure performance, end use, and risk analysis. The question of appropriate PCC period for Florida’s landfills requires in depth case studies focusing on the analysis of the performance data from closed landfills in Florida. Based on data availability, Davie Landfill was identified as case study site for a case by case analysis of landfill stability. The performance based PCC decision system developed by Geosyntec Consultants was used for the assessment of site conditions to project PCC needs. The available data for leachate and gas quantity and quality, ground water quality, and cap conditions were evaluated. The quality and quantity data for leachate and gas were analyzed to project the levels of pollutants in leachate and groundwater in reference to maximum contaminant level (MCL). In addition, the projected amount of gas quantity was estimated. A set of contaminants (including metals and organics) were identified as contaminants detected in groundwater for health risk assessment. These contaminants were selected based on their detection frequency and levels in leachate and ground water; and their historical and projected trends. During the evaluations a range of discrepancies and problems that related to the collection and documentation were encountered and possible solutions made. Based on the results of PCC performance integrated with risk assessment, projection of future PCC monitoring needs and sustainable waste management options were identified. According to these results, landfill gas monitoring can be terminated, leachate and groundwater monitoring for parameters above MCL and surveying of the cap integrity should be continued. The parameters which cause longer monitoring periods can be eliminated for the future sustainable landfills. As a conclusion, 30 year PCC period can be reduced for some of the landfill components based on their potential impacts to human health and environment (HH&E).
Resumo:
The effective control of production activities in dynamic job shop with predetermined resource allocation for all the jobs entering the system is a unique manufacturing environment, which exists in the manufacturing industry. In this thesis a framework for an Internet based real time shop floor control system for such a dynamic job shop environment is introduced. The system aims to maintain the schedule feasibility of all the jobs entering the manufacturing system under any circumstance. The system is capable of deciding how often the manufacturing activities should be monitored to check for control decisions that need to be taken on the shop floor. The system will provide the decision maker real time notification to enable him to generate feasible alternate solutions in case a disturbance occurs on the shop floor. The control system is also capable of providing the customer with real time access to the status of the jobs on the shop floor. The communication between the controller, the user and the customer is through web based user friendly GUI. The proposed control system architecture and the interface for the communication system have been designed, developed and implemented.
Resumo:
This action research project will investigate the relationship between participation in extracurricular activities and academic achievement of students in the fourth grade. Students’ achievement scores on the FAIR exams will be the measure of academic success. Analysis will consist of a correlation between extracurricular activities and academic success.