2 resultados para Subestações eletricas
em Universidade Federal de Uberlândia
Resumo:
This study describes the development of a prototype to evaluate the potential of environments based on two-dimensional modeling and virtual reality as power substations learning objects into training environments from a central operation and control of power utility Cemig. Initially, there was an identification modeling features and cognitive processes in 2D and RV, from which it was possible to create frames that serve to guide the preparation of a checklist with assigning a metric weight for measuring cognitive potential learning in the study sites. From these contents twenty-four questions were prepared and each was assigned a weight that was used in the calculation of the metric; the questions were grouped into skill sets and similar cognitive processes called categories. Were then developed two distinct environments: the first, the prototype features an interactive checklist and your individual results. And, second, a system of data management environment for the configuration and editing of the prototype, and the observation and analysis of the survey results. For prototype validation, were invited to access the virtual checklist and answer it, five professionals linked to Cemig's training area. The results confirmed the validity of this instrument application to assess the possible potential of modeling in 2D and RV as learning objects in power substations, as well as provide feedback to developers of virtual environments to improve the system.
Resumo:
The Virtual Reality techniques applied in Electricity Environments provide a new supervisory control paradigm. The fact of existing a virtual environment (VE), geometrically similar to a real substation, reduces the difference of mental models built by field operators compared with those built by system center operation improving the communication. Beside this, those systems can be used as visualization interfaces for electricity system simulators, training systems for professors and undergraduate students, field operators and maintenance professionals. However, the development process of these systems is quite complex, combining several activities such as implementation, 3D modeling, virtual sceneries construction, usability assessment and management project techniques. In this context, this work present a GUI strategy to build field arrangements based on scene graphs, to reduce time in Virtual Electricity Substations Arrangement development. Through this, mistakes during the VE building can be avoided making this process more reliable. As an concept proof, all toolkits developed in this work were applied in the virtualization of the substations from a Brazilian power concessionary named CEMIG.